查询词典 expressway
- 与 expressway 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Jingzhu Expressway and 106 national Road are very close, which makes us within the "Guangzhou 1 hour economic circle".
京珠高速公路和106国道非常接近,这使得我们在"广州1小时经济圈"。
-
Traffic areas developed, there is a half-hour circle of Beijing and Tianjin, Beijing-Shijiazhuang, Tsubo, Beijing and Shenzhen Expressway 102,106 four two countries, as well as the Beijing-Kowloon Railway Road; 1 hour circle are the two municipalities of Beijing and Tianjin, the Capital International Airport and Tianjin Xingang.
域内交通发达,半小时圈内有京津、京石、津保、京深四条高速公路和102、106两条国道以及京九铁路;1小时圈内有京津两大直辖市、首都国际机场和天津新港。
-
At present, the deficiency existing in the expressway project feasibility research of our country shows mainly: the inaccurate sureness of the construction scale and industrial grade, the scheme not proved and selected deeply and tightly, the insufficient economic analysis and appraised materials, the incredibility assessment, the improper work method of the feasibility research, etc..
目前,我国高速公路项目可行性研究存在的不足主要表现在:建设规模和技术等级的确定不准确,方案论证及比选不深入和不严密,经济分析与评价资料不足,评估的可信度不高,可行性研究的工作方法不当等。
-
Tiefeng rock tunnel is a control project in Wanzhou-Kaixian expressway.The length of the tunnel exceeds 6?000m.The geological conditions of the tunnel are very complex,including groundwater ingression,firedamp,gypsum strata,soft rock deformation, rock outburst etc.The construction is difficult.Some construction methods are studied for Tiefeng rock tunnel to pass the complex zone mentioned above.
铁峰山2号隧道是重庆万-开高速公路控制性工程之一,隧道左右线长度均超过6 000m,隧道穿越的地层复杂,存在突水、煤层瓦斯、煤巷采空区、石膏岩地层、软岩变形、岩爆等不良地质现象,工程地质条件极为复杂,施工难度大,施工防护要求高。
-
The main results of the study are obtained as follows:1 In order to analyze and study the physical and mechanical characteristics of Lianyungang marine soft clay deeply, large numbers of basic mechanical characteristics tests and tri-axial shear tests are completed.2 In order to investigate the loaded and failure characteristics of the cement-soil, the cement-soils for the different ratio and different cure time are studied in the laboratory, and their unconfined compression tests and tri-axial shear tests are performed.3 Based on the solution of one-dimension consolidation, the one-dimension consolidation of the double-layered foundation is solved for two-grade loading in virtue of transcendental equation; Simultaneously, the one-dimension consolidation of the double-layered foundation is solved by means of Laplace transform for two-grade loading, and Stehfest numerical transform is applied in Laplace's inverse transformation; Furthermore, according to the practical foundation shapes, the consolidation models of the soil between piles and the substratum are built and solved respectively.4 The effect of each parameters on the consolidation of the double-layered foundation is discussed, and the solution of load transfer method for double-layered foundation is applied in A1-A4 section of Lian-Xu expressway. The results of calculating settlement of the double-layered consolidation theory are basic agreement with the measuring settlement results.
取得了以下几方面的研究成果:1针对连云港海相软土进行一维固结和三轴剪切试验,深入分析连云港海相软土的物理力学特性。2模拟水泥土搅拌桩施工,在室内制备不同配比、不同龄期的水泥土试样,并进行无侧限抗压试验和三轴剪切试验,揭示水泥土的受力特性及破坏特性。3运用超越方程,以双层地基一维固结解析解为基础,推导出二级加荷条件下双层地基的固结解析解;同时,通过荷载传递法并借助Laplace变换对双层地基的固结问题进行了数值求解;此外,根据实际的地基结构,建立了桩间土和下卧层的固结模型并分别进行求解分析。4分析探讨了双层地基中各参数对双层地基固结的影响程度,并运用荷载传递法的解答计算了连-徐高速公路A1-A4标水泥土搅拌桩处理段的六个断面,计算结果与实测数据有较好的一致性。
-
Expressway network; diversified investment; management integration; agent construction system; model of charge distribution; CFLP metho
高速公路网;投资多元化;管理一体化;代建制;收费分配模式; CFLP法
-
The new type of multi-functional anticorresive coating is very suitable for inwall of sewage reservoir in service area of expressway .
采用无毒原材料和自制的抗菌、防霉、抗藻多功能纳米无机抗菌剂,研制了一种适用于高速公路服务区污水池内壁的多功能防腐涂料。
-
This is just like the Jelutong Expressway concession agreement.
这就像日落洞大道的合约一样,州政府受制于前朝政府批准的方案,也就是必需允许土地征用及批准土地地契。
-
Provincial jurisdiction,"Stephen King's Highway," the east-west, north and south foreshore Bo×Expressway, transportation is extremely convenient.
域内省道"泉王公路"横贯东西,滨博高速公路纵穿南北,交通运输极为方便。
-
Factory is located in Tianjin Beichen Technology Park from the entrance of Beijing-Tianjin-Tanggu Expressway Yixing Fu only 2 kilometers, 1 hour or so can arrive in Beijing, Tianjin Binhai New Area and other places away from Tianjin Airport 15 minutes away from the Tianjin Nancang only 15 sub-stations minutes at land, rail, sea conditions have convenient.
本厂位于天津北辰科技园区内,距京津塘高速公路宜兴阜入口仅2公里,1小时左右可以到达北京,滨海新区等地,距天津机场15分钟路程,距天津南仓分组站仅15分钟的路程,在陆路、铁路、海运方面有着便利的条件。
- 相关中文对照歌词
- Expressway To Yr. Skull
- Live it Up
- So Why So Sad
- Novacane
- Europa
- Danceaway
- Get 'Em Daddy (Remix)
- On My Way Back Home
- Will You Be Me?
- Intro (Stakes Is High)
- 推荐网络例句
-
We are in a good position to meet your requirements.
我们完全可以满足你方的需求。
-
We are all pervade d with a sense of disaster.
我们普遍有大祸降临的感觉。
-
Points out that the switching frequency、the input inductance and the output power all have great contribution to the input-current THD. When the output power goes up, the input current harmonic content keeps almost constant, thus the THD goes down.
指出开关频率、输入电感和输出功率对输入电流THD有显著影响,发现整流器输出功率增加时,输入电流谐波含量基本不变,从而输入电流THD减小。