查询词典 event
- 与 event 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Variations 52.3 Exceeding 15 Percent If, on the issue of the Taking-Over Certificate for the whole of the Works, it is found that as a result of: all varied work valued under Sub-Clause 52.1 and 52.2, and all adjustments upon measurement of the estimated quantities set out in the Bill of Quantities, excluding Provisional Sums, daywork and adjustments of price made under Clause 70, But not from any other cause, there have been additions to or deductions from the Contract Price which taken together are in excess of 15 per cent of the "Effective Contract Price"(which for the purposes of this Sub-Clause shall mean the Contract Price excluding Provisional Sums, and allowance for dayworks, if any) then and in such event (subject to Any action already taken under any other Sub-Clause of this Clause), after due consultation by the Engineer with the Employer and the Contractor, there shall be added to or deducted from the Contract Price such further further sum as may be agreed between the Contractor and the Engineer or, failing agreement, determined by the Engineer having regard to the Contractor's Site and general overhead costs of the Contract.
如果在签发整个工程接收证书时,发现由于: 47 超过百分之 52.3 十五(15%)的变更所有按第52.1款和52.2款规定作价的全部变更工程;对工程量清单中开列的估算数量进行计量所做的全部调整费用,但不包括所有暂定金额,计日工作费用及按本文第 70 条规定所作的价格调整。而并非由于任何其他原因,当加到或从合同价中减去的金额总和超过了有效合同价格就本款而言,应指不包括暂定金额和计日工(如有的话的合同价的 15%时,那么,工程师应在与承包人和业主协商后,在考虑据本款采取的任何步骤后,再将合同价减少或增加一笔工程师与承包人协商的调整金额,若不能达成一致意见,则由工程师考虑承包人的现场管理费用及总管理费开文后确定此数额。
-
I think it's the absolute best event in DC.
我认为这是绝对最好的直流事件。
-
In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.
在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage charges thus incurredshal be for the Seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and / or demurrage charges thus incurred shall be for seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物超过船舷并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the Seller''s failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrag
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the Seller ' s failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage ges thus incurred shall be for the Seller ' s account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port,all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight /or demurrage charges thus incurred shall be for the Seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
Event of the sellers' failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
- 相关中文对照歌词
- The Main Event / Fight
- The Main Event (Ballad)
- Extinction Level Event
- The Main Event
- Someday, In The Event That Mankind Actually Figures Out What It Is That This World Revolves Around, Thousands Of People Are Going To Be Shocked...
- Anniversary Of An Uninteresting Event
- The Main Event
- In The Event That Everything Should Go Terribly
- Main Event
- Event Horizon
- 推荐网络例句
-
However, as the name(read-only memory)implies, CD disks cannot be written onorchanged in any way.
然而,正如其名字所指出的那样,CD盘不能写,也不能用任何方式改变其内容。
-
Galvanizes steel pallet is mainly export which suits standard packing of European Union, the North America. galvanizes steel pallet is suitable to heavy rack. Pallet surface can design plate type, corrugated and the gap form, satisfies the different requirements.
镀锌钢托盘多用于出口,替代木托盘,免薰蒸,符合欧盟、北美各国对出口货物包装材料的法令要求;喷涂钢托盘适用于重载上货架之用,托盘表面根据需要制作成平板状、波纹状及间隔形式,满足不同的使用要求。
-
A single payment file can be uploaded from an ERP system to effect all pan-China RMB payments and overseas payments in all currencies.
付款指令文件可从您的 ERP 系统上传到我们的电子银行系统来只是国内及对海外各种币种付款。