查询词典 final cost
- 与 final cost 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Chapter ThreeIt systematizes the theories of Strategic Cost Management,introduces the concepts, characteristics,analysis methods(such as strategic value chain analyses,strategic location analyses and strategic cost driver analyses) and cost management methods (such as Target Costing and Activity-based Cost Management) related to Strategic Cost Management.
第三章对战略成本管理理论进行梳理,介绍了战略成本管理的概念,分析了战略成本管理的特点,介绍了战略价值链分析、战略定位分析和战略成本动因分析等分析方法,并对与战略成本管理有关的成本管理方法进行了介绍,主要介绍了成本企划和作业成本法,并分析了其优点和缺点。
-
Then direct against the concrete conditions of the oil field of Xinjiang, influencing the important factor that the oil gas operated the cost in the oil field of Xinjiang to be analyzed at first, then analyzing in the face of the domestic and international oil field before combining provide the oil field oil gas in Xinjiang and operate concrete method and measure that the cost controls, and combine the change law of petroleum gas cost in the past 10 years of big company of foreign petroleum Oil field Company oil gas cost control what time does it get helpful enlightenment out of about Xinjiang, providing the incentive mechanism of operating the cost of oil gas of oil field company of Xinjiang to design finally.
然后针对新疆油田的具体情况,首先对影响新疆油阳油气操作成本的重要因素进行了分析,然后结合前面对国内外油田的分析给出新疆油田油气操作成本控制的具体方法和措施,并结合国外石油大公司在近十年的石油天然气成本的变化规律对新疆油田公司油气成本控制提出了几点有益的启示,最后给出了新疆油田公司油气操作成本的激励机制设计。
-
Current, the personnel of team of highway project cost basically comes from the unit such as cost management, design, construction and inspect manage, these cost personnel each has his strong point but also be short of somewhat each, although some passing,take an exam through cost engineer, but one part personnel is in short-term inside the requirement that still cannot accord with engineer of highway project cost.
目前,公路工程造价队伍的人员主要来自造价治理、设计、施工及监理等单位,这些造价人员各有所长但也各有所缺,虽然有的通过培训或通过造价工程师考试,但一部分人员在短期内还不能符合公路工程造价工程师的要求。
-
Table 2.2 Infrastructure in different transport modes Road - Public No inherent guidance Infrastructure provided - Private Artificial, shared way centrally at public expense and at nominal cost to users Rail -Heavy Inherent guidance Track and control centrally - Light Artificial, dedicated way provided and charged to - Metro operators at full cost or owned by operators Air Natural, shared way Infrastructure provided by third party at full cost Maritime -Coastal/short Natural, shared way Infrastructure provided by sea No inherent guidance third party and charged at full Deep sea cost Inland water Natural or man-made Infrastructure provided by shared way third party and charged at full No inherent guidance cost Pipelines Artificial, dedicated way Infrastructure usually Inherent guidance provided by user All modes (except pipelines, although a travelator or moving walkway' may be considered a pipeline) carry both freight and passengers.
表2.2 不同运输方式的基础结构公路公共私人没有固有的牵引人造的,共享的方式基础设施由中央以公共费用和以使用者名义上的成本来提供铁路重型轻型地铁固有的牵引人造的,独占的方式铁轨和控制设施以完全成本的形式提供和向运营者收取费用或者由运营者所独有航空自然的,共享的方式基础设施由第三方提供并以完全成本方式收取费用海运沿海/近洋远洋自然的,共享的方式没有固有的牵引基础设施由第三方提供并以完全成本方式收取费用内河水运自然或人工的,共享的方式,没有固有的牵引基础设施由第三方提供并以完全成本方式收取费用管道人工的,专属的方式固有的引导基础设施通常由用户提供所有的运输方式(除了管道,尽管自动扶梯也可以被看作是一种管道)既能载人也能载货。
-
The chapter two, namely the essential condition of engineering cost management of domestic and foreign countries, separately analyzes the basic domestic engineering cost management condition, the basic domestic railway engineering cost management condition and the foreign basic engineering cost management condition according to large amount of relative domestic and foreign data and information, and point out the main problem in the current railway engineering cost making system.
第2章国内外工程造价管理的基本情况,在参照大量国内外有关资料的基础上,分别分析了我国工程造价管理的基本情况、我国铁路工程造价管理的基本情况、国外工程造价管理的基本情况,指出了现行铁路工程计价体系存在的主要问题。
-
To confirm your reservation with the ticket 1, the day of booking and the day of the vote送票: In the civil aviation system after successful booking, customer service center will provide you with the confirmation in accordance with the manner with you to confirm the booking of flights and prices, and you need送票time for you送票; the event booking is unsuccessful, call center phone will notify you as soon as possible, so please be sure to keep you filled in Tel flow 2, the first book, not counting: If you would like to book machine bit later on the ticket, please indicate your deadline for the final out of votes (if you requested time limit for the final out of votes and the provisions of airline tickets contravene the time limits, the call center will be promptly notified of your final votes in the time limit), if not to specify you may be required to bear the loss Refund; Because the airlines have the right to cancel any reservations unbilled bit machine, so when you out in the final period of time decided to vote the ticket, please immediately notify the call center phone, we will call the day of your again for you to confirm your reservation slots previously the case.
确认预订与出票 1、当天预订并当天出票送票:在民航系统中订位成功后,客服中心将按照您提供的确认方式与您确认所预订的航班以及价格,并按您所需要的送票时间为您送票;万一订位不成功,客服中心将会尽快电话联系通知您,故请务必保持您所填的联系电话畅通 2、先预订,不出票:如果您希望先预订机位稍后出票,请注明您最后出票期限(如果您要求的最后出票时限与航空公司之规定出票时限抵触时,客服中心会及时通知您最后出票时限),如果不注明您有可能需要承担退票损失;由于航空公司有权取消任何预订未出票的机位,因此当您在最后出票时限内决定出票后,请立即电话通知客服中心,我们会在您来电当天再为您确认一下您先前预订的机位情况。
-
Concerning their own different elements of history, culture, social and economics, Anglo-American law system, Romano-Germanic family and Tai wan region have built separately instance construct of pyramid, such as the 4-grade third instance of the final, the 3-grade third instance of the final and the 3-grade first instance being the final, however, China's instance system is with the principle of the second instance of the final, and with the adjudication supervision as its supplement, which is with many shortcomings.
英美法系和大陆法系以及台湾地区基于他们各自的历史、文化、社会、经济等因素建立了金字塔型的审级结构,分别为四级三审终审、三级三审终审和四级一审终审、三级一审终审制度,而我国则实行&以两审终审为原则,以审判监督为补充&的审级制度,弊端甚多。
-
The video coding method includes the steps of dividing input frames into one final low-pass frame and at least one high-pass frame through a motion compensated temporal filtering, coding the final low-pass frame and then decoding the coded final low-pass frame, re-estimating the high-pass frame by using the decoded final low-pass frame, and coding the re-estimation high-pass frame.
所述视频编码方法包括以下步骤:通过运动补偿时域滤波将输入帧划分为一个最终低通帧和至少一个高通帧;对最终低通帧编码并随后对编码的最终低通帧进行解码;通过使用解码的最终低通帧重估所述至少一个高通帧;以及对重估的高通帧编码。
-
Shipping income is analyzed according to various affreightment businesses. Shipping cost includes of capital cost, dealing cost and voyage variable cost.
船舶收入是按不同租船方式分析收入来源,船舶成本则细分为资本成本、营运成本和航次变动成本来分析。
-
As one of the common facilities in manufacturing enterprises, air compressors are widely used due to their capacity of producing compressed air. However , an authoritative survey shows that air compressor system consumes about 86%of the total energy cost within five years compared with purchase price that only accounts for 8% of total cost. This high volume of energy consummation invisibly increases enterprises' operational cost. However ,within the 90% of the cost for energy, main tenance and repair , 50% can be saved.
压缩机作为制造厂最常用的设备之一,其所产生的廉价适用的压缩空气能源备受许多企业家青睐,据权威机构调查,空气压缩系统在五年的总成本中,运转能源消耗费用占约86%,压缩系统初期购置费用仅占总成本的约8%,其高额的运转能源费用无形中增加了企业运营成本;然而人们却不知道这里占近90%的能源及保养修理费用却是有50%以上是可能不必支付的。
- 相关中文对照歌词
- The City Is Here For You To Use
- Cost Of Love
- Cost Of Love
- You Can Leave, But It's Going To Cost You
- Love Don't Cost A Thing (RJ Schoolyard Mix)
- Post Apocalyptic Party
- Cost Me A Lot
- Final Days
- Bite Your Rhymes
- Free
- 推荐网络例句
-
More direct, directer ; most direct, directest
径直的,笔直的
-
Do you know how to use a chain saw?
你知道如何使用链锯吗?
-
This is close to the cost of the purchase price.
这样的收购价已接近成本。