查询词典 force-fed
- 与 force-fed 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The structure is under aerodynamic force, mass force and elastic force, the amplitude of which is increasing on and on.
结构在气动力、惯性力和弹性力耦合作用下,出现的幅度不断增加的振动现象。
-
The present paper mainly pressurizes take the auto-adapted machinery in endogenic force the installment to carry on F=-1 as the object ten poles endogenic force to pressurize the installment to allow the movement chain is comprehensive, understood the endogenic force pressurizes the auto-adapted mechanism concept and the related characteristic, discovers the endogenic force to pressurize the auto-adapted mechanism movement chain degree of freedom characteristic.
本论文主要以自适应机械中的内力加压装置为对象进行F=-1的十杆内力加压装置的容许运动链综合,了解内力加压自适应机械装置的概念及有关特性,找出内力加压自适应机械装置运动链的自由度特性。
-
1 "Force majeure events" refer to objective situations that cannot be foreseen and avoided, such as natural disasters, government behaviors, and abnormal phenomena of the society. If one party can not fulfill the obligation of the contract due to force majeure events, it should notify the other partyin fifteen days after the come-out of the event. The two parties should try their best to reduce loss. If any force majeure event causes one party's failure or delay in fulfilling its obligation, it is not taken as breaking the contract. The party who claims loss of capability of fulfilling the contractshould take proper measures to reduce as much as possible or eliminate the impact of the force majeure event and try to resume its fulfillment of the obligation as soon as possible.
7.1 &不可抗力事件&指不能预见、无法避免且不能克服的客观情况,如:自然灾害、政府行为,或社会异常现象;若一方因不可抗力事件而不能履行本合同所规定的义务,该方应在不可抗力事件发生后十五天内书面通知另一方,双方应尽其最大可能地减少损失;若发生不可抗力事件,一方无需对因不能履行或损失承担责任,并且此种履行失败、迟延,不得视作对本合同的违约,声称因不可抗力事件丧失履行能力的一方应采取适当措施最大限度减少或消除不可抗力事件的影响,并在尽可能短的时间内尝试恢复履行受不可抗力事件影响的义务。
-
The results show that side force, lift and overturning moment obtained by simulation and by wind tunnel test are consistent. When train travels with certain speed, the aerodynamic force and overturning moment acting on passenger car running on bridge, embankment and flat will increase greatly as cross-wind becomes larger while those increase less when the train runs on cut. Under the condition of strong cross-wind, aerodynamic force and overturning moment acting on train traveling on bridge are the largest. So the train traveling on bridge tends to overturn compared with that traveling on other three kinds of railway conditions. Aerodynamic force and moment acting on train traveling on cut are the least.
研究结果表明:侧向力、升力和倾覆力矩数值模拟结果与风洞实验结果均吻合较好;车速一定时,随着侧风速度的增大,列车在桥梁、路堤、平地上运行所受气动力和倾覆力矩均急剧增加,而在路堑上运行所受气动力及力矩增加缓慢;当侧风速度一定的情况下,客车在高桥上运行所受到的气动力及力矩最大,因此,强侧风下列车在高桥上运行较容易发生倾覆事故;在路堑上所受到的气动力相对最小。
-
To overcome the existing deficiency in force feedback dataglove, such as poor security, insufficiency of force for feedback, and so on, a passive force actuator based on magnetorheological fluid for force feedback dataglove is presented.
为了克服目前力反馈数据手套存在的安全性差、力再现范围小等不足,提出了一种磁流变液被动力觉驱动器实现方法。
-
For example, before the slice force curve each step of cylinder is completed, force of inertia,top side gas force,shaft side gas force are required, per curve will possess 36 calculation spots at least.
尤其动力计算中采用非传统的解析法进行往复惯性力、盖侧气体力、轴侧气体力、切向力曲线的绘制使得压缩机切向力曲线的合成变得非常简便,计算过程解决的
-
The calculating results indicate that surrounding rock initial stress has an obvious influence on interior force of invert center, interior force increases with the vertical force increasing in both side of invert center, and decrease with horizontal force increasing in interior side , unchangeable in outer ...
计算结果表明,围岩初始应力场对仰拱受力有明显影响,随着竖向压力的增大,仰拱中心的内、外侧应力均增大;随着水平压力的增大,仰拱中心内侧应力减小、外侧应力基本不变;减小复合衬砌结构中初期支护厚度以及变刚性接头为柔性接头均会改善仰拱受力。
-
Methods To choose 24 adult healthy male SD rats, take the first molar and middle slice tooth of right upper jaw as experimental teeth, divide them into 4 groups: Normal force 3-day group; force with restriction of sleeping 3 -day group; Normal force 7-day group; force with restriction of sleeping 7-day group.
取成年健康雄性SD大鼠24只,采用大鼠右侧上颌第一磨牙和右侧上颌中切牙为实验牙,随机分为4组:正常加力3天组,睡眠限制加力3天组,正常加力7天组,睡眠限制加力7天组。
-
In design of anti-sliding pile, the most foundation and most important problem is how to determine the distribution feature of the interaction force between anti-sliding pile and surrounding rock under pushing force of sliding body, that is the distribution feature of sliding pushing force and remnant resistant sliding force.
在抗滑桩设计中一个最基本、也是最重要的问题是确定抗滑桩在滑坡体推动下,桩身与周围岩土体之间作用力的分布特征,即滑动面以上滑坡推力与剩余抗滑力的分布特征。
-
Then, a hypothesis of "double force source" for tectonism is put forward, its main points are: the tectonism is not only the result from the action of tectonic stress, but also the result from the action of "double force source", namely, the tectonic stress and subsurface fluid force including force produced by precipitation, etc.
提出了&双力源&构造变动假设,即构造变动不仅是构造应力作用的结果,而且是构造应力与地下流体力共同作用的结果;二者共同作用因方式不同而产生不同的构造变动;在构造变动孕育与产生过程中,构造应力的作用是第一位的,地下流体力则是调制性的,只有那些能与构造应力增强过程产生力学耦合的地下流体力,才能调制与诱发出构造变动异常并促进构造变动。
- 相关中文对照歌词
- The Lisa Lisa / Full Force Routine
- Irresistible Force
- Blunt Force Castration
- Can't Force Love (Interlude)
- Force Of Nature
- The Force Behind The Power
- Force Of The Shore
- Bittersweet (A Jedi Force)
- A Force De...
- Force Of Nature
- 推荐网络例句
-
Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".
歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。
-
This is Kate, and that's Erin.
这是凯特,那个是爱朗。
-
Articulate the aims, objectives and key aspects of a strategic business plan.
明确的宗旨,目标和重点战略业务计划。