英语人>网络例句>hydro-peening 相关的网络例句
hydro-peening相关的网络例句

查询词典 hydro-peening

与 hydro-peening 相关的网络例句 [注:此内容来源于网络,仅供参考]

Use D4 or DMC, Divinyl tetramethyl disiloxane, Tetravinyl tetramethyl cyelo tetrasiloxane were used as raw materials and Tetramethyl ammonium hydroxide as catalyst to synthesize a high molecular weight of vinyl silicone oil. Concentrate hydrosilicone oil, tetramethyl dihydro disiloxane, hexamethyldisiloxane and D4 were used to synthesize the cross linker of low-hydro silicone oil required in experiments.

以D4或DMC,乙烯基双封头,乙烯基环体等为原料,四甲基氢氧化铵为催化剂合成了不同摩尔质量的乙烯基硅油;以高含氢硅油,含氢双封头,六甲基二硅氧烷,D4合成实验所需的交联剂低含氢硅油。

As well Chinese energy companies are involved in construction of a Zhanazholskiy gas processing plant, Pavlodar electrolyze plant and Moynakskaya hydro electric station in Kazakhstan.

此外,中国能源公司还在哈萨克斯坦参与建设了Zhanazholskiy天然气处理厂,巴普洛达尔的电解厂,以及Moynakskaya水电站。

As well Chinese energy companies are involved in construction of a Zhanazholskiy gas processing plant, Pavlodar electrolyze plant and Moynakskaya hydro electric station in Kazakhstan.

同时中国的能源企业也将参与建设哈萨克斯坦境内的Zhanazholskiy天然气加工厂、 Pavlodar电解厂和Moynakskaya水电站。

At the same time the corresponding measures to dissolution of gypsum and erodent character to the concrete in the hydro-engineering are put forward.

同时针对水利工程中石膏溶蚀以及对砼的腐蚀性提出了相应的防治措施。

Established corresponding measure to dissolution of gypsum and erodent character to the concrete in the hydro engineering.

据此针对水利工程中石膏溶蚀以及对砼的腐蚀性提出了相应的防治措施。

Time-dependent deformation prediction based on hydro-mechanical coupling theory is important to slope evolution research. However, because preparation processes of most of landslides take place in erodent geochemical environment near the earth surface, slope rock mass deformation differs from the time-dependent response of the underground openings wall rock to excavation.

以流-固耦合等理论为基础对岩体进行时效变形预测,对于斜坡演化研究是重要的,但是,由于大多数滑坡的孕育都是在近地表的侵蚀性地球化学环境中进行的,与深埋地下空间的开挖问题存在明显区别。

The main content of course includes: the water cycle in the earth; the deposited of underground water; the physical characteristics and chemical components of underground water; the underground water of different imbed conditions; the supply, drainage and flowoff of underground water; the dynamic and balance of underground water; underground water in different mediums; the calculation of underground water movement; the basic knowledge of Water Statics; underground water resource; The environment problems of underground water in hydro-engineering.

主要内容有:地球上的水循环,地下水的赋存,地下水的物理性质及化学成分,不同埋藏条件的地下水,地下水的补给、排泄和径流,地下水的动态和均衡,不同介质中的地下水,地下水运动计算,水静力学基础,地下水资源,水利工程中地下水的环境问题。

Hydro Green Energy's dual duct, axial flow, interchangeable hydrokinetic power turbine is covered by US and International patents.

水电绿色能源的双重管道,轴流式,可互换hydrokinetic动力涡轮是所涵盖的美国和国际专利。

Early rendering of Hydro Green Energy's dual ducted hydrokinetic turbine array as viewed from below the surface of the water.

早期绘制水电绿色能源的双涡轮冲压hydrokinetic阵列从下面的水面。

In an attempt to summarizing the previous work, and analyze the hydrometeorological, geological and hydrogeological condition of Beitang reservoir, in Tianjing city, the hydraulic conductivity of the reservoir bottom stratum and its spatial random distribution were determined by using field hydro-geological investigation and grain size analysis in the laboratory.

本文以天津市北塘水库为研究对象,在总结前人研究成果、分析北塘水库地区的水文气象、地质、水文地质条件的基础上,通过野外水文地质勘探、取样与室内颗粒分析实验相结合的手段,获取了库底地层的渗透系数,探讨了库底地层渗透系数的空间随机分布。

第23/38页 首页 < ... 19 20 21 22 23 24 25 26 27 ... > 尾页
相关中文对照歌词
Hennessey & Hydro
Hydro
Hydro
推荐网络例句

And discuss some key point of integrated management system design, include hazard identification and risk assessment and risk control in the occupational health and safety management, the measure of satisfaction target of customer, the flawlessness of law system, the integration of the integrated management system and enterprise standardization system, unify lead institution and work orgnization, integreted internal audit and integrated management review.

同时,论述了一体化管理体系构建中的几个主要问题,包括职业健康安全管理中的危险源辨识、风险评价和风险控制、顾客满意度的科学监测、法律、法规体系的完善、一体化管理体系与企业标准化体系的有机结合、统一的领导机构和工作机构、一体化的内部审核和管理评审。

Deepwater Taranaki is investigated for its petroleum potential, using all available seismic data tied to shallow-water wells.

运用与浅水井相关的现有全部震波探测数据考察了深海区塔拉纳基盆地的油藏前景。

If you're huffing and puffing at any point during the run, slow down and make sure you can take deep breathes.

如果你任何时候在跑步过程中气喘如牛,降低速度并且确保你能够深呼吸。