英语人>网络例句>housing project 相关的网络例句
housing project相关的网络例句

查询词典 housing project

与 housing project 相关的网络例句 [注:此内容来源于网络,仅供参考]

Project construction units for the inspection of buildings, including the availability of content not permit unauthorized access to the buildings housing residents; Housing demolition permits to determine whether failure to implement the scope of demolition and removal of unauthorized extension of the deadline for removal; availability of a unit does not have minimum qualifications of demolition, the commission does not have to dismantle intelligence unit of the dismantling works; whether the project should be required to take the tender bidding method to determine minimum, assessment, demolition unit; without due process by arbitrarily removed or relocated houses barbaric acts and cut off water pollution, power, forcing the relocation of residents who conduct; whether strict compliance with the minimum compensation settlement agreement, or delay in payment of compensation or removal Late placement; is also closed for demolition procedures.

针对拆迁项目建设单位的检查内容包括有无未取得房屋拆迁许可证擅自实施拆迁情况;有无未按房屋拆迁许可证确定的拆迁范围实施拆迁和擅自延长拆迁期限的情况;有无委托不具有拆迁资格的单位实施拆迁,委托不具有拆除资质的单位实施拆除工程的情况;应招标的工程是否按规定采取招投标方式确定拆迁、评估、拆除单位;有无未经法定程序擅自拆除被拆迁人房屋的野蛮拆迁行为及断水、断电。。。。。。

Moreover, the choice of such housing, it should also consider the legality of the project, including the legality of land for construction and project planning is legitimate, the housing where the land would be expropriated and so on.

此外,在选择这种住房,也应考虑是否合法的项目,包括合法的建设用地和项目规划是合法的,住房的土地将被没收,等等。

Works are expected to become a generation of software products, the volume of steel two-in-one software project to create a building of reinforced concrete hybrid computing model, BOQ software standards the first to adapt to national unity has become a model for the industry. In 2004, the industry can make the concept of data centers, engineering data to build professional web sites to provide data services. In 2005, the company launched Project Cost Management System, in the tools software, data services, cost management began three areas to provide customers with a comprehensive project cost computing services. In 2006, the company will focus on project management, systems management for industry to shape the revolutionary professional computing platforms for clients to build project management system.

工程预算软件成为一代精品,钢筋工程量二合一软件开创建筑钢筋、混凝土混合计算模式,工程量清单软件率先适应全国统一标准,成为行业典范。2004年,公司为行业提出数据中心概念,建立专业工程数据网站,提供数据服务。2005年,公司推出工程造价管理系统,在工具软件、数据服务、造价管理三个方面开始为客户提供全面的工程造价计算服务。2006年,公司将致力于工程管理领域,为行业走向系统管理塑造革命性的专业计算平台,为客户打造工程管理体系。

The subject introduces the development history and main function of project management software. Then it presents all kinds of management technology concerning to project management software. It discusses emphatically the Microsoft Project, Guanglianda construction budget computer system, construction project bid and tender book making and management computer system, construction project network play making software, constructing ichnography making software and so on

本课程从工程管理软件系统的发展,工程管理软件系统的主要功能以及工程管理软件系统中涉及到的各类管理技术开始,重点讲授Microsoft Project,广联达工程概预算软件系统,工程项目投标标书制作与管理软件系统,工程项目网络计划编制软件,施工平面图制作软件等。

Blocked by the scheduled project, the tidal current near the coast will move around the project. 4. Changes of SSC before and after the project The general characteristics of the SSC both before and after the scheduled project are as the following: the SSC is lower in the waters of the project ranging from 11 mg/L to 19 mg/L; the SSC isolines are generally parallel to the isobaths, decreasing towards the coast; the SSC in flood tide is higher than that in ebb tide, so are high tide and spring tide than low tide and neap tide, respectively.

4工程前后悬沙量变化工程前后悬沙分布的基本规律:在工程海域,悬沙量均保持为较低值,大致为11~19mg/L;悬沙等值线基本平行于等深线,随深度的减小浓度减小,一般到近岸区达到最低;悬沙量的日周期性变化规律明显,悬沙量涨潮时大于落潮时,高潮时大于低潮时,大潮时大于小潮时。

Runs through the whole process of project construction guidance, after full supervision of the project when completed by the health experts on the Committee of Experts on the residential pilot project owners survey experience, the process of testing reports, research reports, reform implementation and continuous improvement system acceptance documents, they shall be reported to the State after passing recommend approval of residential Engineering Center, the project finally be called a "health residential demonstration project."

贯穿全过程的工程建设的指导下,经过充分监督该项目完成后的健康专家对专家委员会的住宅试点项目业主调查的经验,这一过程的测试报告,研究报告,实施和持续改革改善系统验收文件,并报国务院批准后,通过建议的住宅工程中心,该项目最后被称为"健康住宅示范项目。"

The Skelton New Sugar Mill Project of Guyana is so far the biggest investment project of Guyana and an important project of the government for modernizing the sugar industry. It is an important national project concerned by the president and also a project undertaken by 17MCC in its first march towardsthe South America and will play a decisive role in the economy of Guyana. 17MCC mustered picked personnel to form a powerful management team and operation team and carried out carefully organized construction strictly according to international conventions.

圭亚那糖厂工程是圭亚那斯凯尔顿新糖厂项目[l3] 是圭目前最大的投资项目和政府实施糖业现代化改造的重大项目,是总统关注的国家重点工程,也是17MCC首次进军南美承建的工程,对圭亚那经济具有举足轻重的作用。17MCC调集了精兵强将,组成强有力的管理层和作业层,严格按照国际惯例精心组织精心施工。

On the traditional construction project management mode, the relations of the employers、reconnoitrers、designers、executants、providers and so on usually are as the injunction relation of portrait, the designers and executants are isolated each other、not come-and-go each other; the aim、plan、control of the project take the project management of every actor for major object, make the management non-continuous on different age、the mutual autocephaly and the project immanent contact of every project management actor chop up.

在传统建设工程项目管理模式下,发包方与勘察方、设计方、施工方、供应方等各参与方的关系通常为纵向的指令关系,设计方与施工方等彼此孤立、互不往来;项目的目标、计划、控制都以各参与方项目管理为主要对象,造成管理活动在不同阶段上的非连续性、各参与方项目管理的相互独立性和项目的内在联系被割裂。

This thesis dedicated to research the investment control of BT project, researched the risk in the program construction, the compose portion and the factors effecting the investment. The research includes the conception and the character of the BT project; the actualize process and the questions should be pay attention to; the conditions of BT contract and the sector of the compose poison of the contract price. In this part researched the conception of the BT purchase price and concluded that the relation between the purchase price and the investment. Then studied the risk factors that effect the investment according to the character of the project and then brought forward several advices of the contract item about how to share the risk. Studied compose sector and it's calculatingly methods of the construction cost which is the main part of the investment, then studied how to control the cost during the construct process and analyzed project variations as well as how control that. In the end, researched the capital cost of BT program, the main content include the concept of the capital cost, the calculatingly methods using the engineering economic method, the method writer suggest in the thesis according to the project practice, how to control the capital cost, mainly through setting up an account and inspecting it, and regulating the program financing rate in reason.

本论文的研究重点即BT项目的投资控制,围绕该问题,本论文的主要研究内容有,从BT模式和BT项目的基本分析开始,研究了BT模式的基本概念、BT项目的运作过程、基本特征;研究了BT项目的合同条件和合同价款,该部分分析了BT项目的合同结构、BT项目的承发包工作范围、BT项目的回购价款组成和确定;根据项目建设特征分析了影响BT项目投资的风险因素,并且提出了在对风险进行分配和分担类合同条款制定时建议;建设工程费用是构成BT投资的主体费用,本文对其各组成部分的基本构成、计算方式进行了分析,研究了实施过程中管理控制和工程变更及变更控制的问题;文章的最后对构成BT项目投资的资金成本进行了探讨,分析了资金成本的概念和形成,运用工程经济学的基本理论分析了资金成本各部分的基本计算方式,依据现有的工程实践情况提出了本文建议的计算方式,最后分析了如何对资金成本进行控制――主要通过设立资金账户对其进行监管以及对项目融资的利率进行合理规定。

This paper discusses some problems that have more differences in the standard execution and presents the point that we should properly adjust the project scale and structure grade of the project under construction according to the new standard in order to upgrade the design; analyzes the project classification of the project extension and project to be constructed in phases, and classific...

为此,对该标准执行中存在较多分歧的一些问题进行了探讨,提出根据新标准适时调整在建工程的工程等别和建筑物级别以利于优化设计,对扩机工程和分期建设工程的工程等级划分、大型水电站的挡水和泄水建筑物级别的确定、抽水蓄能电站大坝的洪水设计标准等进行了分析。

第8/500页 首页 < ... 4 5 6 7 8 9 10 11 12 ... > 尾页
相关中文对照歌词
Project Hallways
Project Window
Project Niggas
Project
Tell The World My Name
Public Housing
Project Window
Represent It
Don't Call Me No Mo
My Projects
推荐网络例句

Finally, the Knight strung a line between two of the monoliths and tied the horses up there.

最后,骑士们在两颗巨石之间拉了一条绳子,将他们的座骑绑在上面。

T7zN/hyS0 The island lies south by east from here.

那个岛位于此地的正南偏东方向。

However, the design and research of 3D coaxial feeding head dont appear.

聚焦方式:透镜/反射聚焦;送粉方式:载气式/非载气式。