查询词典 embankment
- 与 embankment 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Western television cameramen who went onto the embankment beside the Palestine Hotel to film the battle were pulled from danger by helmeted marines who dragged them down behind concrete parapets and waved to reporters on the hotel's upper balconies to get down.
西方电视摄引记者来到巴勒斯坦饭店旁边的堤防上,但是被带着头盔的海军陆战队员拉了到混凝土围墙下,这些海军陆战队员还挥手示意让宾馆楼上阳台的记者快下来。
-
After building the indoor model of reinforced fly ash embankment, deformation, stability, compaction technology and the mechanism of geotextile have been studied, through the trials of compaction, deflection, plate-bearing and shock tests on different thickness of soil layer. The relations between story thickness and roller-passing number regularities of strength and deformation during curing period and the recommendation lay-down coefficient are pressnted.
建立了加筋粉煤灰路堤的室内模型,通过不同层厚的碾压工艺,承载板,弯沉及冲击破坏等试验和检测,对加筋粉煤灰路堤的变形特性、稳定性、施工压实工艺及加筋的必要性和作用机理进行了研究,得出了层厚与碾压遍数的关系,强度和变形随养生时间的变化规律,松铺系数的推荐值。
-
At first, this paper conducts in depth research on classification method, compaction propeties, granulometric composition and crushing of stone. On the basis of clarifying engineering characteristics of material of rock-filling embankment, requirements of ground treatment have been put forword in this paper. Then combined with the site test and engineering practice in SHUINAN Road and LANLIN Road, through the synthetical analysis of factors of influencing densification effect for the maximum grain size of filling material, lay-down thickness, granulometric composition, densification machinery and densification frequency etc., this paper studies key technical problems about construction technologies for spreading and leveling of filling material, choosing densification machinery, densification technology and slope construction systematically. Finally, construction technologies of filling lime-stone and sand-stone roadbed have been proposed in this paper ,which are significant for quality guarantee of highway engineering.
本文首先从石料的分类方法、压实特性、粒径组成以及破碎性等方面进行研究,在明确填石路基填料的工程特性基础上,进而提出了填石路基的地基处理要求,然后结合广西水南路和甘肃兰临路填石路基试验路段上的现场研究,通过对填石路基填料最大粒径、松铺厚度、粒径组成,压实机械以及碾压遍数等影响压实效果因素的综合分析,系统研究了填石路基填料的摊铺与整平技术、压实机械选型技术、压实工艺以及边坡施工技术等施工工艺中的关键问题,最后提出石灰岩类和砂岩类填石路基的施工工艺要求。
-
It suitable for the place where the topography is limited and need to build retaining wall both side ,such as municipal road、approach embankment highway intercommunication overpast ramp 、 railway and highway which traverses fertile land .
它适用于地形受限制而需要两侧修筑挡土墙的地方,如市政道路桥头路堤,公路互通立交匝道,穿越良田的铁路和公路等。
-
Based on topography and geological condition,this paper ulity field test and laboratory test to study the gradation, compaction, density, perviousness ,it can help the project cosnstrct and provide an reference for the other high embankment dam'construction.
为此,本论文结合该工程的地形、地质条件,采用现场试验和室内试验,对坝体各种材料的级配、击实、密度、碾压渗透及现场碾压特性进行试验研究,为工程的顺利建设和今后高土石坝建设提供参考意见。
-
It is more reasonable to use polygonal line method to analyze the stability of its slope . According to the testing results on-site , the paper gives a forecast of subsidence of high fills embankment after soaked in water .
根据现场工地的测试成果,论文分析了现场高填方路堤的工后沉降规律,并对其浸水后的稳定性作出了预测。
-
Station Design Criter and Constraints The option to combine the provision of Westminster Station on the Jubilee Line extension with an existing proposal for phase 2 of the New Parliamentary Building (NPB2,later named Portcullis House) at the junction of Bridge Stree and Victoria Embankment arose from sessions with a House of Commons Select Committee.
车站更临界设计和限制条件选择在五十周年纪念线扩展上结合威斯敏斯特车站的供应,由于2现有建议阶段大楼议会的新(NPB2,过后命名吊门房子)在桥Stree 和维多利亚堤的交叉口起因于与一个下议院一起的会议选择Committee。
-
One of the largest preponderance of the Embankment is in taking full advantage of local material as the stuffing.
土石坝的一个最大优势就是充分利用当地材料进行坝体的填筑。
-
The test results show the principle of variation of pressures on culverts beneath high fill is similar, it is that, even if the embankment is filled up to a higher height, the earth pressures can still partly transfer to the top of culvert, as a result the pressures on the culvert increase nonlinearly with the variation of height of fill and further the pressures are obviously lower than theoretical value by σ=γH.
模型试验和数值模拟计算结果表明,当填土达到一定高度后,高填方涵洞上方将产生明显的拱效应,但由于涵洞填土为破碎的岩土,其拱效应与岩石中开挖洞室上方的拱效应不同,高填方涵洞上方填土产生的"土拱"效应具有不稳定的特点,表现为随着填土高度的增加仍有部分土压力传递到涵洞上,涵顶土压力随填土高度成非线性增加。
-
The crushed-rock revetment is one of the active measures in maintaining embankment on permafrost in Qinghai-Tibet railway.
在铁路通车运营后,受施工条件的制约,一些工程措施无法采用,而片石层护坡具有保温效果显著、布设施工灵活的特点,是多年冻土区路基补强和病害整治的首选措施。
- 推荐网络例句
-
Do you know, i need you to come back
你知道吗,我需要你回来
-
Yang yinshu、Wang xiangsheng、Li decang,The first discovery of haemaphysalis conicinna.
1〕 杨银书,王祥生,李德昌。安徽省首次发现嗜群血蜱。
-
Chapter Three: Type classification of DE structure in Sino-Tibetan languages.
第三章汉藏语&的&字结构的类型划分。