英语人>网络例句>ground water 相关的网络例句
ground water相关的网络例句

查询词典 ground water

与 ground water 相关的网络例句 [注:此内容来源于网络,仅供参考]

Based on the management principle and objective of Jiangsu SNWDP, the thesis establishes its management framework and designs three management patterns and four modes. Through analyzing the anticipative management effect, scopes in point, advantages and disadvantages of each modes seriatim, the thesis confirms the recommended pattern. It makes framework refinement design, defines rights and duties of control level, execution level and participation level for the recommended pattern. According to the principles of planned water use, metered water use, contract water use, toll water use, it studies project operation for recommended pattern from four aspects, namely water supply plan, measure intensified, water supply contract, and water rate enacted. The thesis analyses and studies how to ensure water supply quality of Jiangsu SNWDP from three levels, including doing watershed protection, intensifying intermediate process, and establishing a long-term mechanism. It makes brief design for dispatching management applied system, studies emphases parts which may affect operation of the pattern in practice, also analyses dispatching optimization of Provincial boundary project management, pumping station management, and different water resources. Finally, the thesis studies relevant basal supports and development stratagems for the management of Jiangsu SNWDP.

本文从分析南水北调江苏境内工程的管理原则、管理目标入手,构建南水北调东线江苏境内工程管理组织框架,设计了管理的三种模式,四个方案,对各种方案的预期管理效果、方案的适用范围、方案的利弊逐一分析,经比选后确定推荐模式;并对推荐模式进行结构细化设计,界定调控层次、执行层次、参与层次的权责;从供水计划、加强计量、供水合同、水价制定方面对推荐模式进行了工程运营的具体研究;从做好源头保护、强化中间过程、建立长效机制三个层次,分析研究如何确保南水北调江苏境内供水水质;对调度管理应用系统作了简要设计;针对实际管理中可能影响整个模式运行的重点细部:省界工程管理、泵站工程管理、不同水资源的优化调度等进行了研究;本论文还分析研究了南水北调江苏境内工程管理的相关基础支撑和发展战略。

Iii. Process Water cont'd Type 3 Water - Purified Water (e.g., USP Purified Water), in Europe the EMEA refers to this a Highly Purified Water - Most difficult to control microbial levels, because no preservative chlorine is present in the water -Less expensive to produce than Water for Injection Type 4 Water - The most critical quality level -Commonly used in final formulation for parenteral applications -Must satisfy the Water for Injection specification as laid out in compendia such as the USP iii.

工艺水 第3类型水-纯化水,在欧洲,EMEA称为高纯水。-控制微生物水平最困难,因为水中没有防腐的氯。-与注射用水比较,生产成本较低第4类型水-最高质量要求-通常用于非肠道用药的最后制剂中-必须符合诸如美国药典这类法定文本中描述的注射用水的规格

Through the tests on gas driving water and water driving gas, the flow law of gas and water was real-time observed. Mainly based on the test of water driving gas as an example, the development of molding coal sample and NMR triaxial osmoscope was demonstrated. The experiment process of water driving gas and parameters were demonstrated. NMRI images of molding sample in horizontal cross-section along the driving direction were obtained by NMRI instrument. The results from images were analyzed and compared. Some novel laws were obtained as the following:(1) the leading edge of water driving has inconsistency. This certified the important previous conclusion that the storage of methane mainly was absorbed in inner surface of pore from NMRI technique;(2) the existence of dominant driving pathway was tested and the way kept almost fixed. The pathway is apt to exist in the edge of coal samples where pore and fracture fully develop;(3) the variation of water flow determines the transport velocity of leading edge of water driving and it has lag effect;(4) the effectiveness of the first driving is better than the second driving;and (5) the subsequence of water driving gas are from trunk fractures to branch fractures, then to branch pores.

主要以水驱气NMRI试验为例,详细介绍了核磁共振三轴渗透仪和型煤试件的研制,并重点阐述了水驱气试验过程和相关参数,利用NMRI技术实时观测得到了不同时间沿驱替方向型煤试件水平剖面的NMRI成像图,最后对试验结果进行了比较分析,揭示了一些新的规律认识:(1)水驱替前缘具有不一致性,从NMRI试验角度验证了前人甲烷类气体赋存形式主要以吸附在孔隙内表面为主的重要结论;(2)煤试件存在优势驱替路径,且这种优势路径在驱替过程中基本保持不变,水驱气的优势驱替路径易产生在煤试件边缘,即煤孔隙裂隙发育区;(3)水驱流量变化决定了水驱前缘的运移速度,且对水驱气效果具有滞后效应;(4)水驱气初次驱替效果好于二次驱替效果;(5)水驱替气的顺序为:主要大裂隙—周边裂隙—周边孔隙。

Service: service hours 8 am - 10 pm, every year / month the amount of the total cost of drinking water 5% of the gifts gift drinks dispenser: corporate users for free gifts With the fountain, life-long free bag repair, cleaning, disinfecting drinking fountains line bottled water (Guangdong, the first A-water) Recommendation: Regular replacement of bottled water may be more wholesome ex-factory sales of Angel brand water dispenser ( package repair two years, including all parts) to provide water, telephone: 0755-82298935 82,282,747 SMS provides water: 13714594399 QQ provides water: 280,141,771 uniform inquiries and complaints Telephone: 13,714,594,399 Huang http://ww w.zhenbutong.sm160.net songshui.100ye.com water to the city's professional chains leave benefits up minute penalty sent a note: a half-hour sent to the service, limited to the areas where the above!

服务:服务时间早8点--晚10点,每年/月饮水总费用金额的5%礼品饮料赠送饮水机:公司用户免费赠用饮水机,终身免费包修、清洗、消毒饮水机一线桶装水建议:经常更换桶装水可能更有益健康出厂价销售安吉尔品牌饮水机(包修二年、含所有零配件)订水电话: 0755-82298935 82282747 短信订水:13714594399 QQ订水:280141771 统一咨询及投诉电话:13714594399黄平 http://www.zhenbutong.sm160.net songshui.100ye.com 专业送水全市连锁假一罚百三十分钟送到注:半小时送到服务,只限以上所在区域!

When a sudden power failure or accident or normal pump stops when the pump stops, the valve inlet water velocity to reduce stress Agency, the valve plate also fall, when its velocity is zero (that is, inlet flow rate is zero Department), large valve plate because of its own gravity and rapidly turn off (time 3s ~ 5s), the majority of water to prevent backflow, when the valve before and after the formation of a water pressure, water stress, on the one hand through the small valve at the bottom of the three slot for pressure relief vent pressure. 4 water stress from the bypass tube into the cavity patch up the control room (this process for the suction pressure chamber that can effectively absorb the energy of water), when water stress on cavity than inferior vena cava, the pressure of water promote the diaphragm down mobile , the current cavity pressure of water being squeezed out all the small valve plate slowly drop back to standby status, the process time to ease closure adjustable (3s ~ 150s), then the valve has been fully closed, watertight.

当突然停电或事故停泵或正常停泵时,阀门进水口处压力水流速降低,大阀板也随之下降,当其流速为零时,大阀板由于自身重力而迅速关闭(时间3s~5s),可防止大部分水倒流,此时阀门前后形成一种水压差,压力水一方面通过小阀板底部的三条泄压槽进行泄压。4)压力水从旁通管进入膜片控制室上腔(此过程为吸压腔,能有效吸收一部分水能量),当上腔压力水大于下腔时,压力水推动膜片往下移动,当下腔压力水全部被挤出来时,小阀板缓缓下降,恢复到待机状态,此过程中缓闭时间可调节(3s~150s),届时阀板已全部关闭,滴水不漏。

This study mainly focused on the water resource and environmental crisis, which are all caused by agricultural irrigation in Inner Mongolia irrigation area. Based on the balance of total water quantity between ground water, underground water and soil water, a study was made on the water quantity varieties in the headraces and offtakes, and the affection of the water cycle under the human activities was quantitively caculated.

针对引黄灌区所面临的水资源问题及灌溉引起的环境问题,以内蒙古河套灌区为研究对象,从灌溉引水、用水、排水之间的转化关系为切入点,以地表水、土壤水和地下水之间的水量平衡理论为基础,定量研究河套灌区在人类影响条件下的水循环特征。

This study mainly focused on the water resource and environmental crisis, which are both caused by agricultural irrigation in the Inner Mongolia irrigation area. Based on the balance of total water quantity between ground water, underground water and soil water, a study was made on the water quantity in the head races and offtakes, and the effect of human activities on the water cycle was quantitatively calculated.

针对引黄灌区所面临的水资源问题及灌溉引起的环境问题,以内蒙古河套灌区为研究对象,从灌溉引水、用水、排水之间的转化关系为切入点,以地表水、土壤水和地下水之间的水量平衡理论为基础,定量研究了河套灌区在人类影响条件下的水循环特征。

AUTO GROUND: Automatic ground balance - raise search coil off ground, press the AUTO GROUND button, lower the coil to the ground, and release the button for precision auto-balancing.

自动地面:地面自动平衡-提高搜索起飞地面线圈,按AUTO按钮地面,降低线圈到地面,并释放精密自动按钮平衡。

Many structural deficiencies and mistakes were highlighted, which including excessive horizontal displacement in the ground, more severe damaged transition layer (the first masonry structure layer), ground with farraginous structure, and poor construction quality. Finally, lateral stiffness ratio of the second to ground story in masonry buildings with RC frame structure at the bottom will be optimized following difference of materials between the ground floor and the upper floors. The strength and the ductility of transition layer, as well as shear walls in the ground floor, are crucial to keep the building standing during large earthquake.

在介绍和总结了汶川地震中底框砖房的表现―底层过大的水平侧移、过渡层严重破坏或完全坍塌、底层严重破坏或房屋完全倒塌、上部砌体整体发生侧移、以及设计一和施工质量良好的底层抗震墙砖房&大震不倒&的基础上,得出以下结论和建议:在抗震设防地区应禁止使用部分底框砖房,地震中过渡层的实际受力情况与设计所采用的受力状态有明显的区别,规范应考虑砌体和钢筋混凝土材料的不同力学性质来制定上下层刚度比要求,明确对过渡层的延性和强度要求,明确该类结构抗震概念设计的具体措施。

1605 Antiaircraft Artillery Regiment, 4 Bomber Aircraft Corps (202, 219, 321 Bomber Aircraft Division), 5 Ground Attack Aircraft Corps (4 Guards, 264 Ground Attack Aircraft Division), 8 Ground Attack Aircraft Corps (224, 227 Ground Attack Aircraft Division), 5 Fighter Aircraft Corps (8 Guards, 256 Fighter Aircraft Division), 10 Fighter Aircraft Corps (10 Guards, 235 Fighter Aircraft Division), 10 Guards Ground Attack Aircraft Division, 331 Fighter Aircraft Division, 208 Night Bomber Aircraft Division, 98 Guards, 50 Recon Aircraft Regiment, 372, 1002 Separate Artillery Regiment

第1254﹑1554﹑1555﹑1605防空炮团,第4轰炸机军(第202﹑219﹑321轰炸机师),第5强击机军(第4近卫强击机师,第264强击机师),第8强击机军(第224﹑227强击机师),第5歼击机军(第8近卫歼击机师,第256歼击机师),第10歼击机军(第10近卫歼击机师,第235歼击机师),第10近卫强击机师,第331歼击机师,第208夜间轰炸机师,第98近卫侦察机团,第50侦察机团,第372﹑1002独立炮兵团

第4/500页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
40 Water
Hot Water Burn Baby
Wade In The Water
Cool Cool Water
Water Whippin'
I Go Swimming
Water
Water
Wade In The Water
Water
推荐网络例句

A carrier gas such as nitrogen is directed through line 20 and valve 22 to connect with line 26 and mix with the gas sample.

如氮气之类的载体通过管线20和阀22引入,与管线26相通,与气体样品混合。

But for the most part, knaves and parasites had the command of his fortune

然而支配他的家产的大多是恶棍和寄生虫。

For he that is now called a prophet, in time past was called a seer.

他们就往天主的人所住的城里去了。