英语人>网络例句>flood current 相关的网络例句
flood current相关的网络例句

查询词典 flood current

与 flood current 相关的网络例句 [注:此内容来源于网络,仅供参考]

Synthetic Aperture Radar is the more ideal remote sensing tool to survey the range of flood area;SPOT image data is applied to land use classification.It arranges two kinds data and computes the total area and the land use type of flood zone,and excepts to bring humanistic,social and economic data into the flood management system.It can help the operation and development of flood disaster prevention system.

合成孔径雷达为测绘洪水区域范围较为理想可行的遥测工具;而SPOT卫星影像资料则是应用于土地利用分类上,以GIS整合两种资料并计算出洪泛区域之总面积及其土地利用形态,期能将人文、社会及经济等资料纳入洪水管理体系之发展,有助于水利防灾整套系统之运作。

The domestic experts' studies are limited to the qualitative analysis,such as the choice of flood insurance patterns,the establishment of flood insurance systems and so on.But the quantitative analysis,such as the pricing and loss assessment of flood insurance,are very rare.There is no unanimously recognized flood insurance loss assessment model so far.

目前国内专家学者对洪水保险的研究仅局限于洪水保险模式的选择、洪水保险体系的建立、洪水保险制度的建设等定性分析上,而对于洪水保险的定价、损失评估等定量分析则非常少见,还没有一致认可的洪水保险损失评估模型。

Article 41: In floodways, flood channels, flood detention basins and flood storage basins, all land utilization and developments must meet flood control requirements.

第四十一条在防洪河道和滞洪区、蓄洪区内,土地利用和各项建设必须符合防洪的要求。

The time from May to September is the active time of hydrological process, which occupies 85% of annual runoff; the spring flood and summer flood are founded in hydrological process, the peak of summer flood is larger than spring flood.

结果表明5-9月为研究流域的水文过程活跃期,该时段内的径流量占全年总径流量的85%;径流过程中存在春汛和夏汛,夏汛洪峰值明显高于春汛。

The present situation in flood-control and waterlog-drain are analyzed, and the present problems are pointed out.2 The causes and characteristics of the floods in Linyi are summarized, and the flood-control project and the waterlog-drain system in Linyi are also introduced.3 On the basis of summarizing the reconnaissance data of engineering geology, the engineering geology conditions of flood-control projects in the city of Linyi are studied, including the floodway project ,the hinge project, the Ge-Jiu Road Bridge project, the No.327 national highway road bridge project, the E-Huang Road Bridge project, and the Xiaogezhuang's chief inverted siphon project in the project of "Bifurcating the Su River to the Beng River".4 Seepage FEM analyses are carried out on the flood-control projects of Yi River, Beng River and Xiaosu River, respectively.

总结了临沂市洪灾成因及洪水特性,介绍了临沂市城市防洪工程和排涝工程。 3、在综合工程地质勘察资料基础上,分析了临沂市城市防洪工程的工程地质条件,包括:&分涑入祊&分洪道工程地质条件分析、&分涑入祊&枢纽工程地质条件分析、&分涑入祊&葛九公路桥工程地质条件分析、&分涑入祊&327国道公路桥工程地质条件分析、&分涑入祊&鹅黄公路桥工程地质条件分析、&分涑入祊&小葛庄总干倒虹吸工程地质条件分析。

These Thoughts so oppress'd my Mind, that I began to give over my Enterprize, and having haled my Boat into a little Creek on the Shore, I stept out, and sat me down upon a little rising bit of Ground, very pensive and anxious, between Fear and Desire about my Voyage; when as I was musing, I could perceive that the Tide was turn'd, and the Flood come on, upon which my going was for so many Hours impracticable; upon this presently it occurr'd to me, that I should go up to the highest Piece of Ground I could find, and observe, if I could, how the Sets of the Tide, or Currents lay, when the Flood came in, that I might judge whether if I was driven one way out, I might not expect to be driven another way home, with the same Rapidness of the Currents: This Thought was no sooner in my Head, but I cast my Eye upon a little Hill, which sufficiently over-look'd the Sea both ways, and from whence I had a clear view of the Currents, or Sets of the Tide, and which way I was to guide my self in my Return; here I found, that as the Current of the Ebb set out close by the South Point of the Island; so the Current of the Flood set in close by the Shore of the North Side, and that I had nothing to do but to keep to the North of the Island in my Return, and I should do well enough.

我思想压力很大,不得不考虑放弃原定的计划。我把小船拉进沿岸的一条小河里,自己迈步上岸,在一块小小的高地上坐下来沉思。我心情忧郁,心绪不宁。我害怕死,又想前去探个究竟。正当我沉思默想之际,只见潮流起了变化,潮水开始上涨。这样,我一时肯定走不成了。这时,我忽然想到,应该找一个最高的地方,上去观察一下潮水上涨时那两股急流的流向,从中我可以作出判断,万一我被一股急流冲入大海,是否有可能被另一股急流冲回来。我刚想到这一层,就看见附近有一座小山;从山上可以看到左右两边的海面,并对两股急流的流向可以一目了然,从而可以确定我回来时应走哪一个方向。到了山上,我发现那退潮的急流是沿着小岛的南部往外流的,而那涨潮的急流是沿着小岛的北部往里流的。这样,我回来时,小舟只要沿着北部行驶,自然就可以被涨潮的急流带回来。

Results show that floes' VC and D at the surface water were closely related to current velocity; and the peaks of VC lag those of the current velocity. The lag variation during ebb and flood tides is 10-30min and 30-50 min, respectively. Current velocity at 50 cm/s is a turning point of D vs. vertical average current velocity, before the point, Dm increases with current velocity, and decreases after the point. Similarly, VC at 75μl/L becomes a critical point in the surface water, below the point, D increases with VC, and above the point, D stabilizes.Δp is D dependent, larger floes have much lower Δp than smaller floes. Both D and Δp of floes affect ω. In the surface water during spring tide and neap tide, a power exponent relationship exists between Δp and D, and ω and D.

研究表明:①长江口徐六泾表层絮凝体体积浓度主要受水流流速影响,再悬浮现象明显,体积浓度过程线滞后流速过程线,落潮期间滞后10-30min,涨潮则滞后30-50min;②小于一定流速时絮凝体平均粒径随流速增大而增大,大于一定流速时絮凝体平均粒径则随流速增大而减小,徐六泾夫、小潮表层絮凝体在50cm/s的垂线平均流速时出现平均粒径与垂线平均流速关系的转折;③徐六注大、小潮表层絮凝体平均粒径在体积浓度75μl/L时出现平均粒径与体积浓度关系的转折,体积浓度小于75μl/L时粒径随体积浓度增加而增大,超过75μl/L时粒径随体积浓度的增加变化不明显;④絮凝体有效密度由粒径大小控制,粒径大,有效密度小,反之亦然,粒径和有效密度共同决定絮凝体静水沉速,有效密度和沉速与平均粒径之间均存在良好的幂指数关系。

This invention concerns a current control process for a feed-in voltage converter, wherein a detected flux-inducing current component and a detected torque-inducing currrent component of an actual currrent vector of a rotating field machine are each controlled for a flux-inducing current component set value and a torque-inducing current component set value of the rotating field machine. To that effect, a control set-value (DELTA u*sp, DELTA u*sq) is determined, dependent each time upon a determined current component control deviation. From these, current components of an actual current vector are formed each time by overlay of a formed pilot value (u*spvor, u*sqvor). This invention also concerns a device for carrying out this process.

本发明涉及一种用于馈入电压式变流器的电流调节方法,其中分别将所检测的一感应式电机的一实际电流向量(i s 的磁通感应电流分量和一转矩感应电流分量i sq )调节至该感应式电机的一额定电流向量的一磁通感应分量额定值和一转矩感应电流分量额定值,在这种情况下,分别根据所检测的一电流分量调节偏差计算出一调节器调节量(△u * sp ,△u * sq ),由这两个调节器调节量分别通过叠加所形成的一预控制量(u * spvor ,u * sqvor )形成一额定电压向量的电压分量(u * sp ,u * sq ),本发明还涉及一种用于实施该方法的装置。

Basing upon a systematic point, a detailed analysis of temporal and spatial characteristics of the flood-breeding environment, flood-causing factors and disasterbearing body in flood disaster system of Puyangjiang basin was made.

3本文从灾害发生的系统观出发,详尽分析了浦阳江流域洪涝灾害系统中孕灾环境、致灾因子和承灾体三个方面的时空分布特征。

The main buildings of resisting flood such as cofferdam and diversion tunnel without the capacity of flood control play a role in flood detention.

围堰和导流洞作为渡汛的主要设施,其没有调节洪水的能力,只能对洪水起到一定的滞洪作用。

第3/500页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Tragedy
Flood This Shit
Flood I
Small Rebellions
Flood Out The Club
Boats Against The Current
Mamaloi
Holy Light
Can't Stand The Rain
Current Situation
推荐网络例句

The circulation, consumption and reproduction of the trilogy have not only testified to its historical significance and literariness, but also invested it with new meanings.

该三部曲的流通、消费与再生产不仅验证了其历史意义及文学性,而切还赋予它以新的意义。

If he thought that he could buy me off, he would be wrong.

如果他认为他可以收买我,那他就大错特错了。

Can I be excused today's lesson?

我可以不上今天的课吗?