查询词典 hydropower
- 与 hydropower 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
It will be widely used in the hydropower stations.
因此,具有广阔的应用前景。
-
The whole process of superheating fault diagnosis and treatment of the 6\|th main transformer in Shuikou Hydropower Station is presented in detail.
文章详细介绍了水口水电厂6 号主变压器过热性故障的综合判断与处理的全过程。
-
A hydropower station project is built on high mountain canyon tracts of which natural slope usually has a zestier of strong unloading rock and a zestier of ebb unloading and corresponding zone of strong weathering rock, and intact fresh rock in its inside.
水电工程常常建在高山峡谷地带,其天然岸坡通常由坡面向内有一个强卸荷带和弱卸荷带以及相应的强风化和弱风化带,内侧则为完整新鲜的岩石。
-
The results is that the spillway export of Guan mao-zhou Hydropower Station high slop under the slope stability safety factor is 1.5 in the absence of state support, overall stability.
计算结果认为官帽舟水电站泄洪洞出口高边坡在无支护状态下的边坡稳定安全系数为1.5,整体稳定。
-
The local intensive rainfall caused by flood discharge atomization in downstream reach of Goupitan Hydropower Project is studied by 1∶55 physical model test and engineering analogy,the rainfall intensity and its influene area are forcasted.
通过1∶55的物理模型试验和工程类比分析,对构皮滩工程大坝泄洪雾化引起下游局部强降雨进行了研究,并对降雨强度及影响范围进行了预测。
-
We get the engage result after simulating structure-liquid couping then compared with the dynamic receptance and condition monitor.we built a finite element model of one aqueduct bridge, and compared the data of earthquake resistant experiment of China Institute of Water Resources and Hydropower Researchwith my own result, thats make sure they were engaged.
建立了某渡槽的有限元模型,并通过计算和实验数据进行对比,确保了有限元模型的准确性以及与试验模型的吻合型。
-
Based on this, it optimizes the model and the elevation of upstream and downstream cofferdam. It studies the design of the bedding course of the downstream concrete slab protection slop of overflow cofferdam. It puts forward relevant risk rate"s calculation models, and gives the risk rate"s calculation methods. Chapter 4 synthetically considers the key-points and difficulties of Shuibuya Hydropower diversion. It carries out diversion scheme suitable for Shuibuya high concrete facing rockfill dam.
对土石过水围堰下游砼板护坡反滤层设计进行了研究,提出反滤层设计的风险模型,并给出了风险率的计算方法;第四章在综合考虑水布垭导流与度汛工程的重点与难点及工程布置、施工要求的基础上,经多方案技术经济比较,研究确定了适合水布垭高面板堆石坝工程特征的导流与度汛方案。
-
This thesis systematically studies some important subjects in theoretical and applicable aspects, on which the overflow cofferdam needs to solve at present during key water control project construction, such as diversion ways and the type of overflow cofferdam, diversion standard, and the bedding course of the downstream protection slop of concrete slab on overflow cofferdam. Moreover, according to the experiment of hydraulic construction model, the thesis studies the overflow cofferdam and diversion scheme for Qingjiang Shuibuya Hydropower Project.
本文从理论和应用两个方面系统研究了水利枢纽工程施工过水围堰在导流方式及围堰类型、导流标准及围堰下游砼护坡反滤层等方面需要解决的问题,并结合水工模型试验,对清江水布垭水电站工程过水围堰及度汛方案进行研究。
-
In the water conservancy and hydropower engineering, bridge engineering, civil engineering is playing an extremely important role.
在水利水电工程、桥梁工程等土木工程领域发挥着极其重要作用。
-
The deformation monitoring items of the dam for Shanxi Hydropower Station include the elevation control network close to the dam area, plane control network of triangulation and trilateral, dam collimation line and settlement monitoring.
珊溪水电站大坝变形监测项目包括近坝区高程控制网和平面边角控制网、坝视准线及沉陷观测。
- 推荐网络例句
-
Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).
呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。
-
The cost of moving grain food products was unchanged from May, but year over year are up 8%.
粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。
-
However, to get a true quote, you will need to provide detailed personal and financial information.
然而,要让一个真正的引用,你需要提供详细的个人和财务信息。