英语人>网络例句>heart-whole 相关的网络例句
heart-whole相关的网络例句

查询词典 heart-whole

与 heart-whole 相关的网络例句 [注:此内容来源于网络,仅供参考]

The concrete face slab, concrete crushing-type side wall and toe board are looked as submodel, which is separated from the whole model of CFRD. The calculated displacement in the whole model is applied to the bottom side of the crushing-type side wall, and the water pressure is applied to the surface of the concrete face slab.

子模型法把面板、挤压边墙以及面板周边的混凝土趾板从面板堆石坝的整体模型中脱离出来作为研究对象,在挤压边墙的底都施加与其相连的已如垫层料位移,在面板的表面施加水压力,进行数值分析。

In the reforming and developing new times, facing with the management revolution wave tide of the whole world, and the whole society' s call to "being based on people".

在全球大变革、大发展的新世纪,面对全世界的管理革命浪潮,面对全社会对&以人为本&的呼唤,走人本管理之路是加强和改进部队管理的必然选择。

In order to ensure the construction process safe and the bridge structure would reach its ideal state, lots of questions in its whole construction control and swivel ereetion construction control are discussed and studied.Firstly, based on the experiences about the cable-stayed bridge's construction control, do emulational anlysis to Sui Fenhe cable-stayed bridge by using the bridge analyzing program of BSAS and Dbridge, analyze the parameters' sensitivity, study the temperature effects, discern the relevant parameter's errors about construction control and optimize its construction state.Secondly, as an example of Sui Fenhe cable-stayed bridge's swivel erection construction control, present the design and construction techniques of simple point supporting and even articulation and level swivel erection for long-span cable-stayed bridge, study its load-bearing system, balance system, power system and adjustment system in detail, check its static stability on the state of swivel erection construction and monitor the whole swivel erection construction.

首先,在斜拉桥施工控制经验的基础上,用桥梁结构分析程序BSAS和Dbridge对绥芬河斜拉桥进行了详细的施工仿真分析,参数敏感性分析,温度效应分析,施工控制影响参数误差分析和结构施工状态的最优化控制;其次,以绥芬河斜拉桥转体施工控制为例,介绍了大跨度斜拉桥单点平铰水平转体设计与施工技术,详细研究斜拉桥单点平铰水平转体支承系统、平衡系统、动力系统和调整系统,并对本桥结构转体施工做静力稳定性验算及转体过程的监控。

Of a dish and a dish use the work word steel the welding pays to accept, a dish inner part adoption the Cape iron and the slot steel welding become whole framework, because of conveyance space limit, each dish is divided into two part, combination hour in the interval adoption M18 fix the stud bolt connects with each other to counteract the electric welding 焊 dead, the shape bottom use 8100 mms work word steel welding be used as to pay to accept, and with before install work well of the cement pillar foundation sprinkle to cast into the integral whole.

圆盘与圆盘之间用工字钢焊接支承,圆盘内部采用角铁与槽钢焊接成整体骨架,由于运输空间限制,每一圆盘分为两部分,组合时其间采用M18固定螺栓相连并用电焊焊死,造型底部用8根100mm工字钢焊接做为支承,并与安装前做好的水泥柱基础浇铸成一体。

Simulation on steam system of the secondary loop of nuclear power plant is an important part of research of real-time, whole range, whole functional simulation of nuclear power plant.

核动力装置二回路蒸汽系统仿真是核动力装置实时、全范围、全功能仿真机研制工作的重要组成部分。

Competition of large award of music of network of this whole nation saves government of people of stage state city to wait to be sponsorred jointly by Chinese Internet association, Zhejiang, the whole nation divides 8 contests area, will criticize a network singer, former achieve Le Baobei of song, net each 10, and individual award each 3, player of all bear the palm all can win 1000 yuan of award to 100 thousand yuan of different amount, and the autograph makes an appointment with large broker company to undertake acting art groom wait for an opportunity.

此次全国网络音乐大奖赛由中国互联网协会、浙江省台州市人民政府等共同主办,全国分8大赛区,将评出网络歌手、原创歌曲、网乐宝贝各10名,以及单项奖各3名,所有获奖选手均可获得1000元到10万元不同金额的奖励,以及签约大型经纪公司进行演艺培训等机会。2007年8月,大赛开始。12月初,大赛进入全国总决赛阶段,先后产生各组100强、80强,40强。12月15日起,大赛40进20强的PK赛开始。

The bung uses the stainless steel plate to make the ledger wall, the built-in aluminum silicate heat preservation, the fire door size extends 350mm, high 580mm, in spandrel wall body whole upward promotion type electrically operated heat preservation fire door, when fire doorclosure the entire fire door is a circular whole, the fire door sealing property strengthens, the turntable uses the stainless steel to make the 1600m/m turntable, with take load bearing work piece, the entire turntable does not divide the location as the plane, the operators may pile up the workpiecewillfully, because turntable every 40 minutes turn on lathe biography one week, when work the operators did not look nearly the turntable in the rotation, the fire door starts in addition in a big way, the operators may pass in and out the work piece willfully, but is not limited the time the turntableto be possible in 20-60The minute revolves one week-long time to modulate velocity willfully, no matter the fire door opens shuts, the turntable from the start work on uninterrupted revolving, not any necessity and the fire door open shut carry on the interconnection, needs to stop when revolves, onlyneed press down on the control electricity tank's pause button then, the fire door opens shuts, grasps voluntarily by the operators, presses installs nearby the fire door opens shuts button then. Transfers the bottom type resistance furnace's temperature control part to use the microcomputer automatic

炉盖采用不锈钢板做底板,内置硅酸铝保温,炉门尺寸宽350mm,高580mm,侧墙体中整体向上提升式电动保温炉门,炉门关闭时整个炉门为一个圆形整体,炉门密封性能增强,转盘采用不绣钢制成1600m/m转盘,用以承载工件之用,整个转盘为平面不分工位,操作人员可以任意堆放工件,由于转盘每40分钟旋传一周,工作时操作人员几乎看不到转盘在转动,加上炉门开的较大,操作人员可以任意进出工件,而不受时间限转盘可以在20—60分钟旋转一周的时间任意调速,不论炉门启闭、转盘从启动工作就不间断的旋转,没有任何必要与炉门启闭进行联锁,需要停止旋转时,只需按下控制电柜上的停止按钮即可,炉门的启闭,由操作人员自行掌握,按动安装在炉门边的启闭钮即可。

The bung uses the stainless steel plate to make the ledger wall, the built-in aluminum silicate heat preservation, the fire door size extends 350mm, high 580mm, in spandrel wall body whole upward promotion type electrically operated heat preservation fire door, when fire door closure the entire fire door is a circular whole, the fire door sealing property strengthens, the turntable uses the stainless steel to make the 1600m/m turntable, with take load bearing work piece, the entire turntable does not divide the location as the plane, the operators may pile up the work piece willfully, because turntable every 40 minutes turn on lathe biography one week, when work the operators did not look nearly the turntable in the rotation, the fire door starts in addition in a big way, the operators may pass in and out the work piece willfully, but is not limited the time the turntable to be possible in 20-60The minute revolves one week-long time to modulate velocity willfully, no matter the fire door opens shuts, the turntable from the start work on uninterrupted revolving, not any necessity and the fire door open shut carry on the interconnection, needs to stop when revolves, only need press down on the control electricity cabinet's pause button then, the fire door opens shuts, grasps voluntarily by the operators, presses installs nearby the fire door opens shuts Niu then.

炉盖采用不锈钢板做底板,内置硅酸铝保温,炉门尺寸宽350mm,高580mm,侧墙体中整体向上提升式电动保温炉门,炉门关闭时整个炉门为一个圆形整体,炉门密封性能增强,转盘采用不绣钢制成1600m/m转盘,用以承载工件之用,整个转盘为平面不分工位,操作人员可以任意堆放工件,由于转盘每40分钟旋传一周,工作时操作人员几乎看不到转盘在转动,加上炉门开的较大,操作人员可以任意进出工件,而不受时间限转盘可以在20—60分钟旋转一周的时间任意调速,不论炉门启闭、转盘从启动工作就不间断的旋转,没有任何必要与炉门启闭进行联锁,需要停止旋转时,只需按下控制电柜上的停止按钮即可,炉门的启闭,由操作人员自行掌握,按动安装在炉门边的启闭钮即可。

The bung uses the stainless steel plate to make the ledger wall,the built-in aluminum silicate heat preservation, the fire door size extends 350mm, high 580mm, in spandrel wall body whole upward promotion type electrically operated heat preservation fire door, when fire door closure the entire fire door is a circular whole, the fire door sealing property strengthens,the turntable uses the stainless steel to make the 1600m/m turntable, with take load bearing work piece, the entire turntable does not divide the location as the plane, the operators may pile up the work piece willfully, because turntable every 40 minutes turn on lathe biography one week, when work theoperators did not look nearly the turntable in the rotation, the fire door starts in addition in a big way, the operators may pass in and out the work piece willfully, but is not limited the time the turntable to be possible in 20-60The minute revolves one week-long time to modulate velocity willfully,no matter the fire door opens shuts, the turntable from the start work on uninterrupted revolving, not any necessity and the fire door open shut carry on the interconnection, needs to stop when revolves, only need press down on the control electricity cabinet's pause button then, the fire door opens shuts,grasps voluntarily by the operators, presses installs nearby the fire door opens shuts Niu then.

炉盖采用不锈钢板做底板,内置硅酸铝保温,炉门尺寸宽350mm,高580mm,侧墙体中整体向上提升式电动保温炉门,炉门关闭时整个炉门为一个圆形整体,炉门密封性能增强,转盘采用不绣钢制成1600m/m转盘,用以承载工件之用,整个转盘为平面不分工位,操作人员可以任意堆放工件,由于转盘每40分钟旋传一周,工作时操作人员几乎看不到转盘在转动,加上炉门开的较大,操作人员可以任意进出工件,而不受时间限转盘可以在20—60分钟旋转一周的时间任意调速,不论炉门启闭、转盘从启动工作就不间断的旋转,没有任何必要与炉门启闭进行联锁,需要停止旋转时,只需按下控制电柜上的停止按钮即可,炉门的启闭,由操作人员自行掌握,按动安装在炉门边的启闭钮即可。

If the sole corporation,foreign part needs to provide the whole money and can earn the whole profit but also has to bear all risks.

至于独资企业,外商提供所有的资金,赚取所有的利润,同时承担所有的风险。

第74/500页 首页 < ... 70 71 72 73 74 75 76 77 78 ... > 尾页
相关中文对照歌词
Half To A Hole Thing
Whole Lotta Kisses
Whole House Rockin'
Whole Town's Talking
Dessert
Heart Break
Whole Lotta Zep
Whole Lotta Rosie
Whole Lotta Rosie
My Whole World
推荐网络例句

The work of this paper is as follows: 1. Looking back the progressing history of the linear motor, introducing the features of the elevator driven by linear induction motor, radicating the topic of this paper "the digital frequency variable control of the elevator bi-side direct driven by linear induction motor". The research of this paper covers the conventional VVVF control, space vector based VVVF control, vector control and DTC.

本文主要开展了以下几个方面的工作: 1 回顾了直线电机发展历史,电机的驱动技术演变,特别是针对直线电机的驱动,简要介绍了直线感应电机驱动电梯的优点和不同结构类型,对传统的v/f控制,基于空间矢量法的v/f控制,矢量控制,和基于电压空间矢量的直接转矩控制进行了比较,确立了本课题的研究主题:直线感应电机双边直推式驱动电梯的全数字变频控制。

The article combines with the treatment of a superficial civil air defense work to introduce how the grouting method to improve the performance of the backfill soil.

文章从治理漂浮人防工事的角度提出了注浆技术在改善回填土性质方面的应用,并详细阐述了注浆技术的施工流程。

I knew nor shyness nor fear, my life was boisterous.

我不懂得羞怯和惧怕,我的