英语人>网络例句>drain of 相关的网络例句
drain of相关的网络例句

查询词典 drain of

与 drain of 相关的网络例句 [注:此内容来源于网络,仅供参考]

The installation of a Watts air gap with the drain line terminating above a floor drain will handle any normal discharge or nuisance spitting through the relief valve.

连接通向地漏的排泄管的美国瓦茨气隙的安装将有助于处理通过安全阀排出的任何正常排放或有害的泄漏。

The installation of an air gap with the drain line terminating above a floor drain will handle any normal discharge or nuisance spitting through the relief valve.

安装一个配置终端在地漏上方的排泄管气隙,用于处理通过安全阀的正常排放或有害排放。

This paper accedes that rational brain drain is essential request for market economy, and it stimulates the advancement of the technological level of the enterprises and the society. However, due to the imperfect system of property rights and the nonstandard market order, this paper thinks too that brain drain inevitably does great harm to both enterprises and society.

本文认为:人才合理流动是市场经济的必然要求,且有利于促进企业、社会技术水平的提高;但在人才流动中,由于产权制度及市场秩序的不健全,也必然会给企业、社会带来很大的危害。

Drainage system Design of drainage system is it discharge way drain off water the sureness of the system to include; Calculation of the flow of second of design of the sanitary sewage drainage pipeline of the building ; Is it in charge of sideways to drain off water , water conservancy in charge ofed to set up calculate and in charge of pipeline slope , pipe diameter and sureness of elevation sideways, set up calculation to in charge of pipe diameter , is it confirm pipe diameter size and position and sewage waste water design of the inspection shaft after discharging of breather pipe to come from this.

消火栓给水系统消火栓给水系统的设计内容具体包括:根据建筑物性质选择设计参数,包括每支水枪的射流量、消火栓的口径、水枪口径、龙带长度等;消火栓系统计算,具体包括消火栓的布置计算和消防立管和横支管的水力计算;减压孔板的计算;消火栓设施的确定,包括水泵结合起的设置、消防水泵和泵房的要求。

The seventh layer to the 15th layer is high area, adoption north bound descend to of water supply method, pump to supply water to a water tank of the roof from the water supply of the underground garage, then be taken care of the net water supply toward high area by a water tank; Drain the system adoption is a dirty water, the waste water confluence system, the first floor drains alone, draining to sign the tube to establish to stretch the crest to ventilate the tube only, the dirty water was handle by septic tank again rear row to municipal soil pipe net; The fire fight system design becomes to eliminate the fire to bolt to extinguish fire the system, a fire water of the early 10 mins is supply by the fire fight water tank, normal the water supply be pumped by the fire fight Pump from the Saving pond ;The hot water system divides the area circumstance in accordance with the cold system of water, the cold water passes to give or get an electric shock after the heating apparatus concentration heat, again from promote the pump to provide to go together with the pipe line net, The hot water adopt is the closing type machine half circulatory system; The rain water adoption is inside drain the system, rain water direct row to munici p al soil pipe net.

热水采用的是封闭式机械半循环系统,分区情况和冷水系统一致,冷水通过电加热器集中加热后,再由提升泵供向配水管网;雨水采用的是内排水系统,雨水直接排向市政污水管网。

In the invention, the water outlet of a circulating pump is connected with the water inlet of a solar energy collector; a water check valve is arranged on a water circulating pipe between the water outlet of the circulating pump and the water inlet of the solar energy collector; the water outlet of the solar energy collector and the water outlet of a water supply pump are connected with the water inlet of a heating coil; the water inlet of the circulating pump and the water inlet of a drain pump are connected with the outer outlet of the heating coil; the water inlet of the water supply pump is connected with the water outlet of a water storage tank; and the water outlet of the drain pump is connected with the water inlet of the water storage tank.

本发明的循环水泵的出水口与太阳能集热器的入水口连接,水止回阀设置在循环水泵的出水口与太阳能集热器的入水口之间的水循环管路上,太阳能集热器的出水口和补水泵的出水口都与加热盘管的入水口连接,循环水泵的入水口和泄水泵的入水口都与加热盘管的出水口连接,补水泵的入水口与储水箱的出水口连接,泄水泵的出水口与储水箱的入水口连接。

In the case of a pit drain, ensure an adequate air gap exists between the bottom of the drain line and the bottom of the pit .

在坑内排放时,请确保在排放管线和坑底部之间有适当的气隙存在。

Then by use of Price-Mueller (2000) model, the thesis will work out the causes of CF company' s brain drain through the full analysis on environmental variables, individual variables and structure variables that cause CF company' s brain drain as well as the analysis on the investigation of CF company and the company' s own data.

其次,通过对CF公司人才流失情况的调查和公司已有相关资料的分析,运用Price-Mueller(2000)模型,对导致人才流失的环境变量、个体变量、结构变量等要素进行了详尽的考察分析,得出CF公司流失的原因。

Sewer: All kinds of families, hotels, companies, schools and other units of the sewer, all kinds of pipes, Pelton, basin, bathtub, sink, floor drain, toilet, urinal, culverts, kiln wells, septic tanks and other sewer pipe dredge cleaning, sewage pipe dredge cleaning, repair all kinds of taps, MA Barrels of water tank repair and replacement of spare parts, valves, bathtub drain water seepage.

下水道:各类家庭,酒店,公司,学校等单位的下水道,各类管道,水斗,脸盆,浴缸,水池,地漏,马桶,小便池,阴沟,窑井,化粪池等各种下水管道疏通清理,污水管道疏通清理、维修各式水龙头,马桶水箱维修及更换零配件,阀门,浴缸漏渗水。

The present situation in flood-control and waterlog-drain are analyzed, and the present problems are pointed out.2 The causes and characteristics of the floods in Linyi are summarized, and the flood-control project and the waterlog-drain system in Linyi are also introduced.3 On the basis of summarizing the reconnaissance data of engineering geology, the engineering geology conditions of flood-control projects in the city of Linyi are studied, including the floodway project ,the hinge project, the Ge-Jiu Road Bridge project, the No.327 national highway road bridge project, the E-Huang Road Bridge project, and the Xiaogezhuang's chief inverted siphon project in the project of "Bifurcating the Su River to the Beng River".4 Seepage FEM analyses are carried out on the flood-control projects of Yi River, Beng River and Xiaosu River, respectively.

总结了临沂市洪灾成因及洪水特性,介绍了临沂市城市防洪工程和排涝工程。 3、在综合工程地质勘察资料基础上,分析了临沂市城市防洪工程的工程地质条件,包括:&分涑入祊&分洪道工程地质条件分析、&分涑入祊&枢纽工程地质条件分析、&分涑入祊&葛九公路桥工程地质条件分析、&分涑入祊&327国道公路桥工程地质条件分析、&分涑入祊&鹅黄公路桥工程地质条件分析、&分涑入祊&小葛庄总干倒虹吸工程地质条件分析。

第5/47页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".

歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。

This is Kate, and that's Erin.

这是凯特,那个是爱朗。

Articulate the aims, objectives and key aspects of a strategic business plan.

明确的宗旨,目标和重点战略业务计划。