英语人>网络例句>hot-water bag 相关的网络例句
hot-water bag相关的网络例句

查询词典 hot-water bag

与 hot-water bag 相关的网络例句 [注:此内容来源于网络,仅供参考]

Based on the management principle and objective of Jiangsu SNWDP, the thesis establishes its management framework and designs three management patterns and four modes. Through analyzing the anticipative management effect, scopes in point, advantages and disadvantages of each modes seriatim, the thesis confirms the recommended pattern. It makes framework refinement design, defines rights and duties of control level, execution level and participation level for the recommended pattern. According to the principles of planned water use, metered water use, contract water use, toll water use, it studies project operation for recommended pattern from four aspects, namely water supply plan, measure intensified, water supply contract, and water rate enacted. The thesis analyses and studies how to ensure water supply quality of Jiangsu SNWDP from three levels, including doing watershed protection, intensifying intermediate process, and establishing a long-term mechanism. It makes brief design for dispatching management applied system, studies emphases parts which may affect operation of the pattern in practice, also analyses dispatching optimization of Provincial boundary project management, pumping station management, and different water resources. Finally, the thesis studies relevant basal supports and development stratagems for the management of Jiangsu SNWDP.

本文从分析南水北调江苏境内工程的管理原则、管理目标入手,构建南水北调东线江苏境内工程管理组织框架,设计了管理的三种模式,四个方案,对各种方案的预期管理效果、方案的适用范围、方案的利弊逐一分析,经比选后确定推荐模式;并对推荐模式进行结构细化设计,界定调控层次、执行层次、参与层次的权责;从供水计划、加强计量、供水合同、水价制定方面对推荐模式进行了工程运营的具体研究;从做好源头保护、强化中间过程、建立长效机制三个层次,分析研究如何确保南水北调江苏境内供水水质;对调度管理应用系统作了简要设计;针对实际管理中可能影响整个模式运行的重点细部:省界工程管理、泵站工程管理、不同水资源的优化调度等进行了研究;本论文还分析研究了南水北调江苏境内工程管理的相关基础支撑和发展战略。

Iii. Process Water cont'd Type 3 Water - Purified Water (e.g., USP Purified Water), in Europe the EMEA refers to this a Highly Purified Water - Most difficult to control microbial levels, because no preservative chlorine is present in the water -Less expensive to produce than Water for Injection Type 4 Water - The most critical quality level -Commonly used in final formulation for parenteral applications -Must satisfy the Water for Injection specification as laid out in compendia such as the USP iii.

工艺水 第3类型水-纯化水,在欧洲,EMEA称为高纯水。-控制微生物水平最困难,因为水中没有防腐的氯。-与注射用水比较,生产成本较低第4类型水-最高质量要求-通常用于非肠道用药的最后制剂中-必须符合诸如美国药典这类法定文本中描述的注射用水的规格

Through the tests on gas driving water and water driving gas, the flow law of gas and water was real-time observed. Mainly based on the test of water driving gas as an example, the development of molding coal sample and NMR triaxial osmoscope was demonstrated. The experiment process of water driving gas and parameters were demonstrated. NMRI images of molding sample in horizontal cross-section along the driving direction were obtained by NMRI instrument. The results from images were analyzed and compared. Some novel laws were obtained as the following:(1) the leading edge of water driving has inconsistency. This certified the important previous conclusion that the storage of methane mainly was absorbed in inner surface of pore from NMRI technique;(2) the existence of dominant driving pathway was tested and the way kept almost fixed. The pathway is apt to exist in the edge of coal samples where pore and fracture fully develop;(3) the variation of water flow determines the transport velocity of leading edge of water driving and it has lag effect;(4) the effectiveness of the first driving is better than the second driving;and (5) the subsequence of water driving gas are from trunk fractures to branch fractures, then to branch pores.

主要以水驱气NMRI试验为例,详细介绍了核磁共振三轴渗透仪和型煤试件的研制,并重点阐述了水驱气试验过程和相关参数,利用NMRI技术实时观测得到了不同时间沿驱替方向型煤试件水平剖面的NMRI成像图,最后对试验结果进行了比较分析,揭示了一些新的规律认识:(1)水驱替前缘具有不一致性,从NMRI试验角度验证了前人甲烷类气体赋存形式主要以吸附在孔隙内表面为主的重要结论;(2)煤试件存在优势驱替路径,且这种优势路径在驱替过程中基本保持不变,水驱气的优势驱替路径易产生在煤试件边缘,即煤孔隙裂隙发育区;(3)水驱流量变化决定了水驱前缘的运移速度,且对水驱气效果具有滞后效应;(4)水驱气初次驱替效果好于二次驱替效果;(5)水驱替气的顺序为:主要大裂隙—周边裂隙—周边孔隙。

When a sudden power failure or accident or normal pump stops when the pump stops, the valve inlet water velocity to reduce stress Agency, the valve plate also fall, when its velocity is zero (that is, inlet flow rate is zero Department), large valve plate because of its own gravity and rapidly turn off (time 3s ~ 5s), the majority of water to prevent backflow, when the valve before and after the formation of a water pressure, water stress, on the one hand through the small valve at the bottom of the three slot for pressure relief vent pressure. 4 water stress from the bypass tube into the cavity patch up the control room (this process for the suction pressure chamber that can effectively absorb the energy of water), when water stress on cavity than inferior vena cava, the pressure of water promote the diaphragm down mobile , the current cavity pressure of water being squeezed out all the small valve plate slowly drop back to standby status, the process time to ease closure adjustable (3s ~ 150s), then the valve has been fully closed, watertight.

当突然停电或事故停泵或正常停泵时,阀门进水口处压力水流速降低,大阀板也随之下降,当其流速为零时,大阀板由于自身重力而迅速关闭(时间3s~5s),可防止大部分水倒流,此时阀门前后形成一种水压差,压力水一方面通过小阀板底部的三条泄压槽进行泄压。4)压力水从旁通管进入膜片控制室上腔(此过程为吸压腔,能有效吸收一部分水能量),当上腔压力水大于下腔时,压力水推动膜片往下移动,当下腔压力水全部被挤出来时,小阀板缓缓下降,恢复到待机状态,此过程中缓闭时间可调节(3s~150s),届时阀板已全部关闭,滴水不漏。

The steam acts upon the surface of the water in the receiver, which surface only being heated by the steam, it does not condense, but the steam gravitates or presses with an elastic quality like air, and still increasing its elasticity or spring, until it counterpoises, or rather exceeds, the weight of the column of water in the force pipe, which then it will necessarily drive up that pipe; the steam then takes some time to recover its power, but it will at last discharge the water out at the top of the pipe You may see on the outside of the receiver how the water goes out, as well as if it were transparent; for, so far as the steam is contained within the vessel, it is dry without, and so hot as scarcely to endure the least touch of the hand; but so far as the water is inside the vessel, it will be cold and wet on the outside, where any water has fallen on it; which cold and moisture vanish as fast as the steam takes the place of the water in its descent.

&&蒸汽行为后,水面在接收端,而只是表面被加热水蒸汽,它不浓密,但相互依赖蒸汽或印刷机具有弹性质量一样的空气,并仍在增加其弹性,或春天,直到它网,而超过重量栏水警队管道,然后它一定会推到管;蒸汽则需要一段时间来恢复其权力,但它会在最后排放水出顶管,你可以看到外面的接收机如何当然水,以及如果它的透明度;,目前为止由于蒸汽载船,它是未经干燥,所以作为热几乎要忍受至少触摸的手;但到目前为止,由于水内的船只,将寒冷和潮湿对外面,那里没有水落下;其中寒冷和水分消失快蒸汽需地方水在其后裔。

Heat pump water heater series are: commercial heat pump water heater, home heat pump water heater, heat pump swimming pool machine; air-conditioning series has: window air conditioners, Split wall-mounted air conditioner, cabinet type air-conditioning, commercial air conditioners and so on, at the same time the introduction of The United States technology, specializing in central air-conditioning energy saving technology development, licensing changlingRB developed its heat recovery unit, with the exception of a common central air-conditioning refrigeration, heating capacity, it can also provide 24-hour hot water, truly (refrigeration, heating, hot water) three with one machine.

热泵热水器系列有:商用热泵热水器、家用热泵热水器、热泵泳池机;空调系列有:窗式空调器、分体壁挂式空调器、柜式空调式、商用空调器等,同时引进美国技术,专门从事中央空调节能技术开发,其研制的changlingRB牌热回收机组,除具备普通中央空调制冷、采暖的功能外,它还可以提供24小时生活热水,真正做到一机三用。

The disappear that occupy town assist a staff member introduction, every year a lot of consumer come round to complain this kind of problem, but disappear assist be at a loss what to do however, because water of leather shoes ooze does not belong to shoe of the Anhui province kind " 3 packets "(the bag is repaired, the bag is retreated, the bag is changed) of the regulation " 3 packets " limits.

据市消协一位工作人员介绍,每年都有许多消费者前来投诉此类问题,但消协却束手无策,因为皮鞋渗水不属安徽省鞋类"三包"规定的"三包"范围。

Qingdao pipeline expert specialized hot line; 13012952726 provide the pipelining service; After installment service replacement hot and cold pipeline, place bedpan, the water tank, the hand wash basin, the water heater, the galvanized pipe, the aluminum model the tube, the pvc tube, the pp-R multiple-unit tube, the hot air pipe, the valve, the water cock, the inside and outside wall leakage, the machinery opening sewer, to replace the floor drain

青岛管道专家专业热线电话;13012952726提供管道安装维修;安装维修更换冷热水管道、座便器、后水箱、洗手盆、热水器、镀锌管、铝塑管、pvc管、pp-R复合管、暖气管、阀门、水龙头、内外墙渗漏、机械疏通下水、更换地漏、另外我们有节水型、直排式、虹吸式座便器全部按出厂价自销、五金配件保修五年。

Heating boiler, burning device, complementing machine and control system for boiler; Heating radiator, temperature-controlling valve, hot measuring instrument and meter , electric heater , heat exchanger; Central hot water system , hanged heating stove , solar water heater , pot-type boiler , hygiene hot water equipment for bathroom and kitchen , heating equipment of sauna and swimming pool, etc.; Central heating technology and equipment, heat transmission equipment , geo-thermal energy heating equipment , floor radiation heating equipment , exothermic cable heat equipment , electro thermal membrane heating equipment , radiation heating equipment ,etc.

采暖供热锅炉、燃烧器、锅炉辅机及控制系统;采暖散热器、温控阀、热计量仪器仪表、电热器、换热器;中央热水系统、采暖壁挂炉、太阳能热水器、家用热水器、浴室厨房卫生热水设备、桑拿游泳池供热设备等;集中供热技术及设备、换热设备、地热供热采暖设备、地板辐射供暖设备、发热电缆供暖设备、电热膜供暖设备、辐射采暖设备等。

Multi-function string which combines hollow rod electric heating, adding hot waste water above pump, adding hot waste water below pump, hot water circulation below pump, using sinker bar below pump, and borehole chemical viscosity reduction has been used selectively according to different production requirement and reservoir conditions.

采用能实现空心杆电加热、泵上掺热污水、泵下掺热污水、泵下热水循环泵上掺入、泵下配置加重杆、井筒化学降粘等多功能综合管柱,适应各种不同生产要求,根据油层条件,选取一种或多种组合、配套。

第14/500页 首页 < ... 10 11 12 13 14 15 16 17 18 ... > 尾页
相关中文对照歌词
Scum Bag
Hot Water Burn Baby
40 Water
Hot Pants Explosion
Hot Summer
Drop It Like It's Hot
Bags
Hot Long Time
Hot Mess
Hot Damn Woman
推荐网络例句

You can do some assertiveness training.

你可以进行一些自信训练。

We were well on the path to making a rear-wheel-drive global platform," says Mays."

我们正致力于建立一个后轮驱动的平台,"Mays这样说道。"

F: I think the oval shape suits you well.

我觉得这副椭圆形的可能很适合你。