查询词典 high risk
- 与 high risk 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
CDC NPIN can tell you whether there was no risk, low risk, or high risk of HIV transmission. Based on your situation the chance or probability of transmission is low. You had an open wound in your mouth that was exposed to vaginal fluid this is what makes your situation low risk. Any time a person has a canker sore, cut, or opening to the mouth this is a risk because this is a point of entry for the virus. If you still do not understand this we encourage you to discuss this with your doctor so there is not a language barrier, and you can have a medical professional explain this to you.
cdc npin 能告诉你是否这儿是无风险或是低风险或是高风险对于hiv传播,,基于你的情况这个机会或许可能感染低风险的,你有一个开放性的伤口在你嘴里面被曝露与阴道分泌物这样可以是与处于低风险,任何时候一个人有口腔溃疡疼痛,割伤,或是开放在嘴里面这是一个风险因为这是一个点进入病毒,如果你依然不明白这些我们鼓励你去讨论和你的医生,因为这人没有语言障碍,并且有一个专业的解释给你
-
objective to discuss perioperative complication and management of patient with high risk copd following esophagectomy.methods 45 patients with high risk copd underwent esophagectomy with epidural block combined with general anesthesia.perioperative treatment included smoking cessation,chest physiotherapy,prevention and control of infection of air way and appropriate bronchodilators of air way,breathing exercises,nutrition support and oxygen therapy.painkiller was instilled after surgery,early exercises,ensuring unobstruction of the air way,mechanical ventilation was applied when needed.results 3 had hypoxaemia in operation.after surgery,all patients had spo2 somewhat declined.6 had lung infection.6 were removed of bronchial secretion by bronchoscope.2 were supported by ventilator by using intubation.2 underwent tracheotomy.1 had disturbances of acid base balance and treated by using hydrochloric acid muriatic acid.all patients recovered rather smoothly and discharged from hospital.conclusion high risk copd is not the absolute contraindication of esophagectomy.active management before and after surgery ensures the safety and recovery of patients.
目的 探讨重度慢性阻塞性肺疾病简称慢阻肺病人食管切除术围手术期常见并发症及其处理。方法 45例重度慢阻肺的病人在全麻联合硬膜外阻滞下进行开胸食管切除手术,围手术期处理包括术前戒烟、胸部理疗、预防和控制呼吸道感染、解痉化痰、呼吸功能锻炼、营养支持和氧疗;术后硬膜外镇痛、早期锻炼、保持呼吸道通畅,部分病人予以呼吸支持。结果术中3例出现低氧血症。术后所有病人pao2均有不同程度的下降,6例出现肺部感染,6例行纤维支气管镜吸痰,2例通过气管插管给予呼吸机支持,2例行气管切开术,1例酸碱平衡紊乱使用盐酸精氨酸治疗。所有病人均痊愈出院。结论重度慢阻肺病人并非开胸食管切除手术的绝对禁忌证,积极的术前准备和严格的术后管理可减少和控制术后急性发作,有助于确保此类病人的围手术期安全和康复。
-
The high-risk strains of human papillomavirus are known to cause cervical cancer and releated to oropharynx cancers.
高危型人乳头瘤病毒(high-risk strains of human papillomavirus, HR-HPV)感染人类生殖器官和口腔上皮细胞,引起一系列恶性肿瘤。
-
If the price is far away from the recovery point to the relative safety, there will not be too high risk, market risk is that if the wrong direction, the relevant asset prices to recover the price of touch, CBBC unexpired was recovered from the recovery of selected price too CBBC of high-risk, but greater leverage and fall fast.
如果价格远离恢复点的相对安全的,不会有太高的风险,市场风险是,如果在错误的方向,有关的资产价格,以收回触摸,牛熊证价格未到期收回,从选定的价格回升也高牛熊证风险,但较大的优势和快速下降。
-
If my broker asks me if I want high-risk or low-risk securities, I may say high risk because I don't want to look wimpy.
""如果我的经纪人问我,如果我想高风险或低风险的证券,我可以说,高风险,因为我不想看
-
Conclusion1 Critically ill patients with indwelling catheters were of the high positive rate of microorganisms,and microorganism spectrum was of special properties;BF formed mainly inside the catheter,the occurrence rate of BF inside the catheter was high and the formation time was short;Changes on catheters and the result of microorganisms was positively correlated with the BF formation.2 Indwelling catheter time was the independent risk factors for the BF formatiom, while age、APACHEⅡscore、sex、urine sugar and the types of antibiotic usage were the potential risk factors for the BF formation;Nurses should perfect the catheter measures for critical ill patients,emphasis on the assessment of risk factors of BF formation,and implement special care in high-risk patients.3 In the early stage of BF formation,irrigation could play the role of eradicative BF effectively;While later,it couldn't,but it can delay the speed of BF formation and maturation;In the choice of washing methods,injection type washing method is superior to infusion.
结论1重危患者留置尿管微生物培养阳性率高,且微生物菌谱具有特殊性;重危患者尿管表面BF主要在尿管内壁形成;内壁BF的发生率高,形成时间短;肉眼观察尿管表面改变情况以及微生物鉴定结果与BF形成呈正相关。2尿管留置时间是重危患者留置尿管表面BF形成的独立危险因素;年龄、APAcHEⅡ评分、性别、尿糖定性以及抗生素使用种类是其可能的危险因素;护理过程中应完善重危患者尿管护理措施,注重对BF危险因素的评估,并对高危患者实施重点护理。3 BF形成早期,冲洗能发挥较好的清除作用;BF形成后期,冲洗无法彻底清除尿管表面BF,但冲洗能延缓BF形成与成熟的速度;在冲洗方式的选择上,注洗式冲洗法对尿管BF的清除效果优于输注式冲洗法。
-
Chapter 9 is conclusion and future prospect. There are five innovative findings in the paper. Firstly, the evolvement of extensions and connotations of two reengineering styles is analyzed based on their high risk, and finding their trends of amalgamation. With this, the concept of corporation reengineering is then redefined combining core competence theory and ideas of process change management, and decompounding it into two parts: pre-reengineering and post-reengineering. Its inner relationships are analyzed and explained by economics theory. Secondly, establishing a analysis framework of reengineering risks, risk factors of foreign BPR are analyzed and concluded systematically for the first time. Reengineering risks are divided into three parts: plan, design and executive based on process and project management, then risk factors system is abstracted. Thirdly, 72 reengineering corporations in Jiangsu province are investigated on risk condition. Furthermore, risk factors in every part are analyzed and reduced experimentally by factor analysis method, and a risk factors system to suit Chinese corporation's reengineering is established. Fourthly, setting up a choice model of reengineering projects, the objective optimization model is presented to ascertain the weigh of each factor, a method of sequencing reengineering projects is presented so that risk of each reengineering project can be evaluated and compared effectively. Fifthly, an integration relationship model among IT, BPR and strategy is established aiming at productivity paradox derivative from IT and its dual effects on BPR, IT investment priorities in BPR is narrated deeply.
本论文的创新点体现在五个方面:1)基于上述两种重组方式的高风险性,对它们的外延和内涵演变进行了分析,发现它们日益融合的趋势;然后结合核心能力理论和流程变革管理的思想对企业重组的概念进行了界定,将其分为&前重组&和&后重组&两部分,并对其内部关系进行了详细分析,同时应用经济学理论对其进行了解释。2)建立了重组风险的分析框架,并首次较为全面地分析和归纳了国外企业重组的风险因素,根据重组的过程和步骤以及项目管理的观点,将重组风险划分为计划、设计和执行3个部分,并在此基础上提炼出企业重组的风险指标体系。3)运用现场访谈、问卷调查的方法,调查了江苏省72家企业重组的风险情况,然后利用因子分析法对每一部分的每一风险因素进行实证分析,对风险指标进行了约减,建立了比较完善的适合我国企业的重组风险指标体系。4)建立了重组变革方案的选择模型,然后针对不同的重组方案提出了确定指标权重的目标优化模型,并基于三角模糊数之间两两比较的可能度概念,提出了一种重组方案排序法,从而可以有效地对各种变革方案的风险进行评估和比较。5)针对信息技术所造成的&生产率悖论&现象及其对重组的双重影响,建立了信息技术、企业重组和企业战略之间的整合关系模型,并对重组中信息技术投资的优先权问题进行了深入的阐述。
-
So I think finding the balance is important and stratifying the patients into high risk for bleeding, or high risk for heart attack or high risk for stroke, they are all very important as we go forward.
现在我们意识到此观点不正确。在有心脏疾病的患者当中同时使用两者是安全的。
-
Injection drug use history was the main risk factor among FSWs(adjusted OR=9.8);(2) The self reported illicit drug-using behaviors and high risk sexual behaviors among close-cohort of FSWs who attended all the three cross-sectional surveys decreased accompanied with the survey time.The decrease of STIs prevalence and urine positive rate among them confirmed their decreased high risk behaviors;(3)The incidence of HIV was 1.4(95%CI 0.5~3.3)/100 Person Year in the open-cohort.FSWs who were recently HIV-infected had obvious high risk sexual behaviors with clients and 4/5 of them were not illicit-drug using FSWs;(4) 42.1%(16/38) of BED-CEIA positive specimens were false positives(>155 days),but after eliminating the misclassified long-term HIV infected specimens,the BED-CEIA estimated HIV incidence were similar with that of the cohort survey among the same FSWs2.1/100PY vs.2.0/100PY;0.4/100PY vs.
注射吸毒行为是FSWs人群HIV感染的主要危险因素(aOR=9.8):(2)连续参加过三次横断面调查的封闭式FSWs队列中,自报吸毒行为及高危性行为随调查时间均出现了降低的趋势,另外其性病感染率及尿吗啡阳性率的降低也印证了其自报高危行为特征的下降;(3)开放式FSWs队列中的HIV发病密度为1.4(95%CI0.5~3.3)/100人年,HIV新发感染FSWs与嫖客之间的高危性行为十分突出,以非吸毒FSWs为主(4/5):(4)BED-CEIA阳性标本中的假阳性率为42.1%(16/38),但在排除误检的既往HIV感染标本后,BED-CEIA及开放式队列研究估计的HIV发病密度十分接近2.1/100人年vs.2.0/100人年:0.4/100人年vs.0.6(来源:4eABC论f5f5文网www.abclunwen.com/100人年。
-
Its a kind of long-cycle, large-investment, high-risk project to launch ERP in a firm, based on both internal and external environment of the enterprise, this paper analyses the risk in the enforcement of ERP, establishes a risk assessment system and put forward a synthetical assessment method of ERP; Secondly, it makes a deep analyses on risk identification ,risk analysis ,risk estimation and evaluation ,and risk management.
针对企业信息化工程项目投资大、周期长、风险高、见效慢的特点,本文从企业内外部环境两方面,系统分析了这类项目的实施风险,建立了制造业信息化工程项目实施风险指标体系,并对风险识别、分析评估与风险管理进行深入系统的研究。
- 相关中文对照歌词
- High Risk Insurance
- 推荐网络例句
-
Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).
呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。
-
The cost of moving grain food products was unchanged from May, but year over year are up 8%.
粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。
-
However, to get a true quote, you will need to provide detailed personal and financial information.
然而,要让一个真正的引用,你需要提供详细的个人和财务信息。