英语人>网络例句>drain away water 相关的网络例句
drain away water相关的网络例句

查询词典 drain away water

与 drain away water 相关的网络例句 [注:此内容来源于网络,仅供参考]

Strengthening, reinforcement, filtering, drain panel for soft, ground handling, geodetic cloth for separating and filtering, artificial lawn for, playground, drain, cloth, roadbed cloth for railway and highway, waterproof material for roof, dyke fortifying cloth, cloth for harbor base, substrate for asphalt, felt, lining cloth for sewer and irrigation canal, soundproof, heat-resisting, material for building

用途:加固、过滤、软基处理排水板、分离、排水用土工布、球场人造草坪、排水布、铁路、公路路基布、屋面防水材料、护堤布、港口基础用布、油毛毡底、下水道、灌渠内衬布、建筑隔音、防热材料等。

In this setup, a Model 4200 Semiconductor Characterization System equipped with two SMUs and PreAmps uses one SMU to supply a constant drain-to-source voltage and measures the resulting drain current.

在此配置中,4200型半导体特性分析系统配备了2个SMU和前置放大器。使用一个SMU来提供恒定的漏-源电压,并测量产生的漏极电流。

There is a drain screw plug at bottom of oil pan for oil drain when changing engine oil.

油底壳下部设有放油螺塞,供更换机油时放油用。

The present situation in flood-control and waterlog-drain are analyzed, and the present problems are pointed out.2 The causes and characteristics of the floods in Linyi are summarized, and the flood-control project and the waterlog-drain system in Linyi are also introduced.3 On the basis of summarizing the reconnaissance data of engineering geology, the engineering geology conditions of flood-control projects in the city of Linyi are studied, including the floodway project ,the hinge project, the Ge-Jiu Road Bridge project, the No.327 national highway road bridge project, the E-Huang Road Bridge project, and the Xiaogezhuang's chief inverted siphon project in the project of "Bifurcating the Su River to the Beng River".4 Seepage FEM analyses are carried out on the flood-control projects of Yi River, Beng River and Xiaosu River, respectively.

总结了临沂市洪灾成因及洪水特性,介绍了临沂市城市防洪工程和排涝工程。 3、在综合工程地质勘察资料基础上,分析了临沂市城市防洪工程的工程地质条件,包括:&分涑入祊&分洪道工程地质条件分析、&分涑入祊&枢纽工程地质条件分析、&分涑入祊&葛九公路桥工程地质条件分析、&分涑入祊&327国道公路桥工程地质条件分析、&分涑入祊&鹅黄公路桥工程地质条件分析、&分涑入祊&小葛庄总干倒虹吸工程地质条件分析。

Major peninsular rivers whose steeper gradients prevent their waters from flooding include the Godavari , the Mahanadi , the Kaveri , and the Krishna , which also drain into the Bay of Bengal;[76] and the Narmada and the Tapti , which drain into the Arabian Sea .

但印度境内的河流包括戈达瓦里河, Mahanadi 河, Kaveri 河和克利须那河,虽然也都同样经孟加拉湾流入大海,由于河流坡度较陡,所有不大容易形成洪水。纳尔默达河和 Tapti 河的河流坡度也较陡,但最后流入阿拉伯海。

Drain away hot water and soak noodle in ice water for 3 minutes.

倒掉滚水把面条浸在冷水中3分钟。

The system is continously operated for two months and the efficiency follows: 65-68% COD〓 reduction, 89-92% BOD〓 reduction, 58-62% TOCl reduction.(The condition of treatment: 35℃-39℃, pH4. 0-4. 5, gas-water ratio: 15-20: 1, retention time: 8-12hr). After the bleaching effluents are further floculated by limewash, the drain away water basically has accorded with the national effluent discharge standard.

控制温度35℃-39℃、pH值4.0-4.5,添加少量简单的营养物、保持15-20:1的实际气水比,接触停留时间8-12小时,连续运行两个月,COD〓去除率保持65-68%,BOD〓去除率89-92%,TOCl去除率58-62%;用石灰水进行混凝后处理,可进一步去除70%COD〓、脱色率90%,SS去除率95%,排水清亮,基本达到国家废水排放标准。

The result shows, grass of Sikkim small hole is temporary decline Yan period with permanent decline water content of Yan period soil is respectively 7.06% be in temporary decline with 6.20%; the Sikkim of Yan period is small after water of Kong Cao answer bibulous and rapid, decline Yan condition is eliminated gradually, appearance of aftertreatment group of answer water 6 H and contrast active of basic consistent;SOD is during threatening processing with markedder than notting have to taking a picture change, the ascendant;CAT that there is certain range after answer water and POD active are in threatening during after rising first, drop, all remarkable prep above contrasts level, and the active;MDA content that still keeps taller after answer water as the extension of time of arid and threatening processing mushroom, to threatening the 8th climate reachs maximum, content of the MDA in the lamina after answer water drops quickly, arrive the 5th day after answer water, content of the MDA in threatening group lamina is adjacent already contrast level.

结果显示,锡金微孔草暂时萎焉期和永久萎焉期土壤含水量分别为7.06%和6.20%;处于暂时萎焉期的锡金微孔草复水后吸水迅速,萎焉状态逐渐消除,复水6 h后处理组外貌和对照基本一致;SOD活性在胁迫处理期间和对照相比无显著变化,复水后有一定幅度的上升;CAT和POD活性在胁迫期间先上升后下降,均显著高于对照水平,且复水后仍然保持较高的活性;MDA含量随着干旱胁迫处理时间的延长而迅速增加,到胁迫第8天时达到最大值,复水后叶片中MDA含量迅速下降,到复水后第5天,胁迫组叶片中MDA含量已接近对照水平。

In allusion to the characteristics that Luannan County is a county which majors in agriculture and its area is small and its water resources allocation is relatively easy and the contradiction of water resources allocation among industries is severe and so on, based on the predicted water supply and demand for Luannan County, water resources multi-objective optimal allocation model is founded. The model are made up of primary object which is that the district economical benefit is most and by-end which is that the district social benefit is most and restricts which contain water supply capability and water transportation capability and water demand capability and so on.

更多分配矛盾较为突出等特点,在滦南县供需水预测成果的基础上,建立了以区域经济效益最大为主要目标、区域社会效益最大为次要目标、以区域供水能力、输水能力、需水能力等因素为约束条件的水资源多目标优化配置模型,根据Excel和Matlab的特点,把Excel作为数据输入端,调用Matlab中的linprog工具函数求解该模型,得到了滦南县水资源优化配置成果。

The result shows that: The variation rhythm of the sensitivity index changed unanimously for Jensen,Blank and Stewart water production functions of spring wheat in Liangzhou city,the volume is small in the former stage,then become large at the middle stage,and less at the last stage. Jensen and Stewart water production functions are better of spring wheat in Gulang County in 1987-1989. The Variation rhythm of water deficiency sensitive index is unanimous: the volume are small at first,then large at middle,and diminish at last. The Variation rhythm of water deficiency sensitive index is unanimous in Jensen,Blank and Minhas of flax in Liangzhou county in 1987-1989. The water deficiency sensitive index in Gulang district in 1987-1989 models bad,are too many minus. 3 Establishing the non-linear model to definitive the irrigation quota and dimension of single crop,according the three prototype Precipitation,allocating the limited water optimally according to full water supply,95 percent,75 percent and 50 percent. Economy benefit is the biggest aim function,so getting three groups for irrigation quota,irrigation dimension and benefit,the biggest benefit is the most optimal result.

结果表明:1985-1986 年凉州春小麦Jensen 模型、Bl(来源:10a1ABC论文网www.abclunwen.com)ank 模型和Stewart 模型的敏感指数变化规律接近一致,在前期较小,中期增大,最后再减小。1987-1989 年古浪春小麦水分生产函数以Jensen 模型和Stewart 模型拟合较好,其敏感指数变化规律比较一致,敏感指标值前期较小,中期增大,后期又减小。1983-1985 年凉州亚麻水分生产函数以Jensen 模型、Blank 模型和Minhas 模型敏感指标值变化规律比较一致:先减小,后增大,最后再减小。1987-1989 古浪亚麻敏感指数出现负值较多,模型拟合较差。3 建立单作物种植条件下灌溉定额与灌溉面积的确定的非线性规划模型,将有限的水量按照充分供水,95%、75%和50%供水来分配水资源,以经济效益最大为目标函数,得出三组灌区灌溉面积和效益结果,其中以效益最大为最优解。

第13/500页 首页 < ... 9 10 11 12 13 14 15 16 17 ... > 尾页
相关中文对照歌词
40 Water
Hot Water Burn Baby
Wade In The Water
Tuxedos
Cool Cool Water
Water Whippin'
Circle The Drain
The Weakends
Drain
I Go Swimming
推荐网络例句

The first thing to do when creating a comic strip is to think or a plot .

编连环画册的第一件事是想出一个情节。。。

It can take advantage of the powerful ability of Nona-tree, which can reach balance among precision, efficiency and storage, and that of wavelet histogram, which can extract texture feature with high efficiency.

最后进一步分析了改进广义MvP一tree性能的两个出发点,提出通过参数优化模型有利于改进广义MVP一tree的搜索性能,并提出基于遗传算法的性能改进思路。

Consequently, it is recommended that vector-based data be used for the characterization of aerodrome features in AMDBs.

因此,建议矢量为基础的数据为特征的机场在 AMDBs 的定性分析。