查询词典 girder
- 与 girder 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Long-span steel bridge deck pavement is a box girder bridge-building, one of the key technologies, domestic less successful experiences.
桥面铺装是大跨径钢箱梁桥建设的关键技术之一,国内成功经验较少。
-
In a word, the top bunt slippage method is a particular way in practical process of steel box girder installation.
通过未用项推滑移安装方法,对钢结构桥梁进行了成功的安装,达到了预期的目的,同时降低施工造价。
-
The equation of camber is often used when the bend of girder is being studied.
在对梁的弯曲进行研究时,经常要用到弯矩方程。
-
Especially low highness of girder ,when we adopt steel through truss bridge in campagna bridge construct because of low cost.
在平原区桥梁建设中,跨线桥采用下承式钢桁架桥,因主桥梁高低,能降低整个桥梁段的造价。
-
This bridge design for 2×80m the continual steel truss girder bridge, the span is 160m, the main spar center distance is 5.75m, clothes rack high 11m, panel length 8m, the main spar geometry graphical representation uses the triangle web member system, the floor system by the carline, the crosnbeam is composed, the member connection uses the high-strength bolt connection, the design load for the dead load and - the live load.
该桥设计为2×80m连续钢桁梁桥,全长为160m,主桁中心距为5.75m,桁高11m,节间长8m,主桁的几何图示采用三角形腹杆体系,桥面系由纵梁,横梁组成,杆件连接采用高强螺栓连接,设计荷载为恒载和中—活载。
-
One of the major difficulties in design of plane curved prestressed girder bridges is how to determine its center line of gravity of prestessing force of steel breafly written as c.
如何确定平面曲线梁桥中预应力钢筋合力重心线的位置,是一个尚未解决的问题。
-
At the same time,this paper conclude that the deviation limit standard of each testing project for the box double-bridge crane,and present the new method that processing crane main girder deflection of the box double-bridge crane by straining wire rope,the new method that preventing and eliminating the box double-bridge crane running defect by wheel track circular measure.
总结出:箱形双梁桥式起重机运行缺陷各检测项目的极限偏差标准。获得了:处理箱形双梁桥式起重机主梁挠度的新方法—拉钢丝绳法;预防和消除箱形双梁桥式起重机运行缺陷的新方法—圆弧轮、轨法。
-
Colligation point of girder should ensure stability of assembly , otherwise , temporary fixation should be carried out before assembly
钢梁的绑扎点要保证钢梁的吊装稳定性,否则就需在吊装前进行临时加固。
-
Through referring related documents and analysis of builded bridges home and abroad, this dissertation makes anslysis on design of whole bridge on the basis of design theory for general box-girder, and combined with the design of Long-March bridge. There makes a special research on shear connecter which connecte corrugated steel webs with concrete board up and down. Design method of shear connecter is discussed.
本文在参阅国内外有关文献及实桥资料的分析,以普通混凝土箱形梁设计理论为基础,结合长征桥的设计,分析了整个桥梁的设计过程,尤其对波形钢腹板和顶底板混凝土的剪力连接件进行了研究,给出了计算方法。
-
A curve coordinate system which is suitable for variable height curved box-girder were established.
当曲轴线半径与箱梁宽度比小于10时,必须考虑曲率沿横向变化的影响。3。
- 相关中文对照歌词
- Nobody Loves A Riveter
- Uh Oh
- Mr. Popeil
- 推荐网络例句
-
Just so you know where we're going...
只要让你知道我们的目标。。。
-
One of his friends acted as the gobetween in his business.
在这件事中,他的一个朋友充当了中间人。
-
The link travel time is selected as the fundamental quantity of route guidance based on the Dynamic Traffic Assignment theory.
关于向用户传送什么信息,本章从动态交通分配理论的角度对采用行程时间作为基本量进行路径诱导进行了解释。