英语人>网络例句>heat-insulating layer 相关的网络例句
heat-insulating layer相关的网络例句

查询词典 heat-insulating layer

与 heat-insulating layer 相关的网络例句 [注:此内容来源于网络,仅供参考]

The form of intumestant char layer could depart polymer base and burning part while prevent heat transfer. Obviously,the fire –retardant effect of IFR is also that it intermits heat transfer.

因此,其阻燃作用主要属于凝聚相机理;APP、MN等分解时产生的NH3、H2O等不燃性气体,这些气体在能被捕集之前逸出到材料表面的气相,稀释了可燃气体的浓度;膨胀碳层的形成,起到阻止热传递的壁障作用,把聚合物基质与燃烧区隔开。

Results showed that it was possible to realize heat natural circulation when temperature difference at inlet and outlet of the system , and that of the gravel layer and cement mortar surface were occurred when delay time of heat transfer in each element was considered .

结果表明,在考虑了每个测试单元热传递时间滞后的条件下,当系统的入口点和出口点的温度存在温差及卵石层和水泥地面存在温差时,该系统能够实现热能自然循环。

The seventh layer to the 15th layer is high area, adoption north bound descend to of water supply method, pump to supply water to a water tank of the roof from the water supply of the underground garage, then be taken care of the net water supply toward high area by a water tank; Drain the system adoption is a dirty water, the waste water confluence system, the first floor drains alone, draining to sign the tube to establish to stretch the crest to ventilate the tube only, the dirty water was handle by septic tank again rear row to municipal soil pipe net; The fire fight system design becomes to eliminate the fire to bolt to extinguish fire the system, a fire water of the early 10 mins is supply by the fire fight water tank, normal the water supply be pumped by the fire fight Pump from the Saving pond ;The hot water system divides the area circumstance in accordance with the cold system of water, the cold water passes to give or get an electric shock after the heating apparatus concentration heat, again from promote the pump to provide to go together with the pipe line net, The hot water adopt is the closing type machine half circulatory system; The rain water adoption is inside drain the system, rain water direct row to munici p al soil pipe net.

热水采用的是封闭式机械半循环系统,分区情况和冷水系统一致,冷水通过电加热器集中加热后,再由提升泵供向配水管网;雨水采用的是内排水系统,雨水直接排向市政污水管网。

The invention provides a method for preparing a tube-shaped cathode of a direct methanol fuel cell, belonging to the fuel cell field and comprising the steps of: dispensing a single solution for gel injection molding at first, then adding a mesophase bituminous coal micro ball into the single solution and stirring evenly to obtain stable slurry, then casting the slurry into a die, preserving heat until the single solution reacts with a cross-linker completely to obtain a carbon-biscuit, after drying and sintering the biscuit in vacuum, preparing a diffusion layer and a catalyst layer on the surface by dipping process, and then coating polyester electrolyte membrane with a burette, rolling the carbon on a warm table to solidify the electrolyte membrane.

一种制备直接醇燃料电池管状阴极的方法,属于燃料电池领域。本发明首先配制凝胶注模用单体溶液,之后将中间相沥青炭微球加入到单体溶液中,搅拌均匀得到稳定的浆料,然后将浆料浇注到模具中,保温至单体与交联剂完全反应,得到炭管素坯,将素坯烘干、真空烧结后,在其表面采用浸渍工艺制备扩散层、催化剂层,然后采用滴管涂覆聚合物电解质膜,在加热台上对炭管进行滚压,使电解质膜固化。

The coherences between Te and the thermal lithospheric thickness, the base depth of magnetic tectonic layer are much better in the whole Transect, these demonstrate Te of continental lithosphere is closely concerned with"heat"geophysical parameters, also prove the heat structure of the lithosphere is the primary factor of influencing the value of Te.

整个断面上热岩石圈厚度、磁性构造层底面深度与Te值的相关性更好。

The results show that BS 460MPa grade reinforced bar can be produced all from Q235 or 20MnSi billet by the remained heat treatment process but the production cost of the former is lower. When the water pressure minishes, the intensities of reinforced bar reduce; the higher the temperature at the entrance of cooling bed is, the lower the intensities are. Therefore, the commendatory process parameters are that five stages coolers should be opened, water pressure should be all 1.8~2.0MPa and the temperature at the entrance of cooling bed of Q235 reinforced bar should lower than 650℃. The typical microstructure(Q235): the surface layer is tempered sorbite; the transition layer is pearlite and ferrite, and the partial ferrite is acicular; the core is pearlite and ferrite and the grain fineness is 8~10 grade. The yield strength is reduced by 10~20MPa after natural ageing and it can be simulated by artificial ageing(100℃×2h or 200℃×1h).

结果表明,Q235和20MnSi钢都可以利用余热处理工艺生产出性能合格的钢筋,但前者的生产成本较低;水压减小,钢筋强度降低,上冷床温度越高,强度越低,推荐5段水冷器全开,水压均为1.8~2.0MPa,Q235钢筋的上冷床温度应控制在650℃以下;钢筋典型的金相组织(Q235)表层为回火索氏体,过渡层为珠光体+铁素体且部分铁素体呈针状,心部为珠光体+铁素体,晶粒度8~10级;自然时效后屈服强度下降10~20MPa,用人工时效可以模拟自然时效,工艺是100℃×2h或200℃×1h。

YTS compound is mainly used to warm foaming agent concrete foam insulation, foam concrete insulation, thermal insulation layer of the production, it could cement, magnesia, lime, gypsum, powder, sawdust, fly ash, sand, Pak Nai paper sludge and other raw materials, foam, made of foam concrete, wall board, lath, block, hollow brick, heat pipe protection kits, roof insulation foam board and other lightweight building materials, also can be used for the production of roofing insulation layer.

HTD-1型复合发泡剂主要应用于地暖泡沫混凝土绝热层、泡沫混凝土隔音、保温垫层的生产,其可对水泥、氧化镁、石灰、石膏、石粉、锯末、粉煤灰、沙、造纸废渣白泥等多种原材料发泡,制成泡沫混凝土、隔墙板、板条、砌块、空心砖、实心砖、热力管道保护套、屋顶隔热板等多种轻质泡沫建材,也可用于屋面保温隔热层制作。

The heat conduction model of the PE fuel with the surface melting and pyrolyzing is developed for the H2O2-PE hybrid rocket motor. Combining with the energy fluxes balance above fuel surface, the simulation and calculation of transient heat conduction of the PE fuel with liquid layer while melting and pyrolyzing are considered by use of the moving coordinates.

建立了PE燃料的熔化、热解、导热模型,应用动坐标系,结合燃料表面热环境,对具有液体层的PE燃料的熔化、热解和内部瞬态导热过程进行了模拟计算,计算的PE燃料退移速率与国外同类试验的测量结果符合较好。

The 120m3 BF foundation temperature is reduced from 950℃ to below 700℃ and the furnace life campaign is prolonged for more than 2 years by taking furnace maintenance measures such as batching schreyerite in burdens to deposit Tion hearth bottom to form a steady protective layer and make molten iron liquidity slower to slowdown the erosion on bottom, drilling holes to lay water-cooling pipes in heat resistant foundation to heighten the 1150℃ isothermal line of molten iron to make frozen metal layer thicker.

对济钢120m3高炉炉底侵蚀状况,在生产中配加钒钛矿,使其还原成Ti的沉积,以对炉底形成稳定保护层,降低铁水流动性,减缓铁水对炉底冲刷;同时在耐热基墩打孔,穿埋水冷管,促使炉缸铁水1150℃等温线上移,凝固团增厚。实践表明,特护期间炉基温度由950℃下降至700℃以下,炉役寿命延长2年以上。

The experimental result shows that when the discharge time was more than 1.5μs, small crack emerged in the fuses due to mechanical force on the heated fuse, and the metallized layer would be evaporated as the crack became long enough to generate disruptive discharge. When the discharge time was less than 150ns, small crack emerged in the fuses due to the current heat, and the metallized layer would be evaporated as the crack became long enough to generate disruptive discharge.

实验结果表明:当熔丝的通流时间大于1.5 ms时,电流热效应产生的机械力使安全膜熔丝的金属层产生微小裂纹,当裂纹达到一定长度,两端发生击穿放电,金属层因蒸发而断开;当熔丝中通过较大的电流时,短时间内(50 ns)的电流热效应使熔丝金属层发生熔化产生裂纹,裂纹两端发生击穿放电,金属层因蒸发而断开。

第6/17页 首页 < ... 2 3 4 5 6 7 8 9 10 ... > 尾页
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。