英语人>网络例句>exploration 相关的网络例句
exploration相关的网络例句

查询词典 exploration

与 exploration 相关的网络例句 [注:此内容来源于网络,仅供参考]

The definite confidence level coefficient should carries on theadjustment according to the geology exploration degree and the feasibility studyresult. If the geology exploration degree is high, then it is economic and needn'tadjust, if the geology exploration dregree is low, then deal it according to the specialdetails to carry on the appropriate readjustment.

确定可信度系数应根据地质可靠程度及可行性研究结果进行调整,地质勘查程度较高,属经济的,不需调整,地质勘查程度较低,则根据具体情况进行适当调整。

It becomes a information exchange site,the exploration project,work area,research production,seismic datum,explainer datum,well datum can be organized into one system,which can share the research production in the exploration project;Through the datum expression of well decision,we can achieve the browsing of work area basemap,the seismic section"s remote display,the well position report"s display,the visual information of well"s wall.The system can lead to a right direction for those expert"s exploration decision .The system runs through all the process of well positon"s decision,deployment and management,which makes the exploration work becoming integrated.Now we can manage the well positon"s decision with computer,which improves work efficiency,condense whole exploration circle.

油田井位部署辅助决策系统以项目数据库的方式将分散在多个研究单位或个人手中的各类图档资料信息集中分类地保存起来,通过该系统使勘探项目、工区、研究成果、地震数据体、解释数据、井数据等有机地组织在一起,使勘探研究成果在勘探项目组内进行了充分共享;基于项目库,系统实现了井位部署决策所需的:工区底图浏览、地震剖面远程显示、井筒信息可视化,为论证专家提供了论证现场所需数据的展示;采用井位聚类分析和模糊数学综合评判决策方法,为井位论证决策提供了基本模型;利用井位部署流程子系统贯穿了井位论证、部署、管理业务的全过程中,使勘探业务有机的整合为一体,实现了井位论证工作的计算机管理。

The great potentials for exploration of litho-stratigraphic reservoirs do not appear until new methods and technologies have been applied and in-depth understandings have been gained. In recent two or three years, big discoveries have been made in Jilin oilfield, in which 80 percent of reserves are found in some areas of thin sand-shale interbedding of its delta front. There still exist petroleum potentials amounting to 6×10^8 t for exploration in this area, especially in southern Songliao basin where the litho-stratigraphic traps will be more important domains and deserve extra attention. Hence, geologically speaking, this study on the hydrocarbon accumulation of litho-stratigraphic reservoirs in Songliao basin is of vital significance to exploration of the southern Songliao basin.

但通过新方法、新技术的应用和地质认识的不断深入,岩性-地层油气藏展现出了较大的勘探潜力,吉林油田近2-3年来的大发现和新增储量的80%是在有一定面积的三角洲前缘薄互层中获得的,在这个领域中仍有6×10^8t的石油资源有待勘探,特别是松辽盆地南部地层-岩性圈闭是未来油气勘探的重要领域,具有进一步解剖研究和勘探价值,因此,对松辽盆地岩性-地层油气藏成藏规律进行研究,对于松辽盆地南部勘探有着十分重要的意义。

Results: Relative diagnostic accordance rate of the clinical exploration and four kinds of image processing setup was the highest(P>0.01)in the first premolars. Relative diagnostic accordance rate of the clinical exploration and the pseudocolor image setup and negative image setup was the highest(P>0.01), and that of the clinical exploration and the pseudo3D image setup and positive image setup was the lowest(P< 0.01), showing statistical differences in the second premolars.

结果:①第一前磨牙:4种图像处理格局下邻面龋的检出结果与临床诊断结果的符合率高,差异无统计学意义(P>0.01);②第二前磨牙:负片和伪彩图像格局下邻面龋的检出结果与临床诊断结果的符合率高,差异无统计学意义(P>0.01);③正片和伪3D图像格局检出结果和临床诊断结果的符合率低(P<0.01)。

The problem has been studied from two sides, firstly, from the viewpoint of applicability, based on the development strategic objectives of the oil company, with the aim to unify the exploration and extraction decisions of the resources in an integrated framework, and integrate the macro economic and technical objectives with micro economic and technical models of an oil well, an integrated non-linear dynamic optimal control model has been constructed, the objective is the benefit maximum of the exploration and extraction of the resources, and the optimalstrategies are obtained by changing the problem into a non-linear mathematical programming problem, on the other hand, from the more macro level, based on the analysis of the characteristics of the exploration and extraction activities of oil and gas resources, a conclusion is easily deduced that the procedure is full of randomicity, then discovering procedure of oil deposit is proved to be a Poisson process, and the reserves process is a supermartingale process, so the model of exploration discovery rate and the reserves model could be constructed.

其次从相对更宏观的层次上,通过对油气资源勘探与开发的特点分析,认为具有很强的随机性,证明了勘探活动发现油气藏的过程为一泊松过程,所发现的油气藏储量为一上鞅过程,在此基础上,建立了油气藏勘探发现率模型及储量模型,在油气价格服从几何布朗运动条件下,以油气开采收益最大化为目标,建立了一个油气资源勘探与开发的随机最优控制模型,采用动态规划方法得到了值函数的HJB方程,并针对方程的特点,以及方程及其变量所对应的经济学意义,对最优策略的求解进行了一些讨论。

This paper introduces a new seismic exploration method-3D Walkaway VSP. As a combination of the 3D seismic exploration method and the VSP technology, it can accomplish the simultaneous data acquisition used to performed by the two methods and so it is fully competent in refined petroleum exploration.

介绍了一种新的地震勘探技术-三维井地联合Walkaway VSP技术,该技术将三维地震勘探技术和VSP技术有机结合,实现了地面三维地震采集和井下VSP技术联合同步采集,发挥了两种技术的优势,弥补了各自的不足,可应用于油气藏的精细勘探和开发。

Objective To evaluate the effect and safety of suture needle puncture and discission of bile duct in laparoscopic common duct exploration.

目的 探讨在腹腔镜胆道探查术(laparoscopic common duct exploration, LCDE)中应用缝针穿刺切开胆管法的有效性和安全性。

Geodynamics disquisition of Tibetan plateau is the one of the most popular topics, developed countries ploughed into many funds in seismic exploration, it is advantaged using broad band seismic recorder in native seismic exploration and floor analyse seismic exploration, and it can offer constitution image with great depth, which provides approach to solve geodynamical problems.

宽频地震仪进行天然地震探测和层析地震探测的工作不仅在经济上合算,而且能够提供较大深度的构造图象,从而为解决地球动力学的基本问题提供了途径,论文分析目前国内外宽频地震仪器发展状况,设计了宽频地震仪,实现了地震数据及GPS信息的采集功能。

The wide-azimuth 3D3C seismic exploration takes the advantages of both wide-azimuth P-wave exploration and converted-wave exploration. This technique can be well applied to solve the exploration problem of deep-buried compact fracture gas reservoirs in western Sichuan.

宽方位三维三分量勘探综合了宽方位纵波勘探和转换波勘探二者的优势,对于解决川西深层致密裂缝性气藏的勘探开发问题具有良好的应用前景。

References 1 pit exploration project - pit exploration project pit exploration project - the body in order to expose the geology phenomenon and ore occurrence, from the surface or underground excavation of various types of small section tunnel exploration, short pit exploration.

为了揭露地质现象及矿体产状,从地表或在地下掘进的各种类型小断面坑道的勘探,简称坑探。

第1/100页 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?