查询词典 high power capacity
- 与 high power capacity 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
From the burden increased aspect clarify set up the necessity of station, then pass to drew up to set up generalize of transformer substation and line direction to consider, and pass to analysis of carry the data, safety, economic and dependable consider and made sure the 110 kV, 35 kV, 10 kV and station use electricity of lord connect line, then again through burden calculation and power supply scope made sure main number, capacity and model number of the transformer set, also in the meantime make sure the station uses capacity and model number of transformer, end, according to biggest keep on work electric current and short circuit calculating of calculation result, to the high pressure Rong break a machine, insulate a switch, female line, insulate son and wear a wall set tube, electric voltage with each other feeling machine, electric current with each other the feeling machine carried on choose a type, thus completed a 110 kV electricity a part of design.
本文首先根据任务书上所给系统与线路及所有负荷的参数,分析负荷发展趋势。从负荷增长方面阐明了建站的必要性,然后通过对拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了110kV ,35kV ,10kV 以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,对高压熔断器,隔离开关,母线,绝缘子和穿墙套管,电压互感器,电流互感器进行了选型,然后进行配电装置和平面布置的设计以及防雷的设计,从而完成了110kV 电气一次部分的设计。
-
A novel hybrid active power filterwith series resonance circuit turned at fundamental frequency is proposed,which is composed of high-capacity passive power filtersfor harmonic currents suppression as well as reactive power compensation and an active power filterfor improving filtering performance as well as overcoming resonance problem due to PPFs.
提出一种基波串联谐振式混合型有源滤波器,利用大容量无源滤波器实现谐波抑制和无功补偿;采用有源滤波器改善系统滤波效果并阻尼无源滤波器与系统阻抗之间的串、并联谐振。
-
When the power system load in a small disturbance, the system itself to maintain the stability of the power transmission capacity, the use of automatic excitation regulator device may reduce the reactance of the generator, and then further to maintain the transformer high-voltage bus voltage constant, so compensation not only its own reactor, but also compensation for the step-up transformer reactance, thus greatly improving the power limits of generators, which greatly increased the static stability of power system.
当电力系统的负载发生微小的扰动时,系统本身保持稳定送电的能力,使用自动励磁调节装置,则可减小发电机的电抗,再进一步维持变压器高压母线的电压恒定,这样不仅完全补偿了自身的电抗,而且还补偿了升压变压器的电抗,这样就大大提高了发电机的极限功率,即大大地提高了电力系统的静态稳定。
-
The Company is launching the mobile emergency charger is a new era of technology products, it has high-capacity lithium electricity to overcome the past, the capacity of rechargeable emergency small, the use of short time, such as rechargeable disadvantage cumbersome, timely solution for your mobile phone, MP3, CD , digital cameras, digital video camera applications such as all electric lithium digital, mobile equipment outdoors no electricity troubles. Suitable for your travel, go out to business use, you can rest discarded miscellaneous plug wall charger, or AC power in the absence of circumstances at any time you can add energy.
本公司现推出的手机应急充电器,是一个新时代的科技产品,它以高容量锂电克服以往的应急充的容量小,使用时间短、充电繁琐等缺点,为您及时解决手机、MP3、CD、数码相机、数码摄像机等所有应用锂电的数码、移动设备在户外没电的烦恼。,适宜您旅游,外出商务时使用,你尽可丢弃冗杂的插墙式充电器,或在无交流电源的环境下你也可以随时补充能量。
-
With the rapid development of boiler unit and the scale and capacity to high-parameter and large capacity in fossil fuel power plant,in order to protect the unit running safety,requirements for certificates of coal is also growing.How to improve the utilization of space,reduce area and the amount of soil,saving the investment of equipment,reasonable and necessary optimization for coal storage system in engineering design,without reducing the reliability of coal handling system and the security of coal suppl...
随着火力发电厂锅炉机组和规模容量向高参数、大容量的快速发展,为确保电厂运行安全,要求电厂的储煤量也越来越大,如何提高场地的利用率,缩小占地面积,降低土石方量,节约设备投资,在工程设计中对贮煤系统进行合理和必要的优化,同时又不降低输煤系统的可靠性和机组供煤安全,是国内现代化火力发电厂储煤场设计中所面临的现实问题。
-
This paper endogens carbon tax and subsidy two variables, discussing how to decide the optimal level of carbon tax and subsidy. The results of the research are obtained as the following:(1) price and capital subsidy which one is priority depend on the productivity of renewable energy capital, if productivity is high enough, then should adopt capital subsidy policy;(2) price and capital subsidy indeed exist trade-off and non-independent relationship;(3) renewable energy regulation ratio has negative effect on carbon tax, however has positive effect on price subsidy;(4) green certificate price increase will result in decrease carbon tax and price subsidy, but increase capital subsidy;(5) if the authority loose the environmental target, then should impose high carbon tax which maintains the environmental quality, but have ambiguous effect on subsidy policy;(6) increasing stability of renewable energy, then increase price subsidy, however, under budget constraint should decrease capital subsidy;(7) analyzing Taiwan's three wind power energy with different price subsidy, which can improve the technology of wind power energy. In another word, it can raise the capacity of wind power energy and reach the goal of renewable energy.
本文考量政府预算限制下,探讨最适碳税税率与补贴率订定之问题,获得如下发现:(1)发电量补贴与资本补贴对促进再生能源发展效果不一样,决定於再生能源资本的生产力,如果资本生产力足够高,则发电量补贴效果较佳;反之,则应优先采行资本补贴措施;(2)发电量补贴与资本补贴的确存在抵换而非独立关系,亦即在政府预算限制下,为促进再生能源发展,应将种种补贴措施整合考量,以最低行政成本达到再生能源发展目标;(3)再生能源管制配比与碳税税率及资本补贴率呈反向变化关系;而与发电量补贴呈正向关系;(4)绿色权证交易制度具促进再生能源管制目标达到之奖励效果,因此,绿色权证价格提高可降低发电量补贴及碳税税率,降低碳税对经济不利冲击效果;(5)政府如果采行较宽松环境目标,宜提高碳税税率,避免环境品质进一步恶化,然而,对发电量或资本补贴之影响效果不确定;(6)再生能源发电效率愈高,则应提高再生能源发电补贴,在预算限制下,应降低再生能源资本补贴;(7)透过台湾三座风力机组的实证分析,采取差异性发电量补贴,将可诱导较高效率风力机组的投资行为,提高整体风力发电效率,达到再生能源发展之目标。
-
Due to capacity increase or structure change of the power system, an extra-high current possibly 100 times of the rated current may appear in some circuits of the power system when a short-circuit fault happens nearby. This current is extra high and exceeds the permitted value of 10% error curve of protection current transformer.
在电力系统中,各回路的最大故障短路电流和额定工作电流的比值应在合理的范围内,以保证保护用电流互感器的工作精度,但由于系统容量增大或因系统结构等原因,某些回路在某些情况下的最大故障短路电流远远超过了正常范围。
-
Garbage power generation is one of the scientists just think of ways to solve the energy shortage in Sichuan, garbage substation has been trying to build just the beginning of garbage power plant efficiency is very high, a day can consume a large amount of municipal waste, it is per hour electricity than a medium-sized thermal power plant's generating capacity even more, its workload is particularly high.
垃圾发电是科学家们刚想到的一个解决能源短缺的方法,在四川,垃圾变电站已经开始尝试建设,刚开始时垃圾发电厂的效率就非常高,每天都可消耗大量的城市垃圾,它每小时的发电量比一个中型火电厂的发电量还要多,它的工作量特别高。
-
With the rapid development of the electric power industry, the utilization of the continuously increased capacity of the generator units, the extraordinary large power grid, and the extra-high voltage transmission network etc., the operation and the management of power system is becoming more and more complex.
电力工业的飞速发展,单机容量的不断增加,电网规模的日益扩大,使得电力系统的运行和管理越来越复杂。
-
The main products TQSW no local place-frequency electrical impulse voltage testing transformer test sets of series resonant frequency generator unit test transformer dry-type high-voltage testing transformer the ball-gap discharge frequency divider DC High-frequency DC generator, generator, inverter-current multi-function grounding impedance test system-current generator (up-flow device) performance of an integrated test bed Transformer Partial Discharge Detector mechanical properties of high-voltage switches Vacuum Tester Tester Tester Loop Resistance transformer capacity Tester-Load Switching Test Transformer tumor resistance measurement Transformer turns ratio tester tester MOA group tester insulating oil dielectric strength tester transformer loss parameter Intelligent Tester transformer loss-line parameter tester frequency interference dielectric loss dielectric loss tester anti-interference relay tester Ground Yin Xiaxian conduction tester cable fault tester tester tester generator rotor impedance large Grounding Resistance Tester Tester transformer features an integrated micro-moisture meter aperture automatic flash point tester Automatic Closed flash point detector vacuum oil filter boots pressure test device (automatic, semi-automatic) nuclear phase Instrument Series wireless digital core Instrument security tools relative to the mechanical properties testing machine clamp grounding resistance of grounding resistance measuring instrument digital megger digital high-voltage insulation resistance tester and a scalable high-altitude test tools, digital dual-phase volt-ampere facade sequence table clamp Three-phase Power Parameters Tester Calibrator lightning strike counter dedicated test wire, clamping insulation boards, pipe, cable tray mats polyimide film conductor line busbar electric appliances
扬州市苏博电气有限公司扬州市苏博电气有限公司主要产品有TQSW无局部放电工频试验变压器冲击电压发生器变频串联谐振试验成套装置试验变压器干式试验变压器高压分压器放电球隙中频直流发生器高频直流发生器变频大电流多功能接地阻抗测试系统大电流发生器变压器性能综合测试台局部放电检测仪高压开关机械特性测试仪真空度测试仪回路电阻测试仪变压器容量测试仪变压器有载开关测试仪变压器肿瘤电阻测试仪变压器变比组别测试仪氧化锌避雷器测试仪绝缘油介电强度测试仪变压器损耗参数智能测试仪变压器损耗线路参数综合测试仪变频抗干扰介质损耗测试仪抗干扰介质损耗测试仪继电保护测试仪接地引下线导通测试仪电缆故障测试仪发电机转子交流阻抗测试仪大型地网接地电阻测试仪互感器特性综合测试仪微量水分测定仪开口闪点全自动测定仪闭口闪点全自动测定仪真空滤油机绝缘靴耐压试验装置核相仪系列无线数字核相仪安全工具力学性能试验机钳形接地电阻仪接地电阻测量仪数字兆欧表数字高压绝缘电阻测试仪可伸缩高空测试工具数字双钳相位伏安表相序表三相电力参数测试仪雷击计数器校验仪专用测试导线,钳绝缘板,管,垫聚酰亚胺薄膜电缆桥架滑触线母线槽电热电器
- 推荐网络例句
-
According to the clear water experiment, aeration performance of the new equipment is good with high total oxygen transfer coefficient and oxygen utilization ratio.
曝气设备的动力效率在叶轮转速为120rpm~150rpm时取得最大值,此时氧利用率和充氧能力也具有较高值。
-
The environmental stability of that world - including its crushing pressures and icy darkness - means that some of its most famous inhabitants have survived for eons as evolutionary throwbacks, their bodies undergoing little change.
稳定的海底环境─包括能把人压扁的压力和冰冷的黑暗─意谓海底某些最知名的栖居生物已以演化返祖的样态活了万世,形体几无变化。
-
When I was in school, the rabbi explained everythingin the Bible two different ways.
当我上学的时候,老师解释《圣经》用两种不同的方法。