英语人>网络例句>fuse rating 相关的网络例句
fuse rating相关的网络例句

查询词典 fuse rating

与 fuse rating 相关的网络例句 [注:此内容来源于网络,仅供参考]

Glass, ceramic tube fuse; resettable fuse, automotive fuse; strong electricity fuse; ultra-small capacitance, resistance of the Bi-High-type fuses; surface mount fuses, etc., telephone dedicated fuse; BS Plug Fuse-specific; handheld devices termination ESD protection; at the same time with the tube fuse tube matching folders, tube socket and other products.

玻璃管、陶瓷管保险丝;自复保险丝、汽车用保险丝;强电用保险丝;超小型电容、电阻之必高二型保险丝;表面贴装保险丝等,电话机专用保险丝;BS插头专用保险丝;手持装置的ESD端接保护;同时提供与保险丝管配套之管夹、管座等产品。

After the unrated player chooses a rated player on the ladder and arranges with him/her an Initial Rating Match: a if the unrated player wins 3-0, he/she will receive the rating of the rated player plus 50 points; if wins 3-1 plus 25; if wins 3-2 plus 10; c if the unrated player loses 2-3 he/she will receive a rating 50 points lower then the rated player but not below the rating of the lowest player on the ladder; if 1-3 he/she will receive a rating 100 points lower then the rated player but not below the rating of the lowest player in the ladder; if 0-3 he/she will receive a rating 200 points lower then the rated player but not below the rating of the lowest player in the ladder.

在未积分参赛者从已积分参赛者中选出一人并安排与其进行一场初始排名赛后:(1)如果未积分参赛者以3比0获胜,其将获得对手积分加50分;若以3比1获胜,则获对手积分加25分;若以3比2获胜,则获对手积分加10分;(2)若未积分参赛者以2比3落败,其将获得对手积分减50分,但不低于进阶赛最低参赛者的积分;若以1比3落败,其将获得对手积分减100分,但不低于进阶赛最低参赛者的积分;若以0比3落败,其将获得对手积分减200分,但不低于进阶赛最低参赛者的积分; 27、初始积分赛的结果对于被挑战的已积分参赛者的积分不产生影响。

This product employs overload protection a blows if the fuse indicates an overload or short-circuit situation if the fuse blows unplug the product from the outlet also unplug any additional strings or products that may be attached to the product replace the fuse as per the user servicing instructions (follow product marking for proper fuse rating),and check the product if the replacement fuse blows a short -circuit may be present and the product should be discarded.

该产品带有超载防护设备保险丝断开就表示超载或短路,如果保险丝断开应该将产品从电源上拨出,应该根据使用服务说明更换保险丝(根据产品标签上的保险丝的额定功率)和检查产品,如果替换保险丝后会断开的话,产品可能出现短路,就将产品断开,对于没有替换保险丝的产品,这点可以省略。

The CBRC allows commercial banks to implement the internal rating method by stages, however, when a commercial bank obtains the approval for using the internal rating method, its asset coverage ratio calculated according to the internal rating method (risk-weighted assets calculated according to the internal rating method)/(risk-weighted assets calculated according to the internal rating method + risk-weighted assets of other credit risk exposures calculated according to the revised capital supervisory provisions) shall not be lower than 50%, and it shall formulate the plan for the implementation of internal rating method by stages, so as to ensure that the asset coverage ratio reach 80% in three years.

银监会允许商业银行分阶段实施内部评级法,但在获得许可使用内部评级法时,采用内部评级法的资产覆盖率(按内部评级法计算的风险加权资产/[按内部评级法计算的风险加权资产+按修订后资本监管规定计算的其他信用风险暴露的风险加权资产])应不低于50%,并制定分阶段实施内部评级法规划,以保证3年内资产覆盖率达到80%。

The 352 valid samples were analyzed by SPSS. The results showed there was no distinct corresponding relationship between the product attributes and reaction time. The different key attributes from questionnaire importance rating and the shortest reaction time standards were used to regressively analyze the results of customers' overall rating (such as overall satisfaction,objective quality, recommend intention).The results indicated that the coefficiency of regression of the special attributes chosen from reaction time to overall rating was distinct, while the coefficiency of the special attributes chosen from importance rating to overall rating was not. The main conclusions are: 1. Regarded attributes can be obtained by the reaction time of brand performance rating.

本实验的有效样本为352个,通过SPSS软件进行分析统计,数据统计结果显示,在品牌表现评价反应时与其重要性问卷评定结果的相关系数的检验中,并未发现品牌表现评价反应时与品牌属性重要性评定结果之间的显著相关;将由问卷重要性评价最高标准所得到的关键属性与通过品牌表现评价反应时最短的标准所选取的关键属性的品牌表现分别对消费者的总体评价结果(如&总体满意度&、&主观质量&、&推荐意向&)进行回归分析,发现通过品牌表现评价反应时方法选取的特殊关键属性(与问卷重要性评定法选取不一致的关键属性)的品牌表现对总体评价结果的回归系数显著,而重要性评定问卷法选取的特殊关键属性(与品牌表现评价反应时法选取的不一致的关键属性)的品牌表现对总体评价结果回归系数不显著。

Lead Ph Basic load rating Permissible load F P Nut mass Shaft mass Dynamic rating Ca Static rating C 0 a mm kN kN kN kg kg/m 4 4.2 7.6 0.13 0.8 Type using standard material Standard grease Standard seal Iron-based AFB-LF RR...Lead Ph Basic load rating Permissible load F P Nut mass Shaft mass Dynamic rating Ca Static rating C 0 a mm kN kN kN kg kg/m 2 1.5 2.9 0.045 0.47 Type using standard material Standard grease Standard seal Iron-based AFB-LF RR...

载荷钢球圈列数 DN值预压预压方法导轨型号 3列 1.00圈 70000 无无滚珠丝杠轴加工方式球保持器轴的花键部分中空轴轴承支撑座固定侧的推荐方式精密无无无 EK4, FK4 轴承支撑座支撑侧的推荐方式螺母种类螺纹方向间隔钢球轴方向刚性无单一螺帽右螺纹无 35.0 螺纹条数防尘措施防尘罩形式 W清洁环与QZ润滑装置配用 1 无。。。

In automobile electrical check process,frequently can meet exchanges the situation which the new fuse blows a fuse immediately,moreover these breakdowns processing and the inspection quite are generally complex,The automobile services and drives the personnel frequently to be unable to inspect,The partial personnel even use replace a larger capacity fuse to replace,Has created a bigger harm,Serious also can create the fire equipollent major accident,This article from inserts the fuse is the fuse principle analysis obtains,Key introduction overhaul method and method,Thus is faster accurately looks up the breakdown reason and the spot.

在汽车电路检查过程中,经常会遇到换上新的保险丝立即熔断的情况,而此类故障的处理与检查往往比较复杂,汽车维修与驾驶人员常常无从入手,有的甚至采用更换更大容量的保险丝代替,造成了更大的电器损害,严重的还会造成火灾等重大事故。本文从插保险丝即熔断的原理分析入手,重点介绍检修的方法和手段,以便更快速更准确地查到故障原因和部位。

Use only the specified fuse When replacing the fuse, be sure to use only a fuse of the same rating.

只使用指定的保险丝更换保险丝时,请务必使用相同规格的保险丝。

Compared the calculated curve and the real assay curve we can make a conclusion that: this method can calculate the melting time of the fuse at the huge short current (more than 50 times of the current rating) with the error less than 5%; the resistor and time characteristic can also be acquired, it provided the date for overvoltage calculation of the fuse model. The research of the overvoltage during fusing process is based on short circuit test of the fuse.

由计算结果与实际试验曲线对比可得:该种方法能够比较准确地计算出较大短路电流下(熔断器额定电流的50倍以上)熔断器的弧前时间,误差一般在5%以内;同时还可以算得熔断器在弧前的电阻时间特性,为开断过电压仿真计算电路中的熔断器模型提供数据。

Risk control is always the first, which is reflected in the final months of our tickets for the assessment and selection, in addition to other credit rating agencies for information on the bond credit risk rating, Soochow Fund will be in accordance with their own independent development of the bond credit risk rating system To determine the ultimate goal of the bond credit rating.

风险控制始终是第一个,这是在为我们的评估和选择车票的最后几个月反映除了其他信用评级机构,就债券信用风险评级信息,东吴基金将根据自己的独立发展债券信用风险评级制度来确定债券信用评级的最终目标。

第1/162页 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Blow My Fuse
Cities
Azonto
Antenna
I've Got Better Things To Do Tonight Than Die
Become The Fuse
No Home Training
The Fuse
Rock 'N' Roll Hoochie Koo
No One Like U
推荐网络例句

As of Tuesday, Google's results were still censored in China.

截至周二,谷歌的搜索结果仍受中国审查。

In order to make the positive action increase and negative one decrease, the sub-forces of the social factors must be adjusted to form a centripetal force.

在这一过程中,人的主体性发挥是社会有机体健康发展的灵魂。

Objective To investigate the relationship between the telomer ase activity and apoptosis in gastric cancer.

目的为了探讨胃癌组织中端粒酶与细胞凋亡的关系。