查询词典 due process
- 与 due process 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The results show that new residual stress is about 6MPa under air-cooled normalizing; due to chilling effect of surface quenching, the temperature differences between coarse bar and thin bar in stress frame, and between surface and core of the coarse bar are tremendous; in quenching process, the stress of the certain areas in the coarse bar is maximum at 2s, more than 420MPa, the stress frame casting has the bigger possibilities of fracture.
结果表明,正火空冷时新产生的残余热应力约6MPa;淬火时由于表面激冷作用,应力框在粗细杆间及粗杆的表面和芯部都有巨大温差;铸件在淬火的过程中,粗杆的某些部位在2s时等效应力达到最大,超过了420MPa,极有可能导致铸件断裂。
-
Slip-form construction is due to coordination of the construction trades, so during the construction process, the various types of jobs must be the rational allocation of staff, in general, the sliding mode is two shifts, working 12 hours for the class, usually in the operating platform include: concrete work, woodwork, sliding mode, electrician, both inside and outside the hanger has close-ray personnel, above there is a crane driver, the use of pumped concrete, as well as pipeline maintenance personnel, in addition to the basis of sliding speed of erection Master runway at any time.
由于滑模施工是多工种相互配合的施工,所以在施工过程中,各工种人员一定要合理配置,一般来说,滑模是两班制,工作12个小时为一班,通常在操作平台上有:混凝土工,钢筋工,木工,滑模工,电工,内外吊架上有收光人员,上边还有一个塔吊司机,采用泵送混凝土时,还有管道维护人员,此外还有架子工根据滑升速度随时搭设上人跑道。
-
The entrance section of FuXi Double-arched Tunnel is modeled in the fact of factual shallow buried and unsymmetrical pressure condition. Adopting the three heading construction method to simulate twelve kinds of construction projects, confirm reasonable construction orders and left and right tunnel face interval, systematically analyze and research the changing law of the tunnel deformation and surrounding rock stress in soft and cracked condition of surrounding rock,bring forward pertinent advices against construction disease; Build the deep buried tunnel model in middle section of tunnel , separately adopt the central heading bench cut benching method and the central heading full cross method to simulate ten kinds of construction projects, establish the reasonable construction orders, sidestep length and tunnel face interval, which are due to the deep buried tunnel, systematically analyze and research the change law of the tunnel deformation and surrounding rock stress in the section with good surrounding rock condition, bring forward the reasonable construction projects which can make sure of construction safety and save construction time; Because the central wall is disturbed many times during constructing process, its displacement and stress distribution is very complex.
富溪隧道进口段依照实际的浅埋偏压状况建立模型,采用三导洞法开挖模拟了12种方案,确定了合理的施工顺序和左右主洞掌子面错距,系统地分析研究了软弱破碎围岩浅埋偏压段施工的隧道变形和围岩应力变化规律,提出了防止施工病害的针对性建议;洞身段按深埋隧道建立模型,分别采用中导洞台阶法和中导洞全断面法模拟了10种方案,确立了适合深埋隧道的合理施工顺序、台阶长度和掌子面错距,系统分析研究了围岩较好深埋段施工的隧道变形和围岩应力变化规律,提出了兼顾施工安全和节省工期的合理施工方案;由于受到多次扰动,中隔墙的位移和应力变化规律较为复杂,通过对各种方案的对比分析,得出了中隔墙在施工不同阶段的位移变化规律、应力变化规律和应力分布规律,尤其对于浅埋偏压段隧道施工时中隔墙位移和应力变化规律做了深入研究,提出了合理的施工建议。
-
Due to the charge process of dusty particles, the electric conductivity, dielectric coefficient and modulus decay of dusty plasma are larger than that of plasma.
结果表明:由于尘埃充电过程,尘埃等离子体电导率、介电常数以及衰减系数都比一般等离子体的大。
-
Moreover, almost all g of bulk commodities due to a shortage of the "false impression" and a substantial rise, to turn to because of the financial crisis in the process of high platform diving too fast, many Chinese companies simply too late to prepare, which directly increase their high-priced raw materials.
此外,几乎所有的原因是&假象大宗商品短缺g&和可观的升幅,转向,因为在高平台跳水太快金融危机的过程中,许多中国企业根本来不及准备,这直接增加其高价位的原料。
-
In the process of wire drawing, metal dust will be generated due to friction between wire and drawing die.
拉丝生产过程中,由于金属丝与拉丝模之间的摩擦,将会有金属粉尘产生。
-
Due to its high solubility property, safe production process and environment friendly characteristics, the ethyl ester of soybean oil would be applied in printing ink manufacture.
其优异的溶解性能,安全的生产工艺和环保特性,表明大豆油脂肪酸乙酯在油墨中的应用潜力。
-
Tropica were initially sceptical about the sales potential to aquarists due to the high price of the plants, which was a result of the difficult production process.
热带最初持怀疑态度的销售潜力aquarists由于高物价的植物,它是一个结果,艰难的制作过程。
-
We find that optical vortices could be efficiently formed and generated due to the interference and superposition effect of all the beamlets, during the propagation process of the coherent radial laser arrays with the initial well-organized phase distributions through the free space, the resulted beam in the far field has the strong rotation effect with the phase helicity.
我们发现具有确定初始相位的、圆径向对称分布的相干激光阵列光束在传播的过程中由于干涉和叠加效应可以形成螺旋形的位相分布且保持光束中心强度为零,即形成光涡旋。
-
Due to the simple process, non-toxicity and environmentally-benign, silane treatment technology has shown a great potential in replacing toxic chromates in a variety of industries.
硅烷处理技术工艺简单,无毒,无污染,所得膜层与金属基体具有良好的结合力,且防腐蚀性能与铬酸盐转化膜相当。
- 推荐网络例句
-
Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).
呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。
-
The cost of moving grain food products was unchanged from May, but year over year are up 8%.
粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。
-
However, to get a true quote, you will need to provide detailed personal and financial information.
然而,要让一个真正的引用,你需要提供详细的个人和财务信息。