英语人>网络例句>geography 相关的网络例句
geography相关的网络例句

查询词典 geography

与 geography 相关的网络例句 [注:此内容来源于网络,仅供参考]

In ancient time, toponomy ,maps and geography are all the learning of disclosing the geographic entities.

认为地名、地图、地理在古代都是揭示地理实体的学问。

Toponomy is the science that studies the ctymon,meaning,evolution, varieties of distribution,modern function and standardization of the place names.It has close relationship with linguistics,geography and history etc..

地名学是研究地名的语源、含义、演变、分布类型、现代功能及其规范化的一门学科,与语言学、地理学、历史学等有着密切的关系。

According to the analysis of the documents of both the ancient time and nowadays,the course which mankind recognises geographic entity starts with individuality and studies on each individuality's spatial relationship,and then discloses the entity's forms, connections and properties. The course of cognition develops just from toponomy to maps, till geography. The original relationships disclosed these...

根据古今文献记载的分析,人类认识地理实体的过程是由个体开始,继而研究各别个体的空间关系,进而揭示实体的构成、联系和性质,这一认识过程正好是由地名到地图再到地理;由其产生的渊源关系也揭示出三者皆是共同研究人类赖以生存的地理环境的科学,故都是组成地理科学的成员

The unique geography and climatic conditions have accomplished Luzhou liquor unique qualities with unduplicated and irreplaceable advantages ; as a result of being a typical representative Liquor City with rich fragrance like Luzhou Laojiao and Maotai-flavor style liquors such as Lang Liquor.

最具竞争优势和发展潜力的酿酒业独特的地理、气候条件,造就了泸州美酒的独特品质,形成了泸州酒独一无二、不可复制与替代的优势,使泸州成为全国唯一拥有浓香型、酱香型两种白酒典型代表的城市。

This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).

文章根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了宁波常洪沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。

This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).

本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。

This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).

本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。中国诺宇综合网http://www.siaaa.com

This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).

本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。中国论文联盟http://www.lwlm.com

However, because of its obvious abuses, it is not suitable to the current curriculum reform of geography.

只有通过提高作为过程的课堂教学的质量,才会有高质量的教学结果。

Forestry appertains to geography , to botany, and to agriculture

森林学与地理学、植物学和农学有关。

第66/88页 首页 < ... 62 63 64 65 66 67 68 69 70 ... > 尾页
相关中文对照歌词
Geography Of A Horse Dreamer
推荐网络例句

With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.

随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。

But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.

不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。

Closes the eye, the deep breathing, all no longer are the dreams as if......

关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。