查询词典 equipment failure
- 与 equipment failure 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The two weakness parts failure characters and failure mechanisms are the base of further failure detecting and reliability testing.
以油水传感器检测机械密封的泄漏、以振动传感器检测轴承的振动和以工作电流值来检测潜水电泵整体的失效。
-
Methods The thriiodothyronine(T 3 ),thyroxine(T 4 ),thyroid stimulating horˉmonein102elderly patients with chronic heart failure and30normal people were determined by particle glimˉmer.The classes of heart function were assessed and the left ventricular ejection fractionwas observed by eˉchocardiography among the62low thiiodothyronine state cases in elderly patients with chronicheart failure and the40normal level thiiodothyronine state cases in elderly patients with chronic heart failure.
应用微粒子发光法检测102例老年慢性充血性心力衰竭住院病人及30例健康对照者的血清三碘甲状腺原氨酸(T3 )、四碘甲状腺原氨酸(T 4 )、促甲状腺素;检测62例低T 3 综合征老年慢性充血性心力衰竭患者和40例非低T 3 综合征老年充血性心力衰竭患者的左室射血分数,比较两组间心衰的程度。
-
1 Notwithstanding Clause 15,"Liability Exemption" hereinabove, in case of failure of the seller or the buyer (the Non-Performing Party) to comply with any of the obligations assumed under this contract, the other party, without prejudice to any other recourse available to them, may consider such failure as a breach of this contract and terminate the same, or to unilaterally suspend its performance until such failure is remedied, and in any case may claim direct damages for the breach of this contract from the other party, to the extent allowed by the terms and conditions set forth herein.
除了上文条款15 "免责声明"外,在卖方或买方未履行合同规定的任何义务的情况下,其他一方,对于没有提供任何其它意见的,可视为违约并考虑终止合同或暂时搁置合同的执行,直到这样的状况被矫正,若因此违约而受到直接损失可向违约方索赔,并且在违反合同规定时需提供声明。
-
Results Forty three cases were died from cerebral hernia before operation 1 week, in which 30 cases with bilateralis mydriasis, and the other 13 cases with half mydriasis. Twenty seven cases died from various complication during 2~3 weeks, in which 11 cases with pulmonary infection, 6 cases with upper gastrointestinal hemorrhage, 5 cases with acute renal failure, 3 cases with multiple organ failure, 1 case with heart failure, 1 case with metabolic disorder of body fluid.
结果术 脑疝形成使中枢衰竭在1周内死亡者43例,其中双侧瞳孔散 30例,单侧瞳孔散大13例;各并发症在2~3周内死亡者27例:肺部感染11例,上消化道出血6例,急性肾功能衰竭5例,脏器功能衰竭3例,心功能衰竭1例,体液代谢紊乱1例。
-
The failure rate; that failure rate monitor is unit trends monitoring to apply below distinct Cache size with the process and the Cache that increase advantageous position differentiates algorithm expanded the Cache with conventional optimum failure rate differentiates algorithmic, numerary of Cheng of basis application line differs to give application to gift when undertaking Cache differentiates different power worth, the application that has more line Cheng in order to make obtains more sharing Cache, improve integral performance of the system thereby.
失效率监控器以进程为单位动态监控在不同的Cache容量下应用的失效率;而加权Cache划分算法扩展了传统的失效率最优的Cache划分算法,根据应用线程数目的不同在进行Cache划分时给应用赋予不同的权值,以使具有更多线程的应用获得更多的共享Cache,从而提高系统的整体性能。
-
In hypertensive patients with heart failure,the ratio of ADM/ADT decreased with the deterioration of heart failure Conclusion:The oversecretion of ADT and slow compensation of ADM is a characteristic deregulation of vasoactive peptide in the process of hypertensive heart failure.
ADM代偿缓慢和ADT分泌过度是高血压心力衰竭过程中血管活性肽调节紊乱的一个特点。
-
The generalized reliability of single failure mode component and unit structure under different kinds of uncertainty factors is treated perspicuously and classified. Combined with the three class fortify standard of aseismic design code,the conception of reliability vector of structures and systems with intermediate state before failure is put forward, and the calculation model of reliability vector with three stage working modes of "safety-intermediate-failure" and the operation rules of reliability vector of the simple aseismic engineering systems composed by structures are established.
针对各种不确定性因素下的单失效模式构件和单体结构,进行了广义可靠性的明晰化分类处理,结合抗震设计规范的三级设防标准,提出了具有中介状态结构与系统可靠性向量概念,建立了具有"安全-中介-失效"三级工作模式的可靠性向量计算模型,及其由结构组成的简单抗震工程系统的可靠性向量运算规则。
-
In the paper, based on the hypothesis that the failure of every poles is independent and by the method of reliability assign and reassign, the difficult problem of disposing the structure system reliability constraints is solved. Based on sensitivity information, the given system failure probability can be replaced by the sum of every element failure probability.
针对基于体系可靠性约束优化设计的关键问题一结构体系可靠性的分析和计算,在基于结构各单元失效相互独立假设的基础上,提出了以各单元失效概率摘要之和近似体系失效概率的处理方法,并给出了体系可靠性分配和再分配的方法,以确保结构体系在优化过程中的可靠性,实现了结构基于体系可靠性的优化设计。
-
In the paper, based on the hypothesis that the failure of every poles is independent and by the method of reliability assign and reassign, the difficult problem of disposing the structure system reliability constraints is solved. Based on sensitivity information, the given system failure probability can be replaced by the sum of every element failure probability. And then the structural optimization design based on system reliability is preceded.
针对基于体系可靠性约束优化设计的关键问题一结构体系可靠性的分析和计算,在基于结构各单元失效相互独立假设的基础上,提出了以各单元失效概率之和近似体系失效概率的处理方法,并给出了体系可靠性分配和再分配的方法,以确保结构体系在优化过程中的可靠性,实现了结构基于体系可靠性的优化设计。
-
The calculating formula for fatigue reliability of single component was deduced. A criterion of fatigue failure of integral platform and the method for determining key failure mode of platform were suggested,and the computing method for failure probability of integral platform was presented.
在此基础上给出了单个构件的疲劳可靠性计算公式,提出了平台整体疲劳失效的简化判断依据和平台关键失效模式的确定方法,并给出了平台整体失效概率的计算方法。
- 相关中文对照歌词
- Heart Failure
- "Is This My Fate?", He Asked Them
- Failure By Design
- Beg
- Girl Of Promise
- At Least I'm Known For Something
- Grand Failure Anthem
- Failure
- Legal Tender
- Family
- 推荐网络例句
-
The United Kingdom has pledged to provide technical assistance to the peacekeeping effort in Darfur, including airlifting supplies and equipment to assist the African peacekeepers.
英国承诺为达佛的維和努力提供技术帮助,包括提供非洲的維和部队空运补給和裝备。
-
Results: The level of ET-1mRNA in placental villus was significantly higher in pre-eclamptic women than that in control group.
结果:妊高征组患者胎盘绒毛组织ET-1 mRNA的表达较正常妊娠组明显增高。
-
Size and configuration of two kinds of concrete heteromorphic blocks and one kind of reinforced gabions were designed.
并由此设计了两种混凝土异形块和一种钢筋石笼的形状、尺寸及工程布置形式。