查询词典 forward-biased
- 与 forward-biased 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The provisions of the zone system, there are still a problem: If you travel around the world from west to east, across every time zone, we will forward your table set aside for an hour, so that when you are 24 time zones across the back place, you just forward of the table also allocated 24 hours, which is the same the second day of a part-time; the contrary, when you travel around the world from east to west after lap, your table is indicative of the same day before the part-time .
规定了区时系统,还存在一个问题:假如你由西向东周游世界,每跨越一个时区,就会把你的表向前拨一个小时,这样当你跨越24个时区回到原地后,你的表也刚好向前拨了24小时,也就是第二天的同一钟点了;相反,当你由东向西周游世界一圈后,你的表指示的就是前一天的同一钟点。
-
5 Forward Press once, forward once, rapidly forwarding to long-on
3.2.5 前进按一次,前进一次,长按可以快速前进
-
The simulations for the obtaining result in Ku wave band show that the size of the pricipal target affects greatly both the forward sactter and the backward scatter. The influence of the targets around shows definite periodicity. The second scatter field minishes with the increase of distance between two targets. The more near the forward area the rounding target is, the bigger its affect is.
结果表明:本目标的尺寸对前向散射和后向散射均有较大的影响,周围目标的影响呈现出一定的周期性,二次散射随着目标间距的增大而减小,周围目标离前向散射方向越近,对前向散射的影响也越大。
-
Power Measurement is a mapping of a group to continue moving forward the cause of a true portrayal, but also mapping the field of flags and a model of learning, we can live from those who are familiar with the comrades in arms forward to gain more strength.
国测一大队既是测绘事业不断前进的真实写照,也是测绘领域学习的旗帜和楷模,我们可以从这些鲜活熟悉的战友身上汲取更多的前进力量。
-
The realized conditions of the construction industry supply chain synergy are put forward through the analysis of the construction industry vertical supply chain synergy using the method of evolutionary game (taking the construction suppliers and the general contractors for example). With the horizontal coordination problems in the construction market put forward, the synergetic mechanisms among the government, industry associations, market players and the rules of the market in the construction market are analyzed. The existed technology-economic system coordinated model is improved and the synergetic degree model of construction industry system itself is set up. The conclusion is drawn that the economic benefit indicators and technology indicators of Chinese construction industry system synergy low and the two must be synergized through the analysis of the synergetic degree of the economic benefit indicators and technology indicators of the construction industry system.
5对建筑业纵向供应链协同(以建筑供应商和总承包商为例)进行了演化博弈分析,提出了建筑业供应链协同的实现条件;分析了建筑市场中政府、行业协会、市场主体、市场规则之间的协同机制;对已有的科技——经济系统协调模型进行改进,形成了建筑业系统本身的协同度模型,并对建筑业系统的经济效益和科技指标的协同度进行分析,得出我国目前建筑业系统的经济效益指标和科技指标的协同度低,必须协同二者之间的关系。
-
So the new protocol achieves key independence, and it provides perfect forward secrecy, KGC-forward secrecy and resistance to passive and active attacks as well.
同时新协议满足完善的前向安全性、主密钥前向安全性,以及抗主动和被动攻击等安全性。
-
This paper analyzes the quality supervision process of soft foundation construction renovation by way of an engineering example, and give many kinds of renovation measures and their supervision content and supervision gistThis paper brings forward a proposition that highway engineering quality supervision must be strengthened and attached importance to design supervision Aiming at the design question at present, this paper gives the content, procedure and method of design supervision, and purs forward some propositions in allusion to the question of design supervision at primary stage.
提出了公路工程质量监理必须加强和重视设计阶段监理的建议,针对目前工程设计中出现的问题,给出了设计监理的内容、方法和程序。
-
The chapter four to chapter eight analyze the railway engineering cost making standard from the sides respectively including railway engineering quotation, railway quotation direct cost, site administration cost, construction measurement cost, indirect cost and profit, analyze the key factor which influencing cost, confirm the scientificity and rationality of the current cost making standard basing on field measuring data, bring forward the advise of the ways and method of reducing invest and cost, and bring forward the opinion and advice for improve and perfect the current railway cost making standard.
第4~8章分别从铁路工程定额、铁路定额直接费、现场管理费、施工措施费、间接费和利润等方面对铁路工程造价计价标准进行分析,分析影响费用的关键因素,依靠实测数据检验现行各项计价标准的科学性与合理性,提出降低投入、减少成本支出的途径和方法的建议,并对现行铁路计价标准提出改进和完善的意见和建议。
-
Through the technological calculation of the wind wheel and the analysis of the exerted force, stress and metal flowing status when drawing forward and backward, the forward and backward compound drawing die was designed and improved in its structure, which ensured the requirement of the part dimensions and eliminated some defects such as the material thickness becoming thinner.
通过对风轮本体的工艺计算及正反拉伸复合时的受力、应力及金属流动状态进行分析,设计并改进了正反拉伸复合模的结构,保证了零件尺寸要求,消除了料厚变薄等缺
-
When the snow first began blooming plum branches, we want to harvest the spring and winter collections, so we look forward to the spring; look forward to Man swallows fly; look willow fly.
当飞雪中第一枝梅花开始绽放的时候,我们收获了春的希望和冬的珍藏,于是我们期待春暖花开;期待漫飞的燕子;期待杨柳飞花。
- 相关中文对照歌词
- Flying Forward
- Moving Forward
- Run Forward
- Move Forward
- Face Forward
- The Forward
- Victory! (Come Forward)
- Living In Fast Forward
- Closed Eyes Still Look Forward
- Looking Forward
- 推荐网络例句
-
And Pharaoh spoke to Joseph, saying, Your father and your brothers have come to you.
47:5 法老对约瑟说,你父亲和你弟兄们到你这里来了。
-
Additionally, the approximate flattening of surface strip using lines linking midpoints on perpendicular lines between geodesic curves and the unconditional extreme value method are discussed.
提出了用测地线方程、曲面上两点间短程线来计算膜结构曲面测地线的方法,同时,采用测地线间垂线的中点连线和用无约束极值法进行空间条状曲面近似展开的分析。
-
Hey Big Raven, The individual lies dont matter anymore - its ALL a tissue of lies in support of...
嘿大乌鸦,个别谎言的事不要再-其所有的组织的谎言,在支持。