查询词典 heating plant
- 与 heating plant 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This paper gives an example that is a project about repowering 2×50MW coal-fired plant as combined cycle. It is found out that after full firing repowering, the absolute efficiency gain is 4.62% and after feed water heating repowering, the absolute efficiency gain is 2.78%.
本文结合2×50MW燃煤机组改造为联合循环的方案实例,计算出排气助燃型联合循环系统更新改造使原燃煤机组绝对效率提高了4.62%,给水加热型联合循环系统更新改造使原燃煤机组绝对效率提高了2.78%。
-
The design process is: to select the best process, drawing process maps, after the material of the process, heat is calculated to select the required specifications for production equipment models, a comprehensive natural conditions, transport, economic and other factors in selecting suitable areas The building addresses, format of the workshop construction, equipment to deal with layout, rendering plant layout, equipment flow chart, response equipment, such as design and graphics, the last of the water, electricity, gas and other public works to estimate the amount of ventilation, heating , environmental protection, fire prevention, safety and health content on to complete the preliminary design of the workshop.
本次设计的过程是:选择最佳工艺流程,绘制工艺流程图,之后对各工序物料、热量进行计算,选定所需生产设备规格型号,综合自然条件,交通,经济等个方面因素选择合适的建厂地址,对车间建筑形式,设备布置进行处理,绘制车间布置图、设备流程图,反应设备的设计与绘图等,最后对水、电、汽等公用工程用量进行估算,对通风、采暖、环保、防火、安全卫生等内容进行阐述,从而完成了车间的初步设计。
-
The design process is: to select the best process, drawing process maps, after the material of the process, heat is calculated to select the required specifications for production equipment models, a comprehensive natural conditions, transport, economic and other factors in selecting suitable areas The building addresses, format of the workshop construction, equipment to deal with layout, rendering plant layout, equipment flow chart, response equipment, such as design and graphics, the last of the water, electricity, gas and other public works to estimate the amount of ventilation, heating , environmental protection, fire prevention, safety and health content on to complete the preliminary design of the workshop.
本次设计の过程是:选择最佳工艺流程,绘制工艺流程图,之后对各工序物料、热量进行计算,选定所需生产设备规格型号,综合自然条件,交通,经济等个方面因素选择合适の建厂地址,对车间建筑形式,设备布置进行处理,绘制车间布置图、设备流程图,反应设备の设计与绘图等,最后对水、电、汽等公用工程用量进行估算,对通风、采暖、环保、防火、安全卫生等内容进行阐述,从而完成了车间の初步设计。
-
It includes the main propulsion plant, management of power station , ship control system,remote control of valves and measurement of tank level,cargo oil pump controlled by converter,heating monitoring of cargo oil tanks and reclaim monitoring of poisonous vapour.
结合19 000 dwt化学品/成品油船的设计,从系统基本原理及构成上,简要介绍了主推进装置、电站管理、船舶控制系统、阀门遥控与液位测量、变频货油泵、液货舱加热和有毒液货蒸汽回收等方面的自动化设计,探讨了此类船型的自动化系统特点及发展方向。
-
The 2×390MW HRSG in Xiamen Eastern Power Plant for combustion engine works adopts the HRSG manufactured by Hangzhou Boiler Group Co., Ltd., which is characterized by three-pressure, reheats, without after-combustion, horizontal type and natural circulation. Since the full set of HRSG designing technology from the US NOOTER/ERIKSEN has been introduced, it matches with PG9341FA type gas turbine, adopting single-row frame construction, full suspension type, and in-line arrangement in the heating surface. The heat conduction components use gear screw finned tube, module type supply and positive pressure operation.
厦门东部燃气电厂2×390MW燃机工程的余热锅炉采用由杭州锅炉厂生产的三压、再热、无补燃、卧式、自然循环燃机余热锅炉,引进美国NOOTER/ERIKSEN公司全套燃气轮机余热锅炉设计技术,它与PG9341FA型燃气轮机相匹配,采用单排框架结构,全悬吊形式,受热面顺列布置,传热元件采用开齿螺旋鳍片管,模块式供货,锅炉为正压运行。
-
Deodorizer cans, detreated cans, refining cans, off soap mixer machine than the allocation, heating cans, dehydrated machine, stripping 28-36 Shell machine, round screen, vibrating screen, flat screen, crusher, go stone machine, steam offline, reducer, various condensers, legislative twisted cage, flat cutter cage, hoist, etc.,15-150 tons of oil extraction plant , castor oil equipment.
脱臭罐、脱色罐、精炼罐、脱皂机比配混合机、加热罐、脱水机、 28-36剥壳机、圆筛、振动筛、平筛、破碎机、去石机、蒸脱机、减速机、各种冷凝器、立绞笼、平绞笼、提升机等,15-150吨浸出油车间、蓖麻油设备。
-
Economics is studied on steam injector substituting the tube-shell heat exchanger and the circulating pump in the heating system of the thermal power plant.
针对热电厂供热系统采用升压加热装置改造热网加热器和循环水泵的可行性和经济性开展了研究。
-
Main condensate piping system excl. main condensate pump system, LP feedwater heating system, condensate polishing plant
LCA 主凝结水管道系统不包括主凝结水泵系统,低压给水加热系统,凝结水精处理设备
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力