英语人>网络例句>drills 相关的网络例句
drills相关的网络例句

查询词典 drills

与 drills 相关的网络例句 [注:此内容来源于网络,仅供参考]

To cooperate with new and old parts: although standard zero, components, but in between interchangeable in assembly parts, and to make the optimal coordination between trim, still needs a lot of work, such as the gear and rack, boring if after removal of gear various performance indicators are used by detecting without the need to change, and to replace worn rack, rack and rack positioning pin hole on installation bolt holes and should be first, reoccupy hand crossed positioning drills and tapered reamer to match the drill and match hinge, and after the installation of new and old super-modulus gear mesh clearance to achieve technical standards, this work takes about one day.

。新,旧零部件重新配合过程:尽管标准零,部件间具有互换性,但在装配中,要使新旧零部件间的配合达到最佳状态,仍需大量的修整工作,如镗床的齿轮与齿条,若拆卸后齿轮的各项性能指标经检测尚能使用不需更换,而齿条磨损严重需更换,那么齿条及齿条安装面上的定位销孔和定位螺钉孔就需先划线定位,再用手电钻及锥形铰刀重新配钻和配铰,且新齿条安装完毕后与旧齿轮的啮合间隙需达到技术要求的标准,此项工作需时约一天。

To cooperate with new and old parts: although standard zero, components, but in between interchangeable in assembly parts, and to make the optimal coordination between trim, still needs a lot of work, such as the gear and rack, boring if after removal of gear various performance indicators are used by detecting without the need to change, and to replace worn rack, rack and rack positioning pin hole on installation bolt holes and should be first, reoccupy hand crossed positioning drills and tapered reamer to match the drill and match hinge, and after the installation of new and old super-modulus gear mesh clearance to achieve technical standards, this work takes about one day.

。新,旧零部件重新配合过程:尽管标准零,部件间具有互换性,但在装配中,要使新旧零部件间旳配合达到最佳状态,仍需大量旳修整工作,如镗床旳齿轮与齿条,若拆卸后齿轮旳各项性能指标经检测尚能使用不需更换,而齿条磨损厉害需更换,那么齿条嘉逸条安装面上旳定位销孔和定位螺钉孔就需先划线定位,再用手电钻及锥形铰刀重新配钻和配铰,且新齿条安装完毕后与旧齿轮旳啮合间隙需达到技术要求旳标准,此项工作需时约─天。

For the first time, a screw pile and pile driver system for preventing flood and rushing to deal with an emergency was manufactured. The screw piles of the system is different from screw drills used to sap, and it doesn't push soils out. Analyses, including the screw pile's structural strength analysis and the screw blade's welding analysis, were done by ANSYS, which showed that the screw pile's structural strength is enough and that the distort of the screw blade is small. Testing on the screw pile and pile driver system showed that the system performed stably and could meet the need of preventing flood and rushing to deal with an emergency. A mechanics model of interaction of a screw pile and soil was built, and expressions of torque of screw pile's cylindrical part on the condition of screw pile's crew part being driven into soil fully were gained, then the relation of the torque with screw pitch and out diameter of cylinder, which shows the torque decreases with the screw pitch increasing, and that the torque increases with the out diameter of cylinder increasing, which was according with the experiments of the screw pile's being driven into soils, and thus a screw pile with the best structure was chosen. Experiments of bionic surface showed that, on the condition of certain pressure on the surface, the protruding bionic surface can not reduce adhesion and resistance and that the corrugated bionic surface can reduce adhesion and resistance. An orthogonal experiment of the corrugated bionic surface was done with the factors including the width of protrusion, the space between two protrusions, the trolley's velocity and the vertical surface pressure and with the surface frictional coefficient as the experimental target, and some inclusions were drawn that the best combination of the factors was acquired and that the width of protrusion affected the surface frictional coefficient remarkably.

研制了防汛抢险螺旋桩机系统,提高了沉桩作业效率;利用ANSYS对桩体进行整体结构强度分析以及螺旋叶片的焊接分析,表明桩体结构强度足够,焊接过程中,螺旋叶片的变形小;对整个螺旋桩机系统进行试验,表明该系统性能可靠,工作稳定,作业效率高,能够满足防汛抢险沉桩作业基本需要;建立了螺旋桩桩土作用力学模型,得出螺旋桩沉桩过程中螺旋桩螺旋部分完全进入土体时螺旋桩圆柱部分所受扭矩以及扭矩与防汛抢险螺旋桩的螺旋导程和圆柱外径的关系曲线,表明螺旋桩螺旋部分完全进入土体时螺旋桩圆柱部分所受扭矩随着螺旋导程的增大而减小,随着圆柱外径的增大而增大,这与螺旋桩沉桩试验结论相符合,据此优选出最佳结构的螺旋桩;仿生曲面试验表明,尺寸较小的球冠突起型仿生曲面在一定压力作用下未能起到减粘降阻的作用,而尺寸较大的波纹型仿生曲面相对平板具有一定的减粘降阻作用;以波纹型仿生曲面突起宽度、波纹型仿生曲面两突起之间间距、台车的牵引速度以及叶片表面垂直载荷为因素,以曲面摩擦系数试验指标进行正交试验,寻求出在一定试验条件下最佳因素水平组合;波纹型仿生曲面突起宽度在本试验条件下对曲面摩擦系数影响显著,而其它几个因素对曲面摩擦系数影响均不显著;通过波纹型仿生曲面突起宽度和台车牵引速度的单因素试验,表明曲面摩擦系数随着仿生曲面突起宽度的增大而减小,而随着台车牵引速度的变化基本保持不变,和正交试验结果保持一致。

For the first time spud drilling: at 22:00 on the December 31, 2009 using the 26 " drills, earth-moving polymer drilling fluid depth of 16.40m for the first time since the Park, the drilling, at 06:00 on January 4, 2010 to the depth of drilling 262.5m, horizons Upper.fars Group at its first drilled, January 5 Electrical Measurement finished, at 04:00 on the 6th, under 20 " cementing casing to the depth of 261.50m, water, mud back to the ground, the cement plug surface depth of 248.50 m, casing pressure test with water 10.0MPa qualified, January 8 cementing electrical measuring the quality of finish, drill cement plug at 20 o'clock on the 10th end, the end of a job opening.

下面这段中文,希望网友帮忙译为英语:第一次开钻钻进:2009年12月31日22:00使用26&钻头、搬土聚合物钻井液自园井深16.40m第一次开钻,2010年1月4日06:00钻进至井深262.5m,层位Upper.fars组第一次完钻,1月5日电测完,6日04:00下20&套管至井深261.50m固井,水泥浆返至地面,水泥塞面井深248.50m,套管清水试压10.0MPa合格,1月8日电测固井质量完,10日20:00钻水泥塞完,结束一开工作。

It presents historical demand data for 1997, 2002 and 2007 and forecasts for 2012 and 2017 by tool type (e.g., drills, saws, sanders, polishers and grinders, screwdrivers, planers and routers, hammers, pneumatic, engine-driven, wrenches, pliers, edge tools) and market (e.g., construction, automotive aftermarket, industrial, consumer).

提供了该行业的历史需求数据( 1997年, 2002年和2007年),并根据工具类型(如锯,打磨,抛光和研磨机,螺丝刀,扳手,钳子,)及市场(例如,建筑,汽车售后市场,工业,消费)预测了2012年和2017年的市场。

This is our best selling seed monitor for planters and drills requiring 16 rows or less.

这是我们最畅销的种子监视器。

Our range of electrical tools includes planers, circular saw, routers, drills, angle grinders and cutting machines.

技术力量雄厚,生产、检测设备先进,具有快速的产品设计开发能力和规模生产能力。

Name; The Zhou Dafu sign unidirectional pearl punching machine, the product disposition, pearl punching machine, handle, boost, drills clamps the hand spoon, rubs needle one, the 2mm in hexagonal head wrench, the tungsten steel needle 0.6-1.1 each, the jig 16 pairs, foot switch, an instruction booklet book, the extra purchase's tungsten steel needle needs 3 Yuan one, the jig is a 2 Yuan pair.

名称;周大福牌单向珍珠打孔机,产品配置,珍珠打孔机一台,手柄一个,助力手一个,钻夹手匙一把,磨针头一个,2mm的内六角扳手一把,钨钢针0.6-1.1各一把,夹具16对,脚踏开关一只,说明书一本,额外购买的钨钢针需要3元一支,夹具是2元一对。

V be trained or train by means of drills 训练;操练;演习: The well-drilled crew managed to rescue most of the passengers.

训练有素的机组人员设法营救出了大部分乘客。

The 21-year-old from New Jersey (who was averaging 26.2 points, 13.8 boards and 3.2 blocks in the five games leading up to his injury) is also going through extensive running drills and other conditioning work, and is already at his playing weight.

来自新泽西的21岁的拜纳姆(他在受伤之前的五场比赛中场均26.2分、13.8篮板和3.2封盖)也进行大量跑动训练以及其他身体锻炼,并且他现在已经达到标准体重。

第25/27页 首页 < ... 19 20 21 22 23 24 25 26 27 > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?