英语人>网络例句>fore-tooth 相关的网络例句
fore-tooth相关的网络例句

查询词典 fore-tooth

与 fore-tooth 相关的网络例句 [注:此内容来源于网络,仅供参考]

Use: Disassembly carriage wheel fore-end control arm ball section and knuckle, the upper arm ball section and knuckle, undertake the pressing down on of arm ball section and knuckle, transverse direction lower arm ball section and knuckle, get lost horizontal stroke pull rod end ball section and knuckle, carriage wheel fore-end control arm ball section and knuckle come off come untied.

用途:拆卸车轮前端控制臂球节与转向节、上臂球节与转向节、承压下臂球节与转向节、横向下臂球节与转向节、转向横拉杆端球节与转向节、车轮前端控制臂球节与转向节的脱开。

Masts and Gears 桅杆及装置 Fore Mast 首桅 A fore mast of welded steel construction, stayless D-section type, to be provided on the forecastle deck aft as shown on the G.A.

如总布置图所示,在艏楼甲板的后侧安装有1只焊接钢结构式首桅,首桅为D型剖面无支索式,在其上安装有航行灯,探照灯,汽笛,直梯和踏步。

The above-mentioned problem is not only related to the harbor waterway, the fore-dock depth, the amount and performance of the fore-dock machine, the process and efficiency of loading and discharging as well as the ingathering and outputting system, multi-transportation management and the policy of the port etc.

这一问题不仅涉及港口航道和码头前沿水深、码头前沿机械设备数量和性能、装卸工艺和效率,还关系到与集装箱港口相匹配的集疏运条件、多式联运组织管理和港口的政策环境等诸多问题。

That hill to the nor'ard they calls the Fore-mast Hill; there are three hills in a row running south'ard - fore, main, and mizzen, sir.

北边的那座小山他们叫做'前桅山';从那儿向南看,并列的是三座山——前桅、主桅和后桅,阁下。

Face this kind of situation, the author thinks not to answer to the control that funds overspends from production very busy season just begins, and should be when plan of funds of year of make known to lower levels of management department of superior of the beginning of the year, build a rigorous plan management and budgetary management system, combine the characteristic of highway conserve branch, act on the principle of keep expenditures within the limits of income, making overall plans and take all factors into consideration, year funds the plan presses different content, with the work out estimated method, below the analysis, premise that forecast, undertake index is decomposed, layer upon layer fulfil, fore-and-aft decompose team and group, each accessary production unit, transverse fulfil each room, departmental door, implement pyramid form manage by different levels, make every every branch, worker has index, responsible, form fore-and-aft after all, transverse control a network to stagger of edge, freely.

面对这种局面,笔者认为对经费超支的控制不应从生产大忙季节才开始,而应在年初上级治理部门下达年度经费计划时,就建立起一套严格的计划治理和预算治理制度,结合公路养护部门的特点,本着量入为出、统筹兼顾的原则,将年度经费计划按不同内容,用编制预算的方法,在分析、猜测的前提下,进行指标分解、层层落实,纵向分解到班组、各附属生产单位,横向落实到各股室、各部门,实行金字塔形的分级治理,使每个部门、每个职工都有指标、有责任,形成一个纵向到底、横向到边、纵横交错的控制网络。

When the temperature is below 0℃, in nascent period of cyclone, it is showed there are fine water vapor conditions anywhere in cyclone. In developing period of cyclone, there are fine water vapor conditions at the fore of cold and warm fronts. After cyclone occlude, there are only fine water vapor conditions at fore warm front and cyclone center.

分析表明,在气旋初生期,气旋各部位的冷层都有较好的水汽条件;在气旋发展旺盛时,冷锋前和暖锋前的冷层水汽条件较好;在气旋锢囚后,只有暖锋前的冷层和气旋中心水汽较多。

In the fore-court, lit by the dim rays of a horn lantern, some eight or ten little fieldmice stood in a semicircle, red worsted comforters round their throats, their fore-paws thrust deep into their pockets, their feet jigging for warmth.

前庭里,在一盏牛角灯笼的幽光照耀下,八只或十只小田鼠排成半圆形站着,每人脖子上围着红色羊毛长围巾,前爪深深插进衣袋,脚丫子轻轻跺着地面保暖。

Emergency fire pump room locates at fore part, fore peak to be used as ballast tank.

首部设有应急消防泵舱,首尖舱为压载舱。

The fore bay of Heihe Longhui Hydropower Station designed by the company, is the existing biggest tunnel fore bay in China, which is height of 21m, width of 16m; for the large-span dome of surge tank of Baishuijiang Shiji Hydropower Station, which is the first project equipped with rapid-drop gate in surge tank in Gansu Province, the company adopted pre-stressed anchor cable to complete the dome's excavation and supporting at the same time, thus reduced the completion period and investment; for the diversion tunnel of Fuchuan Hydropower Station, which is the biggest non-pressure diversion tunnel in Gansu Province, with span of 9m, height of 11m, the company adopted half-tunnel supporting structure, thus reduced the project investment.

黑河龙汇水电站前池是目前国内最大的洞内式前池,跨度16m、高度21m;白水江石鸡水电站调压井大跨度穹顶采用预应力锚索技术,分瓣开挖一次支护完成,节省了工期和造价,同时是省内第一座在调压井内设置快速闸门的工程;福川水电站引水隧洞是甘肃省内最大的无压引水隧洞,跨度9.0m,高度11m,采用半洞支护结构,在满足安全的前提下节省了工程投资。

The gravity revetment structure of inland waterway was optimized by enlarging the fore- toe of bottom slab, increasing the cantilever length of the back heel, reducing the thickness of bottom slab, deepening the depth of fore- toe, improving the reverse filter and setting block stone.

通过加大底板前趾、后踵悬臂长度,减薄底板厚度,加深前趾深度,改进倒滤棱体,增设摆石等措施,使内河航道重力式护岸结构得到了优化。

第2/59页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
'Fore She Was Mama
Act Fore (The End?)
推荐网络例句

This one mode pays close attention to network credence foundation of the businessman very much.

这一模式非常关注商人的网络信用基础。

Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.

扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。

There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.

双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。