查询词典 failure-free
- 与 failure-free 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
OBJECTIVES: To predict duration of azotemia and distinguish acute renal failure clinically from chronic renal failure by measuring the concentration of hair creatinine and analysing the correlation between Hcr and serum creatinine in 59 patients with acute renal failure and 64 patients with chronic renal failure .
目的:通过对59例急性肾功能衰竭(Acute renal failure,ARF)病人和64例慢性肾功能衰竭(Chronic renal failure,CRF)病人头发肌酐含量(Hair creatinine concentration,Hcr)测定、比较ARF组和CRF组病人就诊时30-40mm段头发肌酐含量之间的差别、对Hcr与血肌酐浓度(Serum creatinine,Scr)相关关系的研究,在临床上利用头发肌酐含量测定来判定肾功能衰竭持续的时间,进一步鉴别急、慢性肾功能衰竭。
-
Hepatic diseases are common, about 10% of them die of acute liver failure , ALF is a sever clinical pathophysiological syndrome of metabolic, secretic and immune disarrangement caused by severe hepatocyte dysfunction and decompensation, caused by drug, toxin, severe hepatitis and cirrhosis, liver injury or/and hepatectomy.
本课题为国家"863"计划生物项目的系列研究之一肝病是多发病,其中大约10%患者死于急性肝功能衰竭(acuteliver failure,ALF),是由药物、毒物、重症肝炎或肝硬变、肝外伤或/和肝切除术后致肝细胞功能严重受损、失代偿,引起机体代谢、内分泌、免疫等功能紊乱的一种严重临床病理生理综合症。
-
Risk perceptiveness and preparedness (Appelbaum et al,1998,p.120),for example,identify four dimensions that relate to individual risk perception and preparedness which they expressas fear of failure;fear of success;fear of what others will thind;and the fear of uncertainty.
风险知觉和准备(Appelbaum 等1998 年, p.120),例如,辨认与单独风险悟性和准备关系他们expressas 恐惧对failure;fear success;fear 的四个维度什么其他人意志thind;and 对uncertainty。
-
You can run the LIST FAILURE command to show all known failures.
可以运行 LIST FAILURE 命令显示出所有的已知故障。
-
To investigate the effect of artificial liver support system treatment in patients with drug - induced hep- atic failure, 12 patients with dHF received the combination treatment of hepatotherapy and ALSS, 10 patients with dHF received the combination treatment of hepatotherapy and ALSS, 10 patients with dHF only hepato - therapy as control.
作者:戴炜;杨大国;刘粤;顾明伦;曾丽红;邓永聪探讨应用人工肝支持系统(artificial liver support system,ALSS)治疗抗结核药物性肝衰竭(drug-in-duced hepatic failure,dHF)的临床疗效。
-
objectiveto observe the effect of humulus scandens merr. on chronic renal failure.
目的观察葎草煎剂对腺嘌呤所致大鼠慢性肾功能衰竭(chronic renal failure,crf)模型的影响。
-
In recent decades,there has been a growing concern among many prominent engineers that not only is the term"factor of safety"improper and unrealistic,but worse still a structural design philosophy based on this concept leads in most cases to an unduly conservative and therefore uneconomical design,and in some eases to an unconservative design with too high a probability of failure.
登录后回答可以获得经验值奖励,并可以查看和管理所有的回答。登录|在最近几十年里,人们已经越来越关注许多突出的工程师,不仅是&安全系数的&不正当的,不切实际,但更糟的是一个结构设计理念基于这一概念,引领,在大多数情况下,一个过度保守,所以乡,在一些简化设计一个unconservative设计以很高的机率failure。
-
Breath fails (Respiratory Failure, because lung aerates,RF) is obstacle of function of insufficient, dispersion and lung aerate / blood stream scale is maladjusted wait for an element, low oxygen blood appears when making static interest position issues breath disease and carbon dioxide retention, cause a series of physiology functions and metabolization thereby disorder clinical and integrated proof.
概要: 呼吸衰竭(respiratory failure,RF)是由于肺通气不足、弥散功能障碍和肺通气/血流比例失调等因素,使静息状态下呼吸时出现低氧血症和二氧化碳潴留,从而引起一系列生理功能和代谢紊乱的临床综合征。
-
The RFPA (realistic failure process analysis) software is used to analyze the deformation/failure of a tunnel passing through the rock mass with incompetent laminar structural planes at different obliquities and the displacement of the key points around the tunnel, with microdimensional elements introduced in combination with the elementary constitution model based on damage mechanics and statistics.
通过引入细观层次的微元体,采用损伤力学和统计理论的单元本构模型,利用岩石破裂过程分析软件RFPA(realistic failure process analysis),对具有不同倾角层状软弱结构面岩体中隧道的变形破坏特征、隧道周边关键部位的位移进行了分析。
-
The following factors, among others, could cause actual results and future events to differ materially from those set forth or contemplated in the forward-looking statements: defaults on or non-renewal of leases by tenants or renewal at lower-than-expected rent or failure to lease at all or on favorable terms, decreases in real estate values and impairment losses, increased interest rates and operating costs or greater-than-expected capital expenditures, our failure to obtain, renew or extend necessary financing, re-financing risks, risks related to our obligations in the event of certain defaults under co-investment ventures and other debt, risks related to debt and equity security financings, difficulties in identifying properties to acquire and in effecting acquisitions, our failure to successfully integrate acquired properties and operations, our failure to divest properties we have contracted to sell or to timely reinvest proceeds from any divestitures, our failure to contribute properties to our co-investment ventures, risks and uncertainties affecting property development, value-added conversions, redevelopment and construction (including construction delays, cost overruns, our inability to obtain necessary permits and public opposition to these activities), our failure to qualify and maintain our status as a real estate investment trust, risks related to our tax structuring, failure to maintain our current credit agency ratings or to comply with our debt covenants, environmental uncertainties, risks related to natural disasters, financial market fluctuations, changes in general economic conditions, global trade or in the real estate sector, inflation risks, changes in real estate and zoning laws, a continued or prolonged downturn in the U.S., California or global economy, risks related to doing business internationally and global expansion, risks of opening offices globally, risks of changing personnel and roles, losses in excess of our insurance coverage, unknown liabilities acquired in connection with acquired properties or otherwise and increases in real property tax rates.
以下因素可能会导致实际结果和未来事件与前瞻性陈述产生重大出入:承租人拖欠租金或者不续租;利率以及经营成本的提高;我们未能获得必要的外部融资;再融资的风险;与合资项目和其它债务发生特定违约时我方承担的义务有关的风险;与债务和股权融资有关的风险;确定拟收购的物业以及完成收购过程中遇到的困难;我们未能成功整合收购的物业和业务;我们未能剥离已经签约出售的物业或未能及时将剥离带来的收益再投资;影响物业开发和建设的风险和不确定性(包括建设延期、费用超支、我们无法获得项目建设所需的必要批准以及公众对项目开发建设的反对等);我们无法获得或者维持作为房地产投资信托公司的资质;与我们的税收策划有关的风险;无法保持我们目前的信用评级;环保方面的不确定性;与自然灾害有关的风险;金融市场的波动;整体经济状况或者房地产业的变化;房地产和城市规划法律的调整;美国、加利福尼亚州或者全球经济的衰退;与开展国际业务和全球扩张有关的风险;保险范围之外的损失;与被收购的物业有关的或者其它未知责任以及房地产税率的提高等。我们的成功还依赖于总体经济走向,包括利率、所得税法、政府监管、立法、人口总数变化以及我们在10-K表中作的截至2009年12月31日的季度报告中&风险因素&和其它标题项下阐述的其它问题。
- 相关中文对照歌词
- Heart Failure
- A Suicidal Failure
- Failure By Design
- Failure's Not An Option
- The Sound Of Failure / It's Dark... Is It Always This Dark??
- Failure By Designer Jeans
- 99% Of Us Is Failure
- Creator Failure
- Failure
- Failure
- 推荐网络例句
-
Do you know, i need you to come back
你知道吗,我需要你回来
-
Yang yinshu、Wang xiangsheng、Li decang,The first discovery of haemaphysalis conicinna.
1〕 杨银书,王祥生,李德昌。安徽省首次发现嗜群血蜱。
-
Chapter Three: Type classification of DE structure in Sino-Tibetan languages.
第三章汉藏语&的&字结构的类型划分。