英语人>网络例句>draw up 相关的网络例句
draw up相关的网络例句

查询词典 draw up

与 draw up 相关的网络例句 [注:此内容来源于网络,仅供参考]

Around the world international aids go wrong keep the peace a shortage of food cause sb. to do sth. live in poverty in real life people in need belong to the UN a UN Goodwill ambassador give a speech be pleased to do sth. have the chance to do sth. refer to sb./ sth. be made up of mean to do sth./ doing sth. be honoured to do sth. take on this role set up / about doing / down / out to do be based on develop friendly relations with sb. co-operate in doing sth. promote respect for human rights as you know touch the lives of people everywhere be involved in with the help of sb. worthy organizations be worth doing sth.= be worthy of being done assist the victims of wars in addition protect sb. from doing sth. prevent sb .from doing sth . child labour record sth.= make records of be aware of sth./ make sb aware of draw one's attention=draw the attention of sb. add sth. to sth.

add up / add up to under the umbrella of 全世界国际援助出错保持和平缺少食物导致某人做某事生活贫穷在现实生活中有需要的人属于联合国一位联合国亲善大使做讲座高兴做某事有机会做某事谈及某人或某事由某物组成打算做某事/意味着做某事荣幸做某事承担这个角色建立/着手工作/写下/开始做以…为基础和某人发展友好关系合作做某事促进对人权的尊敬正如你所知道的涉及每个地方人们的生活涉及;卷入在某人的帮助下令人尊敬的组织值得做某事帮助战争的受难者除了保护某人免受…的伤害阻止某人做某事童工记录某事意识到引起某人的注意把…加到…/加起来/加起来为在…的保护下 17 41。

Draw up really" is the main skill of the painting poem description appearance; In the meantime, with Chien invite of the pen and ink draw an appearance of elegant, combine truth and falsity for light and free, the action fitting and proper body is got angry now by appearance, all making the appearance in poem present export surplus more realistic appreciate beauty value with landscape painting object."

拟真"是唐代山水题画诗描绘画面的主要手法,并通过以形写神达到画面描绘逼真神妙的至境;同时,以简约的笔墨绘出画面的精美,以虚实结合衬出画面的空灵,以动静相宜体现画面的生气,都使得诗中画面呈现出超越现实和山水画对象的审美价值。"

Evev though/as usual The brightness ought to arouse people to AIDS annotates a medium (draw one's atteniou to) We are three's tall students , we do not ought to indulge in computer game That young reporter makes a resolution to report this matter truly (make up one's mind) I live within one room towards the north , can not find sunlight all day long When the fireman is got to, the house has already been burned down Even if in the once failing,I give up neither Be negligent leading to (the to testing the lead failing) I am able to persuade him to change mind as far as possible (make enery efort/ change one's mind) The children hopes that the soon gets rid of zoo play That you ought to pay attention to English much listen to and say otherwise, you are in communicating with the foreigner is able to have difficulty As long as you study attentively in English, you are therefore likely to learn (putone with English; S mind to) Leave classroom front , be sure to be good with the lock make sure

evev though/as usual)媒体应该引起人们对艾滋病的光注(draw one's atteniou to)我们是高三的学生,我们不应该沉迷于电脑游戏那位年轻记者下决心真实的报道此事(make up one's mind)我住在一间朝北的房间里,终日不见阳光消防队员到达时,房子已经被烧毁了即使在失败一次,我也不放弃粗心大意导致试验失败我会尽力劝说他改变主意(make enery efort / change one's mind)孩子们盼望早日去动物园玩你应该多注意英语听和说,否则,你在与外国人交流是会有困难只要你专心于英语学习,你就能把英语学好(putone;s mind to )离开教室前,一定把们锁好

Facebook rolled out in home page " Facebook city hall: The Facebook law in draw up " discussion area, but do not participate in to 1000 users discuss, another " Facebook city hall: In draw up duty authority states " discussion area is only also many 9000 user is participated in.

Facebook在首页推出了"Facebook市政厅:拟议中的Facebook法则"讨论区,但不到1000名用户参与讨论,另外的"Facebook市政厅:拟议中的责权声明"讨论区也仅有9000多名用户参与。

First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.

第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。

She laughed. She picked up my dictionary and talked to me."Look, Nancy. The second meaning of 'draw' is to make a picture with a pen, a pencil or chalk! So the sentence means: Make a picture of your house with a pen, a pencil or chalk."

我不知道。我不懂它的意思,我的朋友玛丽读了我刚写下的句子,她笑了,她拿起我的字典对我说"看Nancy draw的第二个解释是用钢笔简笔或粉笔画一张画,所以这句话的意思是:用钢笔简笔或粉笔画一张关于你家的画"我明白了!

Analyze and compare the description feature points matching result of several kind basis. Adopt to pass similarity transformation matrix to describe the quality of matching methods. Draw up an experiment project, and draw up procedure through MATLAB.

分析比较了评价特征点匹配效果的几种依据,采用了通过相似变换矩阵来描述匹配好坏的方法,制定了实验方案,通过MATLAB编制程序,验证了SIFT算法的有效性。

Airo {ah'-ee-ro} a primary root; TDNT - 1:185,28; v AV - take up 32, take away 25, take 25, away with 5, lift up 4, bear 3, misc 8; 102 1 to raise up, elevate, lift up 1a to raise from the ground, take up: stones 1b to raise upwards, elevate, lift up: the hand 1c to draw up: a fish 2 to take upon one's self and carry what has been raised up, to bear 3 to bear away what has been raised, carry off 3a to move from its place 3b to take off or away what is attached to anything 3c to remove 3d to carry off, carry away with one 3e to appropriate what is taken 3f to take away from another what is his or what is committed to him, to take by force 3g to take and apply to any use 3h to take from among the living, either by a natural death, or by violence 3i cause to cease

相关经文回前一页 142 airo {ah'-ee-ro}原始的字根; TDNT - 1:185,28;动词 AV - take up 32, take away 25, take 25, away with 5, lift up 4, bear 3, misc 8; 102 1 举起,提起,提高 1a 由地上举起,拿起一个东西:例:石头 1b 举起,抬高,提高一个东西:例:头 1c 拖,拉一个东西:例:鱼 2 to take upon one's self and 拿走被举起的东西,承担 3 拿走被举起的东西,强行带走 3a 由一个地方迁移 3b 拿走或移走附在一个东西上的物件 3c 移开 3d 带走一个人 3e 欣赏被带走的东西 3f 拿走原属於一个人或已经允诺给他的东西,夺取 3g 拿走且任意使用 3h 死亡,不论是自然死亡或因著外力 3i 停止

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

第1/41页 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".

歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。

This is Kate, and that's Erin.

这是凯特,那个是爱朗。

Articulate the aims, objectives and key aspects of a strategic business plan.

明确的宗旨,目标和重点战略业务计划。