查询词典 girder bridge
- 与 girder bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
At the same time,this paper conclude that the deviation limit standard of each testing project for the box double-bridge crane,and present the new method that processing crane main girder deflection of the box double-bridge crane by straining wire rope,the new method that preventing and eliminating the box double-bridge crane running defect by wheel track circular measure.
总结出:箱形双梁桥式起重机运行缺陷各检测项目的极限偏差标准。获得了:处理箱形双梁桥式起重机主梁挠度的新方法—拉钢丝绳法;预防和消除箱形双梁桥式起重机运行缺陷的新方法—圆弧轮、轨法。
-
According to theory analysis and example computation, the following conclusions are obtained.1. During the analysis on the cable shape in the suspension bridge"s completion state, the pre-displacement of saddle and the case that the cable and stiff girder commonly bear the second-stage dead load should be considered.2. When supposing the construction ideal initial state in the first time, if the initial state model is established according the cable"s span central sag in the bridge"s completion state, and the reasonable correction formulation is created in the iteration process, the result can converges fast.3. The cable shape in the bridge"s completion state is not parabolic, nor catenary. It is between parabola and catenary. Actually it is funicular polygon closer to the catenary.
通过理论分析和实例的计算表明:1在悬索桥主缆成桥线形分析过程中,须考虑主塔鞍座的偏位以及二期恒载由主缆和加劲梁共同承担的实际情况;2在第一次假设施工理想初态时,以成桥状态已知的主缆跨中垂度建立施工理想初态模型,同时在迭代计算的过程中,建立合理的修正公式,才能使收敛的速度快:3在成桥状态时主缆的线形既不是抛物线,也不是悬链线,而是介于抛物线与悬链线之间,更接近于悬链线的索多边形。
-
Fault condition includes the descent of cable force, sinkage of bridge tower and structure change of the main girder. Data recorded are cable force, girder stress, girder linetype, frequency response function, mode shape and etc.
其中损伤的形式有索力下降、主梁局部刚度变化以及桥塔不均匀沉降等,监测的参数主要有拉索索力、桥面线型、主梁应变等静态参数以及主梁固有频率、频响函数和振型等动态参数。
-
Basing on the statistic datum existed of bridge deck pavements, analyze the main failure modes and its main causes to damage on different styles of bridge, at the same time, through the big calculation software ,establish the space models to simulate the course of mechanics of bridge deck pavements, analyze the main factors which affect the bridge deck pavement"s mechanics and the relations between them; according to the atmospheric circulation circumstances of bridge deck pavements, take the statistic datum of using life of prefabricated T-beam、box girders and casting girder in region of HUA-NAN as examples to returning analysis ,establishing the life prediction model of this style bridges; associating "the Method of Estimating to Life Cycle Costing,bring forward this method to take a evaluation of economy on bridge deck pavements, insure the life cycle costing reasonable; giving some tactics on the design of bridge deck pavements.
以既有桥梁的桥面铺装层使用现状统计资料为基础,分析了各种类型桥面铺装层的主要破坏形式及其主要损伤原因,同时利用结构分析软件,对桥面铺装层建立空间模型模拟其受力作用过程,分析影响桥面铺装层受力大小的主要因素以及各因素与铺装层受力大小之间的关系;按照桥面铺装层所处环境的不同,以华南地区预制T、箱梁和现浇梁的桥面铺装层正常使用寿命统计数据为例,通过回归分析建立该类型桥面铺装层的正常使用寿命预测模型;利用寿命周期费用评价方法,对特定铺装层的设计方案某一参数的变化所带来的经济效益进行评价;给出桥面铺装层设计构造建议。
-
The project used in conjunction with three holes of a prestressed continuous box girder design, layout for cross-bridge 30m +30 m +30 m, two-way four-lane bridge to meet current conditions, after the completion of the construction of the bridge under the bridge to meet the 8-lane two-way traffic conditions.
本工程采用三孔一联预应力连续箱梁设计,桥跨布置为30m+30m+30m,桥上满足双向四车道通行条件,建设完成后满足桥上桥下双向8车道的通行条件。
-
In the construction of highway bridge and railway bridge, square box boltwelding girder steel bridge is commonly used in the construction of steel bridge.
在公路、铁路桥梁建设中,方箱式栓焊梁钢桥梁,是钢桥梁建设中常用的一种桥梁形式。
-
Taking Rong hu bridge project as the background, the paper Studies on the optimization of dead load cable tension, construct system of controlling, effect of non-linear factor, limit bearing capacity of structure and spatial stress of concrete-filled steel tubular tower and the combination of girder, which are based on the hybrid cable-stayed bridge.Asking for the maximal deformation of tower and girder to be minimized and cable permissible stress as constraint conditions, the paper tries to solve the ideal dead load cable tension by combining finite element calculation and optimize analysis.
本文以蓉湖大桥工程为背景,就混合梁斜拉桥的成桥恒载索力优化、施工监控体系、过程非线性因素影响、结构极限承载力、索塔和主梁结合部的空间应力分析等问题开展研究:关于索力的优化,是以斜拉桥索塔和梁的最大变位最小为目标,以拉索容许应力为约束条件,采用有限元计算与优化分析相结合的方法来确定斜拉桥的成桥合理恒载索力。
-
In the case of a super-long span suspension bridge across wide mountain valley, steel truss stiffening girder is more adaptable for the bridge section than steel box girder due to the limitation of construction condition.
在山区峡谷大跨度悬索桥的建设中,由于受施工条件的限制,桁架加劲梁比钢箱梁在施工方面具有更好的优越性。
-
Taking into consideration of the case that the rigidity of spatial latticed girder construction was higher than that of suspended cable construction, it was proposed that the latticed girder was used to construct a suspension bridge with truss stiffened by plate-latticed girder instead of the conventional stiffening truss.
利用空间网架结构刚度大而悬索结构刚度较低的特点,提出采用网架结构代替常规悬索桥的加劲梁,构成平板网架-悬索桥。
-
During the period of construction by the cantilever erection construction method, bridge experiences not only the process of generating girder in the stage of T rigid frame, but also the process of system transformation, so bridge has experienced a great complex stress process, in order to ensure the security of bridge during the whole stage of construction, the stress control and geometry control must be made during the stage of construction of bridge.
近些年来,我国随着经济的快速增长,出现了建造大跨度桥梁的高潮,预应力混凝土技术的迅速推广应用以及建造预应力混凝土连续梁桥的各种先进施工方法应运而生,加快了桥梁的施工进度,使得预应力混凝土连续梁桥的跨越能力不断增大,悬臂拼装施工方法就是在这种背景下产生并发展起来的。
- 推荐网络例句
-
The concept of equivalent rotationally rigidity is offered and the formula of rotationally rigidity is obtained.
主要做了如下几个方面的工作:对伸臂位于顶部的单层框架—筒体模型进行分析,提出了等效转动约束的概念和转动约束刚度的表达式。
-
Male cats normally do not need aftercare with the exception of the night after the anesthetic.
男猫通常不需要善后除了晚上的麻醉。
-
Its advantage is that it can be used in smaller units.
其优点在于可以在较小的单位中应用。