查询词典 foundation
- 与 foundation 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Then the pile-soil stress characteristics and stabilizing mechanism of the composite foundation are fully discussed. Based on the close analysis of the influence factors of the vertical bearing capacity, circular aperture extension theory is employed to establish the computing formulas for the pile vertical stress and the foundation vertical bearing capacity, respectively. Moreover, with analyzing the features of the calculation parameters such as materials of gunite mortar, jet pressure, diameter of the jet pipe, pile length, pile layout, a design theory for chemical churning pile composite foundation is proposed. Then, the variation of the pipe deformation with loads, the deformation coordination of pile and soil are studied. And methods to decide pile-soil stress ratio and the compressive modulus are developed. Meanwhile, the corresponding design method and the design parameters are proposed. In addition, studies for construction technique and quality detection of the chemical churning pile composite foundation are presented.
在此基础上深入探讨了旋喷桩的桩土受力特性及其复合地基的加固机理,从影响旋喷桩复合地基竖向承载力的因素入手,基于圆孔扩张理论给出了桩体竖向应力及旋喷桩复合地基的竖向承载力计算公式;通过对喷射浆液、喷射压力选取、喷射直径估算、桩长及桩位设计等各种计算参数的深入分析和研究,提出了一套相应的旋喷桩复合地基设计计算方法;通过计算分析,深入探讨了旋喷桩复合地基变形随荷载变化规律、桩和桩间土变形协调关系、桩土应力比及复合地基压缩模量的确定,并提出相应的设计方法和修正参数;此外,结合工程应用,对旋喷桩复合地基的施工技术及其现场质量检测方法进行了较全面的探讨。
-
Problems of single footing are classifying about results、determination of dimension of combinational column on combinational foundation、determination of bending moment on superface of combinational foundation and determination of partly press area when there is angel between column and foundation; the problems of strip foundation are determination of torsional moment on some section in checking torsion resist.
独立基础中的问题主要是基础计算结果的归并、双柱合并基础合柱尺寸的确定、双柱合并基础顶面弯矩的求法及柱相对基础有转角时局部受压计算底面积的确定;柱下条形基础的问题是抗扭验算中总扭矩不为0情况下截面扭矩的确定。
-
At many case of bank foundation, such as the case of upper strongness and lower weakness, strong permeable foundation of dyke, strong permeable foundation of dyke containing low penetrability soft intercalation and the dyke foundation by alternation of low and strong penetrability layer, the appropriate condition of various upright seepage prevention measure (whole cut-off wall, half cut-off wall and hanging cut-off wall) and the optimization of seepage prevention measure are analyzed.
从渗流基本理论出发,以压力水头为基本未知量推导多孔介质三维饱和—非饱和、稳定—非稳定渗流问题的微分方程以及方程的有限元格式;在饱和非饱和渗流场的有限元分析中,不仅考虑了饱和区的水体渗流情况,而且也考虑了非饱和区的水分运动情况,将饱和渗流场与非饱和渗流场统一起来进行研究,整个渗流场采用一个支配方程。
-
In the later half of the article, we adopt random analysis method to make preliminary study to the backfilled foundation and then analysis random influence factors that effect the settlement degree of gantry crane foundation. We used JC method to study the reliability of the settlement and Non-Uniform settlement degree of gantry crane foundation based on factors which influence the last settlement degree of railway foundation, and the same time, we utilized backfill construction parameter and the actual statistics data of earth backfilled on site.
本文后半部分,应用随机分析方法对该回填基础进行了初步的研究,分析了影响高架门机基础沉降量的随机影响因素,确定了沉降分析的计算模型,结合影响轨道基础最终沉降量的多种因素,利用施工现场实测回填土土性数值和回填施工参数,对高架门机基础沉降量和不均匀沉降进行了可靠性评价。
-
The procedure is applied in two projects:(1) Shanghai Huanqiu finance center tower foundation pit dewatering, the complicated flow state of groundwater is simulated under these conditions which the aquifers deposite layer by layer, the bottom of the aquifers goes deep to 149m, the horizontal flow barrier goes deep to 34m, the extraction wells are penetrated to 55m, the filters of the extraction wells are located between 34m to 55m, and the water level in the deep foundation pit is decreased to 26m under land surface, the result of 8 pumping wells optimization project is designed.(2) The forth subway of Dong Jia-du tunnel repair foundation pit dewatering in Shanghai, the complicated flow state of groundwater is simulated under these conditions which the aquifers deposite layer by layer, the bottom of the aquifers goes deep to 144.45m, the horizontal flow barrier goes deep to 65m, the extraction wells are penetrated to 60m, the filters of the extraction wells are located between 45m to 60m, and the water level in the deep foundation pit is decreased to 42.45m under land surface, then an optimization project is designed.
最后将成果分别应用于两个工程实例中:(1)上海环球金融中心塔楼基坑降水,模拟了在多层含水层复合存在、含水层最深底板埋深达149m、基坑周围挡水连续墙埋深达34m、抽水井埋深达55m、抽水井过滤器埋深为34至55m,基坑内地下水位降至埋深达26m的情况下的地下水复杂流动状态,得出了8口抽水井优化降水方案;(2)上海地铁4号线董家渡隧道修复基坑降水,模拟了在多层含水层复合存在、含水层最深底板埋深达144.45m、基坑周围挡水连续墙埋深达65m、抽水井埋深达60m、抽水井过滤器埋深为45至60m,基坑内地下水位降至埋深达42.45m的情况下的地下水复杂流动状态,确定出了最优降水方案。
-
By means of Pile Foundation SoftWare , design project about foundation of the common piles which often used in Changchun zone and the ramming-reamed pile , analyze and compare with these the projects so as to educe data and charts of the different foundation project and simulate the three-space drawing designed about pile foundation in construction.
通过桩基础设计软件,对长春地区常用桩型和夯扩桩进行基础方案设计,并综合优化分析比较、同时得出不同基础方案下的综合对比分析数据及图表,并模拟实际施工中的桩基三维立体设计图。
-
Based on the stress mechanism with composite foundation and rigid foundation,and the accuracy grade of pile positioning,the author believes that the existing technical standards for pile displacement in soil-cement mixed pile foundation are unreasonably rigorous.
基于复合地基和刚性桩基的受力机理、桩的定位精度分析,认为规范中对水泥土搅拌桩地基的桩偏位规定过于苛刻,参照混凝土灌注桩及其他复合地基桩偏位规定,提出对水泥土搅拌桩偏位作适当修正。
-
In this paper, with polygon line hypothesis of τ-u relationship of horizontal restrained condition of foundation, and winker hypothesis of vertical restrained condition of foundation, a new analytical method to calculate thermal stress of mass concrete structure on foundation with biconditional restriction is presented.
1概 述在现有的地基上砼板温度应力的计算方法中,多考虑地基的单向非刚性约束及假定板全截面均匀受力进行有关的推导与分析。
-
Analyze the characteristics of in general use loading terrace that the 3G core net establishes each usage adequately during the period of designing, from can analyze it to be applicable to with the sexual angle high the heat canned use sex control put to pull out foundation, correspond by letter foundation and break down examination and control foundation, and look for from the theories to high can use support of with sex design.
在设计过程中,充分地分析3G核心网设备使用的通用承载平台的特点,从可用性的角度分析其适用于高可用性控制的热插拔基础、通信基础、故障检测与控制基础,并从理论上寻求对高可用性设计的支持。
-
The result showed by interviewing these persons: 1 There is the same goal between the department of corporate public relations and the corporate foundation, but carry into effect by the different orientation. 2 The sponsorship of art and culture is the fusion of marketing and public relations, and become" Marketing Public Relations". 3 The relation between the foundation and the group of art and culture changes the direction to the" cooperation", but the" sponsorship". 4 The operators of the enterprise should ponder the ability of the enterprise, from the personnel specialized degree, the enterprise resources and the adjustment of stakeholders, to decide whether it should set up the corporate foundation to sponsor art and culture or not.
研究结果显示,企业公关部门与企业基金会所能达成的企业目的相同,却是透过不同的方向去进行:企业公关部门偏向营利观点,而企业基金会则扮演非营利形象的角色,透过赞助艺文的方式,与公共关系部门形成相辅相承的的互补关系;在企业基金会的艺文赞助行为上乃是融合行销与公关的概念,形成企业「行销公关」的一环;另外在艺文团体与企业基金会的关系上,是走向双向「互助合作」,而非单向的「赞助」关系;最后,企业经营者应衡量企业的能力,从人员专业程度、企业资源及调整企业内外群众关系的能力来决定是否应设立企业基金会从事艺文赞助行为。
- 相关中文对照歌词
- One Foundation
- This House
- Foundation
- Firm Foundation
- Broken Foundation
- Working On The Building
- Holding On
- Foundation
- Vacancy
- Haunted House
- 推荐网络例句
-
More direct, directer ; most direct, directest
径直的,笔直的
-
Do you know how to use a chain saw?
你知道如何使用链锯吗?
-
This is close to the cost of the purchase price.
这样的收购价已接近成本。