英语人>网络例句>either end of a bridge 相关的网络例句
either end of a bridge相关的网络例句

查询词典 either end of a bridge

与 either end of a bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]

Tied arch bridge is a bridge that has the outline of concinnity and is fit for building in the city or on the soft clay ground, which possesses the important status in the domestic and foreign history of bridge building. Its construction method and design theory are already comparatively mature and perfect.

系杆拱桥作为一种具有优美外形同时又适合在城市或软土地基上修建的桥型,在国内外桥梁建筑史上都占有十分重要的地位,其施工方法和设计理论都已经比较成熟和完善。

To resolve this problem, we'll reel outwards drive across the bridge to the intermediate surface of variable-speed drive wheel with two wheels of processed into 30 °, the increase in friction with Groove, even if such a belt would not have had; the diameter of 6 mm, spin out to o-rubber belt changed out with Burr corn-cob o-shaped belt; crossing the bridge to another variable-speed drive belt pulley to roll out of the book, two rounds of the belt pulley turned into 1/2 inch, using chain drive sprocket, and fixed machinewe side wall to cross the bridge wheel seat side wall plate processing growth holes for adjust tension pulley and sprockets.

为解决这个问题,我们将分切机朝外传动面传动到中间过桥变速皮带轮的两轮加工成30°的带槽,增加摩擦力,这样皮带即使松了也不会打滑;直径6mm的O型橡胶皮带改成外面带毛刺的聚氨酯O型皮带;过桥变速皮带轮的另一个传动到出书辊的皮带轮,两轮改成1/2英寸的链轮,采用链条传动,再将固定在机器侧墙板的过桥轮座侧墙板孔加工成长孔,可任意调整皮带轮与链轮的松紧。

The dynamic equations were derived for the vehicle-bridge coupled system with an axial force of bridge based on D Alembert's principle and the assumed mode method. The numerical results were obtained by Newmark-β method. Dynamic responses of the system caused by axial forces of bridge and speed of vehicle were discussed respectively.

应用达朗贝尔原理和振型分解法,建立了在桥梁轴向力作用下车-桥系统的动力学方程,利用Newmark-β方法,对车桥耦合问题进行数值求解,比较分析了桥梁轴向力、车速等对系统动力学响应的影响。

First, theoretical analysis methods were used for the static analysis of the suspension bridge. The formulas for endogen force of the asymmetry suspension bridge through elastic theory were deduced and they were contrasted with those of the normal suspension bridge. The basic differential equation of deflection theory was deduced and the method of getting the roots of the equation was offered, and some simplified methods for deflection theory were presented.

推导了非对称式悬索桥弹性理论的内力计算公式,并对比了其与对称式悬索桥弹性理论的内力计算公式的异同;推导了非对称式悬索桥挠度理论的基本微分方程,并且给出了部分均布荷载作用下基本微分方程的试算方法;提出了挠度理论的几种简化计算方法。

The main works are as follows: 1 The developingt history of the traffic load on bridges is represented. Typical bridge codes in some countries are discussed and these traffic load models are comparative analyzed. Analysis shows that the influence of layout axle for the total traffic load effect on bridge gradually becomes smaller with the increase of bridge span. So most national norms use the distributed load as the equipollent load of traffic load.

主要内容包括下面几个方面: 1阐述了桥梁汽车荷载发展的简史,讨论了部分国家典型的桥梁汽车荷载设计规范,并对这些荷载模型进行了对比分析,分析表明随着桥跨的增大,车轴布置对桥梁整体荷载效应的影响逐渐变小,因而大部分国家的规范都把均布荷载作为车辆的等代荷载。

S regards the light floating bridge for Xinfeng River Bridge construction, the drum-shape pontoons of the bridge rolled with steel plates are used as the principal carrying system that takes advantage of water buoyancy.

bstract 新丰江特大桥轻型浮桥采用钢板卷制成圆桶状的浮鼓,利用水浮力形成主要承重系统,并在其上铺设槽钢和钢板护栏等,形成桥面通行系统,介绍该桥的设计与施工工艺。

The present situation in flood-control and waterlog-drain are analyzed, and the present problems are pointed out.2 The causes and characteristics of the floods in Linyi are summarized, and the flood-control project and the waterlog-drain system in Linyi are also introduced.3 On the basis of summarizing the reconnaissance data of engineering geology, the engineering geology conditions of flood-control projects in the city of Linyi are studied, including the floodway project ,the hinge project, the Ge-Jiu Road Bridge project, the No.327 national highway road bridge project, the E-Huang Road Bridge project, and the Xiaogezhuang's chief inverted siphon project in the project of "Bifurcating the Su River to the Beng River".4 Seepage FEM analyses are carried out on the flood-control projects of Yi River, Beng River and Xiaosu River, respectively.

总结了临沂市洪灾成因及洪水特性,介绍了临沂市城市防洪工程和排涝工程。 3、在综合工程地质勘察资料基础上,分析了临沂市城市防洪工程的工程地质条件,包括:"分涑入祊"分洪道工程地质条件分析、"分涑入祊"枢纽工程地质条件分析、"分涑入祊"葛九公路桥工程地质条件分析、"分涑入祊"327国道公路桥工程地质条件分析、"分涑入祊"鹅黄公路桥工程地质条件分析、"分涑入祊"小葛庄总干倒虹吸工程地质条件分析。

To the wall with construction materials, articles posted above, on handrails and electrical shutter doors, Yao Wang Taiwan, by product description 9 with wooden dam, looked like the look of cement, from the ground to the top of the dam is within the white walls, projectors, DVD, audio equipment 10 fence, the laying of real grass, small stone embellishment, flower basket fence, equipped with VAG stress management system entities pipeline 11 Steel Bridge, the need to open the door into the car, you can remove the bridge, waterfall in the lateral bridge, and a straight line, the ground when the tunnel plate, the plate Below are the sink, sink, a ring-shaped water system 12 the ship has three sails, fixed line connections, at the top of a volume system, laying the ground mosaic, surrounded by lamps.

用建筑材料做墙,上面贴写真,有扶手下去,又电动卷帘门,有遥望台,有产品图文说明 9)大坝用木制,看上去像水泥的样子,从地面到顶部,大坝内是白色墙面,有投影仪,DVD,音响设备 10)围栏内铺设真草皮,小石头点缀,栅栏花篮,安装有VAG压力管理系统的实体管线 11)钢结构桥,需要开门进车时,可以把桥整体移走,瀑布在桥的外侧,直线而下,地面时洞洞钢板,钢板下面是水槽,水槽内有水形环系统 12)船上有三个帆,同轴连接固定,顶部有卷收系统,地面铺设马赛克,周围有地灯。

According to theory analysis and example computation, the following conclusions are obtained.1. During the analysis on the cable shape in the suspension bridge"s completion state, the pre-displacement of saddle and the case that the cable and stiff girder commonly bear the second-stage dead load should be considered.2. When supposing the construction ideal initial state in the first time, if the initial state model is established according the cable"s span central sag in the bridge"s completion state, and the reasonable correction formulation is created in the iteration process, the result can converges fast.3. The cable shape in the bridge"s completion state is not parabolic, nor catenary. It is between parabola and catenary. Actually it is funicular polygon closer to the catenary.

通过理论分析和实例的计算表明:1在悬索桥主缆成桥线形分析过程中,须考虑主塔鞍座的偏位以及二期恒载由主缆和加劲梁共同承担的实际情况;2在第一次假设施工理想初态时,以成桥状态已知的主缆跨中垂度建立施工理想初态模型,同时在迭代计算的过程中,建立合理的修正公式,才能使收敛的速度快:3在成桥状态时主缆的线形既不是抛物线,也不是悬链线,而是介于抛物线与悬链线之间,更接近于悬链线的索多边形。

Elaborate systematically the contents of the bridge structure valuation、general method and classification,base on absorbing to have already results in basically thought of foundation,combine the research result of the domestic and international bridge valuation,build up the structure and the mode of the Chongqing Jiahua bridge with layer analysis method and misty comprehensive evaluation.

在吸收和采用已有成果的基本思想的基础上,结合国内外桥梁评估领域和其他相关领域的研究成果,建立了以层次分析法结合变权综合原理为基础,通过模糊综合评价及阈值评价方法构建重庆嘉华大桥的状态评估的架构与模式。

第14/500页 首页 < ... 10 11 12 13 14 15 16 17 18 ... > 尾页
相关中文对照歌词
Bless Those (Little Annie's Prayer)
London Bridge Is Falling Down
Either Or Either
Hood
Live Or Die
30 Seconds
Swim
Trust Me Or You Don't
West End Girls
Secretz Of War
推荐网络例句

But this is impossible, as long as it is engaging in a market economy, there are risks in any operation.

但是,这是不可能的,只要是搞市场经济,是有风险的任何行动。

We're on the same wavelength.

我们是同道中人。

The temperature is usually between 300 and 675 degrees Celsius.

温度通常在摄氏300度到675度之间。