英语人>网络例句>hot metal 相关的网络例句
hot metal相关的网络例句

查询词典 hot metal

与 hot metal 相关的网络例句 [注:此内容来源于网络,仅供参考]

The main functions of the Basic Oxygen Furnace are to decarburize and remove phosphorus from the hot metal, and to optimize the steel temperature so that any further treatments prior to casting can be performed with minimal reheating or cooling of the steel.

转炉的主要功能是脱碳和除磷,并优化钢液温度,使得再浇注之前的任何再处理只要对钢液的加热和冷却做微调节即可。

Base on study for increasing decarburize velocity in the state and word , founding a mathematics model of decarburizing in RH equipment through practice of operation and experimentation. Applying the model calculation, obtain reasonable process parameters of management and status of hot metal before management of decarbonization using RH—MFB equipment.

在借鉴国内外为提高RH脱碳速度的研究成果基础上,结合攀钢RH—MFB的实际及前期IF钢试验情况,建立了RH脱碳数学模型,通过计算提出了攀钢RH-MFB处理超低碳IF钢较合理的来钢条件及处理过程工艺参数。

This process can also use high-phosphorus iron ore as raw materials and reduce the phosphorus out of the hot metal. Dephosphorization is one of the characteristics of this process.

该工艺可以使用传统高炉无法使用的高磷铁矿石作为炼铁原料,且能冶炼出含磷降低的铁水,脱磷也是这种工艺的特点之一。

When men dove to the ground for cover, as they had been trained to do and as instinct dictated, they exposed themselves to a rain of hot metal and wood splinters , they learned that to survive a shelling in the Hurtgen, hug a tree.

当人们按照训练所学和出于本能,扑倒在地寻找隐蔽时,身体却暴露在如雨点般倾泻的滚烫弹片和碎木片之下;于是他们学会了如何在霍根森林炮击中生存——紧紧抱住某棵树。

Based on the research, founded on existing production conditions, production capability and technical natures of KISC, especially its own development requirements, linked with the development trend of the iron and steel industry, fully considering the continuity of equipment upgrade and technical optimization of KISC, guided under principles of validity and benefit, the writer analyses and argues that in current conditions. KISC shall not adopt the hot metal pretreatment of desiliconization, dephosphorization and desulphurization, but the end-point converter process to improve the dephosphorization effect. But according to the development plan of KISC, with its scale development, upgradeof equipment and technical conditions and implementation of a plan to use high-phosphorus ironstone, its more suitable to adopt the converter-shaped pretreatment of desiliconization, dephosphorization and desulphurization.

在此研究基础上,立足昆钢当前生产条件、生产能力和工艺特点,特别是昆钢自身发展需要,结合钢铁工业发展趋势,充分考虑昆钢现行装备改造和工艺优化的延续性,以有效性和经济性原则为指导,分析讨论了在昆钢当前条件下,不适宜采用铁水"三脱"预处理工艺,而宜考虑采用转炉复吹技术以达到改善转炉吹炼过程脱磷效果的目的;而根据昆钢的发展规划,随着昆钢的规模化发展,生产装备及工艺条件的更新改善及利用高磷铁矿计划的实施,则适宜采用转炉型"三脱"预处理技术。

In this paper,solidifinG ladle of hot metal has been studied from the point ofview of heat transfer.

从传热角度研究了铁水在罐内的凝结过程,导出了预测铁水凝固层形状及厚度的数学模型。

An hot simulation experiment has been made to investigate the process of forming mushroom above outlet of bottom bloving nozzel in combined blowing converter , and the relation between the temperatures of bottom bloving nozzel as well its peripheric refractory lining, and the temperature of hot metal as well the flowrate of bottoin blowing gas.

通过热态模拟试验,研究了复吹转炉底吹喷枪出口端生成蘑菇头的过程以及底吹喷枪温度、周围耐火材料内的温度与铁水温度、底吹气体流量之间的关系。

Examples of open-shop problem include health examination and the operation of car maintenance. Scheduling problem with no-wait constraints occur in many industries. For instance, in hot metal rolling industries, where the heated metal has to undergo a series of operations at continuously high temperatures before it is cooled in order to prevent defects.

生产过程中的排序往往受到产品生产的特性或者生产技术的限制,所以会产生不同的约束情况,例如:无等待时间是化学、石油工业和冶金工业的特色;阻塞指的是缓存能力受到限制或者没有缓存的情况,最常见的是利用机器人进行夹取工件的作业。

Melting by 5 T / hot air at the cupola and 750 KG / N IF the electric furnace, the high temperature will be above 1500 ℃ hot metal, machine-wave modeling in addition to modeling, advanced Fumo sand and shell technology, equipped with a polishing equipment and the entire fire, Polished, finishing processes, can provide users with fine casting.

熔炼采用5T/时热风冲天炉和750KG/N的中频电炉,可获得1500℃以上高温铁水,造型除潮模机器造型外有先进的复膜砂和壳型工艺,配备有抛光设备及整火、磨光、精整工艺,可为用户提供精美的铸件。

No doubt you have burned your hand on a hot oven or other hot metal objects.

4你的手一定曾经被烧热的炉子或其它热的金属烫过。

第2/19页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

This one mode pays close attention to network credence foundation of the businessman very much.

这一模式非常关注商人的网络信用基础。

Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.

扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。

There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.

双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。