英语人>网络例句>drainage-tube 相关的网络例句
drainage-tube相关的网络例句

查询词典 drainage-tube

与 drainage-tube 相关的网络例句 [注:此内容来源于网络,仅供参考]

cerebral hemorrhage of 46 ventricle grave (be more than 20ml) patient to divide two groups into A, B randomly, a group 22, use microscopical technical ossicle window opens haematoma of skull grave head cleared art + group of;B of art of the drainage outside ventricle 24, in art of drainage of puncture of haematoma of head of grave of be issued to lower levels of CT fixed position + art of the drainage outside ventricle.

方法46例脑室型丘脑出血(大于20ml)患者随机分成A、B两组,A组22例,采用显微技术小骨窗开颅丘脑血肿清除术+脑室外引流术;B组24例,在CT定位下行丘脑血肿穿刺引流术+脑室外引流术。

After analyzing the CMT drainage mass under different initial condition, the primary result has been concluded: The CMT drainage velocity is related to the change of CMT pressure, the drainage mass of CMT without sparger increase monotonously along with time, and has a obvious inflexion.

遮流板对减小凝结起着积极的作用,在蒸汽完全凝结和部分蒸汽快速凝结阶段下CMT加遮流板其凝结换热系数较无遮流板时减小了3—5倍。

This paper first makes an introduction to turbulent debris flowdestroying drainage canal ,then simply summarizes the characteristics of the turbulent debris folw;thirdly deeply analyses drainage canal from two directions:one is vertical to drainage canal wall,the other is equal to drainage canal wall.

针对稀性泥石流特点,从垂直于排导槽边壁方向和平行于排导槽边壁方向对排导槽的受力情况进行了比较深入的分析,导出了多个公式,为设计排导槽提供了理论依

According to drainage capacity calculation results, Water in drainage trough of dryer can be drained out favorably when inlet steam humidity is 10% and drainage capacity has 50% surplus. Calculated maximal water level of drainage trough of dryer by analytical method is consistent with that calculated by CFD software.

当干燥器入口湿度为10%时,干燥器集水槽最大深度解析计算结果与CFD计算结果一致,即疏水结构能够顺利将波形板收集到的水疏走,并且有51%的余量。

Underground Drainage can be divided into underground level and vertical drainage,waterlogged removal and regulating soaking,but the ground drainage only drains flood,can't drain waterlogged by the earthsurface accumulated water,it is finished by underground drainage.

地下排水可分为地下水平和垂直排水,除涝治渍,而地上排水仅排洪涝,不能排地表残积水之涝,而要由地下排水完成。

The technique does not have any simplification of drainage holes. In this paper, discussions are mainly conducted on the substructure mesh dividing and its second time automatic dividing, the substructure shape, the continuity among substructures and general elements, the classification and definition of the integrated hydraulic model of drainage substructure, the iteration computation of water level inside drainage hole, the application of the technique in solving unsteady unsaturated seepage field, etc., therefore, the high efficient, precise and quantitative analysis of the complex seepage with densely distributed drainage holes is totally realized.

该技术不对排水孔幕作任何简化,本文着重从子结构网格划分模式及二次自动剖分、子结构单元形态、子结构与总体单元网格之间的连续性、排水子结构完整水力学模型分类及定义、排水孔内水位迭代计算、排水子结构法在非稳定非饱和渗流场中的推广应用等各个方面进行论述,实现了对工程复杂渗流场中密集排水孔幕的高效、精细、定量分析。

In combination with the Yingbulu engineering,the author studied deeply the influence of drainage plan drainage well pit impervious curtain,drainage ditch drainage well on seepage field.

用有限元法结合英布鲁水电枢纽工程,对降水方案选择、基坑防渗帷幕、排水沟、排水井对基坑渗流场的影响进行了研究。

Now engineering operation is conducted using surface drainage, horizontal drainage pipes, drainage wells and drainage tunnel.

目前之整治方式为施以地表排水、横向集水管、集水井、排水廊道等整治工程。

The results show that the methane drainage quantity from the bores perpendicular to face cleat was 1.2 times that of the bores parallel to face cleat in any time and the difference between them becomes more distinct with the drainage time increasing. In the research area, the bores perpendicular to the face cleat was 2.61 times that of the bores parallel to face cleat in maximum drainage quantity and 4.34 times that in drainage effect, and the reasonable time is about 300 days.

结果表明:垂直面割理方向钻孔的抽放量在任何时刻都明显高於平行面割理方向钻孔的抽放量,抽放时间越长,两方向抽放量之间差距越显著;研究区垂直面割理方向钻孔的极限抽放量是平行面割理方向钻孔的2.61倍,抽放率高出4.34倍,合理抽放时间在300d左右。

Waste water drainage system of Longhu Street, total length is 3.7km, drainage cross section is 2.5×3m spear plate culvert,(4) presently, capable of connecting with city drainage system 1.5km across 108 National Road to planned sewage treatment plant, it is a 3×5m drainage canal.

龙湖街污水排水系统,全长3.7公里,排水断面2.5 X 3M的盖板涵。⑷穿越108国道至规划的污水处理厂目前可接入城市排水系统1.5公里,为3 X 5M的排水明渠。

第2/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

This paper discusses design and realizable methods of remote test output interface from logical design angle.

本文从逻辑设计的角度讨论遥测输出接口的设计及实现方法。

This also 星体投射plies to buildings, structures and geological features.

这也适用于建筑物和地质特征。

We all hope for a better life.

我们都希望好的生活。