英语人>网络例句>fullface 相关的网络例句
fullface相关的网络例句

查询词典 fullface

与 fullface 相关的网络例句 [注:此内容来源于网络,仅供参考]

This fullface curtain grouting has significance to similar project.

全断面帷幕注浆技术对类似工程具有一定的借鉴与指导意义。

Finally, the fullface curtain grouting plan and measure was successfully applied in the design and construction in the right line of the Qingdao Jiaozhou Bay subsea tunnel for passing through the No.

最后采用全断面帷幕注浆技术方案和措施在青岛胶州湾海底隧道右线主洞穿越F4-4断层的设计和施工中得到了成功的应用。

Originally eachone is soft and fair skin young Bai, made the entire face is shy, fullface youth sickness smallpox.

本来个个是细皮嫩肉的小白,弄得全一脸羞涩,满脸青春病痘。

The key of maintaining the tunnel stability lies on how to deal with the advance core soil ahead of working face, which is obtained on basis of analysis on the problems in high speed railway tunnels with big crosssections in soft surrounding rock or soil. Fullface prereinforcing method by fiberglass bolts can enhance the equivalent rigidity of the advance core soil and control the deformation of the advance core soil, so that arch effect can play its role naturally and assure the excavation safety.

总结分析了目前高速铁路大断面软弱围岩或土质隧道施工中存在的问题,认为如何处理好掌子面前方的"待挖核心体"是控制此类隧道整体稳定性的关键,运用沿隧道纵向全断面预加固的易切削玻璃纤维锚杆来提高"待挖核心体"的等效刚度,控制"待挖核心体"的变形,使得隧道周边的拱效应能自然发挥作用,可以保证隧道能够全断面安全、顺利开挖掘进。

The fullface curtain grouting technical parameters was determined by onsite test.The main tunnel area grouting reinforcement was 5?m away from the tunnelexcavation contour lines.

基于这种情况,通过现场试验确定了全断面帷幕注浆技术参数,主隧道注浆加固区范围为隧道开挖轮廓线外5?

The key of maintaining the tunnel stability lies on how to deal with the advance core soil ahead of working face, which is obtained on basis of analysis on the problems in high speed railway tunnels with big crosssections in soft surrounding rock or soil. Fullface prereinforcing method by fiberglass bolts can enhance the equivalent rigidity of the advance core soil and control the deformation of the advance core soil, so that arch effect can play its role naturally and assure the excavation safety.

总结分析了目前高速铁路大断面软弱围岩或土质隧道施工中存在的问题,认为如何处理好掌子面前方的&待挖核心体&是控制此类隧道整体稳定性的关键,运用沿隧道纵向全断面预加固的易切削玻璃纤维锚杆来提高&待挖核心体&的等效刚度,控制&待挖核心体&的变形,使得隧道周边的拱效应能自然发挥作用,可以保证隧道能够全断面安全、顺利开挖掘进。

推荐网络例句

According to the clear water experiment, aeration performance of the new equipment is good with high total oxygen transfer coefficient and oxygen utilization ratio.

曝气设备的动力效率在叶轮转速为120rpm~150rpm时取得最大值,此时氧利用率和充氧能力也具有较高值。

The environmental stability of that world - including its crushing pressures and icy darkness - means that some of its most famous inhabitants have survived for eons as evolutionary throwbacks, their bodies undergoing little change.

稳定的海底环境─包括能把人压扁的压力和冰冷的黑暗─意谓海底某些最知名的栖居生物已以演化返祖的样态活了万世,形体几无变化。

When I was in school, the rabbi explained everythingin the Bible two different ways.

当我上学的时候,老师解释《圣经》用两种不同的方法。