英语人>网络例句>forward bridge 相关的网络例句
forward bridge相关的网络例句

查询词典 forward bridge

与 forward bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]

It is understood that the Yangtze River Bridge have been completed with the opening of the Yangtze River Bridge, Sanqiao different, it is the main span of Nanjing, the first 1418 meters of the twin towers three-span suspension bridge, looks like a well-known San Francisco Golden Gate Bridge, but the main span longer than the Golden Gate Bridge more than one hundred and thirty meters.

据了解,长江四桥与已建成通车的长江二桥、三桥不同,它是南京第一座主跨1418米的双塔三跨悬索桥,外观类似著名的美国旧金山的金门大桥,但主跨比金门大桥还要长130多米。

In this paper, basted on the sum-up and investigation of simulation calculation of long-span bridge construction in nation and international, the detailed approach of imitated calculation of long-span CFST arch bridge is given out, and the reason why the general backward analysis is not suitable for the application of the rib-hoisting of CFST arch bridge is analyzed. And an applied method for forward analysis based on iterative theory is put forward.

本论文通过对国内外桥梁施工仿真计算成果的总结和研究,给出了大跨度钢管混凝土拱桥仿真计算的具体步骤,分析了一般的倒退仿真计算方法不适合应用于钢管混凝土拱桥吊装的原因,并为此提出了基于迭代理论的前进分析实用方法。

The main viewpoints and model of developing countries MNEs include FDI development cycle put forward by Dunning, the theory of small scale technology put forward by Wells, the theory of localised technological change put forward by Lall, the theory of technological accumulation and industrial upgrade put forward by Tolentino, the model of dynamic comparative advantagr impelling put forward by Aggarwal and Agmon, the model of dynamic competition tactic in technological accumulation put forward by Xian guo-ming and Yang rui.

相对于发达国家工业化早期,发展中国家企业技术能力积累和企业家能力提高具有两方面的有利之处:一是使这种积累和提高由自发过程变为主动过程;二是可以通过政府政策支持对国外相关技术、知识和技能的引进,以及创造更多经济机会和对企业家职能的部分替代或支持,加快企业上述能力积累和提高的过程。

When making design with bridge configuration, bridge deck overlay which was only treated as the appendant of bridge, currently not make special calculate and analyze about it, at the same time, current codes also just give directed account for method、material and thickness of deck pavements, there havent any design theory and index to dependent, so it is necessary to do some systemic study about concrete bridge deck overlay and make certain about the stress and distortion characteristic of the deck pavements.

桥面铺装作为特殊的路面结构,它起着保护桥梁和承担路面功能的作用。但是目前,在进行桥梁结构设计时,桥面铺装层只是作为桥梁工程的附属结构,一般不作专门的计算分析,现行规范也只是对桥面铺装的做法、材料、厚度做了指导性的说明,至今没有可以依据的设计理论和指标,因此有必要对桥面铺装展开系统的研究,明确铺装层结构的受力和变形特点。

To clear the stress relations between bridge decks and the steel tube truss stiffening girder of Zhongxian Yangtze River Bridge, this paper establishes two kinds space analysis model for this bridge, namely: the interaction model of the bridge decks work with the stiffening girder together and the traditional model not work with the stiffening beam.

为了明确忠县长江大桥桥面板与钢管桁架加劲梁的受力关系,本文建立了两种空间分析计算模型,即;桥面系参与加劲梁受力的共同作用模型和不参与加劲梁受力的传统模型。

When train bridge can cause the bridge vibration, the bridge vibration in turn also can affect the vehicles the vibration, namely forms the vehicle bridge coupled oscillation question.

列车过桥时会引起桥梁的振动,桥梁的振动反过来也会影响车辆的振动,即形成车桥耦合振动问题。

Raises comprehensively along with our country railroad passengers and cargo vehicle fast, in order to effective to already has the bridge operation condition to carry on the appraisal by, and to newly built, the reconstruction bridge carries on the optimized design, must carry on the analysis to time the train bridge vehicle bridge coupled oscillation question.

随着我国铁路客货车的全面提速,为了有效的对既有桥梁运营状态进行评估以,及对新建、改建桥梁进行优化设计,均需对列车过桥时的车桥耦合振动问题进行分析。

The structure parameter influences on lateral stability, such as crankle rigidity ratio of arch rib, arch axis coefficient, arch high span ratio, lateral rigidity of bridge decking and arch rib ratio, the effect of non-orientedly conservative loadings of bridge deck, lateral wind loadings were discussed. Corresponding numerical charts were given, and they may be of some reference value and helpful to the parameter design of ribbed arches.2. In this paper, the example bridge is a long-span half-through CFST arch bridge of a 100m span in Yi Lan.

分析了拱肋的抗扭刚度与横向抗弯刚度比、拱轴系数、矢跨比、桥面系的横向抗弯刚度与拱肋的横向抗弯刚度比、桥面系横向刚度引起的非保向力效应、横向风荷载对单肋拱横向稳定的影响,并给出了相应的图表,为拱桥设计时拱肋的结构参数的选取提供一定的依据。

It is showed in wind-vehicle-bridge system vibration analysis that cross wind action can remarkably increase the response of bridge and vehicle. Generally, the response of bridge and vehicle are increased with wind speed and train speed, one case that vehicle is on leeward side of deck is more unsafe than another case that vehicle is on windward side of deck. Nonlinear factors can more influence bridge than vehicle.

风—车—桥系统耦合振动分析结果表明:考虑风的作用会显著增加车辆和桥梁的响应;车辆和桥梁的响应总体上随风速和车速的提高而变大;车辆位于桥道背风侧时较迎风侧时更为不利;非线性因素对桥梁的影响较车辆的要大。

The bridge design theory based on the life cycle cost refers to, in the beginning of bridge design, the innovative design approach to ensure an optimized bridge life cycle cost on the basis of a secure operation of bridge.

所谓桥梁的全寿命周期成本设计理论,即指在桥梁结构设计之初,在保证桥梁服务寿命内安全运营的前提下,确保其寿命周期成本最优化的一种全新设计方法。

第4/500页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Forward
Forward Motion
Moving Forward
London Bridge Is Falling Down
Forward To Love
Moving Forward
Moving Forward
African Pride
Friday
Friday
推荐网络例句

But this is impossible, as long as it is engaging in a market economy, there are risks in any operation.

但是,这是不可能的,只要是搞市场经济,是有风险的任何行动。

We're on the same wavelength.

我们是同道中人。

The temperature is usually between 300 and 675 degrees Celsius.

温度通常在摄氏300度到675度之间。