查询词典 dock
- 与 dock 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Company mainly engages in ship repairing and modifacation project, the geographical position is good, abundant human resources and has a strong management team, the existing area 396000 square meters, wharf length 480 metres, 300 workers, specialized technical personnel are more then 150 people, after years of operation, we are accumulated rich experience in ship repair and technical managementand, company owns a six DWT floating dock (lifting force 15000 tons, 35 meters inner wider, 210 meters in length), equipped with first-class facilities workshop 10000 square meters, 6pcs.of elevated car, 4 sets of 15 tons dock crane , 2 sets of 3060 type portal jib crane, more than 200 sets of equipments, air compressor, lathe, electric welder, CO2 welders etc.
公司主要从事国内外船舶厂内坞修及航修和船舶改造工程,公司所处地理位置佳,人力资源丰富,拥有强大的管理团队,现有土地396000㎡,在建码头480米,职工300人,其中专业技术人员达145人以上,经过多年运营,在船舶修理及改造工程中累积了丰富的船舶修理改造和技术管理经验,公司拥有6万吨级浮船坞一座(举力15000吨,内宽35米,长210米),配备一流的硬件设施厂房10000多平方米,高架车6台,坞吊15吨4台,门吊3060型2台,另有空压机、电焊机、 CO2焊机、车床等各类设备200多台。
-
Agana Naval Support and maintenance facilities is a major logistical maintenance stations and fleet support base, there are two dry dock, floating dock 4, repairable, including aircraft carriers, including all types of vessels.
阿加尼亚海军支援与维修设施是主要后勤保养站和舰队支援基地,有干船坞2座、浮船坞4座,可修理包括航母在内的各型舰船。
-
Decision-making of ballast water adjustment of floating dock is studied as a two-step optimization problem. Two mathematical models are constructed for minimizing the ballast water adjustment quantity of every tank needed and the trim of the floating dock respectively.
将调节浮船坞浮态的调水计划决策问题归结为调节量优化和调水时间优化两步优化问题,分别提出了有约束问题的优化模型并详细介绍了应用惩罚函数法对优化问题进行求解的方法。
-
Further,in illustra- ting the principles of designing an U-shaped floating dock which is used for docking of 10,000 tons-class merchant ship s as an example,the author solved and analyzed the problems regarding to longitudinal strength of floating dock and the ship docked therein with the use of theorem of beams on elastic foundation.
然后以万吨商船为例阐述了浮坞设计的概要,并运用弹性基础梁的理论对浮坞强度计算进行了分析和探讨。
-
Thousand tons of world of distant ship Wu's greatest in Dalian floating dry dock, builder of all previous classics people a year fight bravely difficultly, at present already complete tries put into production, the investment of the biggest floating dry dock uses this world, commerce of will northward to China haven and lay-up market structure produce tremendous effect.
大连中远船务世界最大的30万吨浮船坞,历经建设者们一年的艰苦奋战,目前已竣工试投产,这座世界最大浮船坞的投入使用,将对中国北方港口贸易和修船市场格局产生巨大影响。
-
Debt reduction, taishan petrochemical are focused on Singapore and Malaysia floating dock in China and warehousing and storage, and with the taishan quanzhou business has expanded and docks-he'd spend six ships to float storage tanker and super fujian 100000 DWT dock construction is finished, add in late new chemical storage, nansha phase mainland storage capacity compared to the 2008 new 1.45 times.
减债后,泰山石化正集中精力发展新加坡及马来西亚浮动仓储、及中国仓储码头同泰山泉州修船厂业务,并已扩大浮动仓储至6艘超级油轮,而福建10万吨级码头建设则在去年底完工,加上南沙二期新增化工品仓储,内地仓储总容量对比2008年新增1.45倍。
-
The Vessel has leave to dock and undock, to go into graving dock, to sail or navigate with or without pilots, to go on trial trips and to assist and tow vessels or craft in distress, but it is warranted that the Vessel shall not be towed, except as is customary or when in need of assistance, or undertake towage or salvage services under a contract previously arranged by the Assured and/or Management and/or Charterers without the prior written agreement of the Underwriters.
保险船舶在所有时间根据本保险的各项规定承保,并许可在有或没有引航员的情况下开航或航行,试航及协助,拖带遇险船舶或驳船,但保证保险船舶不得被拖带,除非是习惯性的,或当需要协助时;事先未经保险人书面协议,也不得根据被保险人,船舶所有人,管理人和/或承租人事先安排的合同从事拖带或救助服务。
-
The Vessel has leave to dock and undock, to go into graving dock, to sail or navigate with or without pilots, to go on trial trips and to assist and tow vessels or craft in distress, but it is warranted that the Vessel shall not be towed, except as is customary or when in need of assistance, or undertake towage or salvage services under a contract previously arranged by the Assured and/or Management and/or Charterers without the prior written agreement of the Underwriters This Clause 4 shall not exclude customary towage in connection with loading and discharging
保险船舶在所有时间根据本保险的各项规定承保,并许可在有或没有引航员的情况下开航或航行,试航及协助,拖带遇险船舶或驳船,但保证保险船舶不得被拖带,除非是习惯性的,或当需要协助时;事先未经保险人书面协议,也不得根据被保险人,船舶所有人,管理人和/或承租人事先安排的合同从事拖带或救助服务。
-
1 The Vessel has leave to dock and undock, to go into graving dock, to sail or navigate with or without pilots, to go on trial trips and to assist and tow vessels or craft in distress, but it is warranted that the Vessel shall not be towed, except as is customary or to the first safe port or place when in need of assistance, or undertake towage or salvage services under a contract previously arranged by the Assured and/or Owners and/or Managers and/or Charterers.
1.1 保险船舶允许在有或没有引航员的情况下靠离码头,进干船坞,开航或航行,试航及协助,拖带遇险船舶或驳船,但保证保险船舶不得被拖带,除非是习惯性的,或当需要协助时被拖带至第一个安全港口或地点,也不得根据被保险人,船舶所有人,管理人和/或承租人事先安排的合同,从事拖带或救助服务。
-
The above-mentioned problem is not only related to the harbor waterway, the fore-dock depth, the amount and performance of the fore-dock machine, the process and efficiency of loading and discharging as well as the ingathering and outputting system, multi-transportation management and the policy of the port etc.
这一问题不仅涉及港口航道和码头前沿水深、码头前沿机械设备数量和性能、装卸工艺和效率,还关系到与集装箱港口相匹配的集疏运条件、多式联运组织管理和港口的政策环境等诸多问题。
- 相关中文对照歌词
- Hickory Dickory Dock
- Dock Of The Bay
- Hickory Dickory Dock
- (Sittin' On) The Dock Of The Bay
- (Sittin' On) The Dock Of The Bay
- (Sittin' On) The Dock Of The Bay
- (Sittin' On) The Dock Of The Bay
- (Sittin' On) The Dock Of The Bay
- (Sittin' On) The Dock Of The Bay
- (Sittin' On) The Dock Of The Bay
- 推荐网络例句
-
According to our present broadcasting situation,the thesis proposes using new technology to update and reform the present HFC. It also suggests broadcasting using self-advantage and arranging EPON in order to win the supermarket.
论文从我国广电的现状出发,结合实际,积极倡导采用新技术更新、改造我国现有的HFC网络;倡导广电现阶段利用自身优势,部署EPON网络来赢取市场。
-
A new general kinetic equation was derived in which the effect of the removal of condensation water was taken into account completely, and was applied to the polyesterification kinetic study of AA/HPHP and AA/NPG. It was found that the reaction order of self-catalyzed polyesterification was not constant. For these polyesterifications, the reaction order was 2.5 at a low temperature, while 3.0 at a high temperature.
考虑缩合水的排除对反应体系的影响,用体积浓度单位推导出一个新的聚酯反应总包动力学方程,并应用到AA/HPHP和AA/NPG两个聚酯化反应的动力学研究中,研究发现,自催化聚酯反应的反应级数并不是固定值,对于AA/HPHP和AA/NPG两个聚酯化反应而言,低温时反应级数为2.5,高温时反应级数为3.0。
-
But with the development of industry, the proletariat not only increases in number; it
但是,随著工业的发展,无产阶级不仅人数增加了,而且它结合成更大的集体,它的力