英语人>网络例句>design chart 相关的网络例句
design chart相关的网络例句

查询词典 design chart

与 design chart 相关的网络例句 [注:此内容来源于网络,仅供参考]

Please give the system design scheme of your design or both hardware design block diagram and software flow chart.

请给出你的设计框图,或同时给出硬件设计框图和软件流程图。

The system has the following context: choosing image sampling card, 8253 counter design, speed sensor design, blowgun controlling card design, system module division and computer software flow chart.

其主要内容有:图象采集卡的选取,8253计数器的设计,速度传感器的设计,喷枪控制器的设计,系统模块的划分和计算机软件流程图。

I come from province salt city in Jiangsu, this year is 24 years old, graduating from the half-hardy profession of the University of Suzhou for 07 years, during the period of university in addition to studying this profession, also studied light a design, the programming design, building design, the plant goes together with a view, painting software, mainly is carry on park plane chart to draw, and electronics aspect.

中文自述:我来自江苏省盐城市,今年24岁,07年毕业于苏州大学园艺专业,在大学期间除了学习了本专业之外,还学习了灯光设计,规划设计,建筑设计,植物配景,绘图软件,主要是进行园林平面图的绘制,以及电子方面。

In 2009, Hunan Xiangtan City, the completion of testing of Hospitals Digital Orthophoto map 2440 square kilometers, Zhuzhou City, 1:2000 Orthophoto Map 1143 square kilometers, Changsha County, 1:1000 DLG 174 square kilometers, the completion of Beijing Canton Railway 1:2000 digital strip chart 700 kilometers, as well as the province's 14 highway, long-Hangzhou high-speed rail, light rail and other inter-city design Changzhutan early 1:2000 digital strip chart measuring a total of more than 2800 km, for the whole Provincial important infrastructure building high-quality mapping support.

数字化测绘技术广泛应用于全省各项建设中。2009年,湘测三院完成湘潭市数字正射影像图2440平方千米、株洲市1:2000正射影像图1143平方千米、长沙县1:1000数字线划图174平方千米,完成京广铁路1:2000数字化带状图700千米以及全省14条高速公路、长杭高铁、长株潭城际轻轨等设计前期测量1:2000数字化带状图共计2800余千米,为全省重要基础设施建设提供了优质测绘保障。

this paper researches achieving method of teledata collection system,including data collection,data transmission and data memory of system.then,it expounds design project planned to adopt in hardware and sofeware on the basis of giving flow chart of system signal disposal.hardware design portion includes current monitor,long-distance monitoring terminal and handheld collection facility; software design portion includes data receiving system,data memory system and monitoring system.

该文研究远程数据采集系统的实现方法,包括系统的数据采集部分、数据传输部分以及数据如何存储。之后,在给出系统信号处理流程图的基础上阐述硬件和软件拟采用的设计方案。硬件设计部分包括电流监测器、远程监管终端和手持式采集设备;软件设计部分包括数据接收系统、数据存储系统和监管系统。

Statistics process control ; control chart ; optimum design ; eco nomic design ; semi economic design

统计过程控制;控制图;优化设计;经济设计;半经济设计

The design adopt concentrated ammonia water purification recycling craft. The choice and calculations of the main construction and equipment are made, and also the flow chart, graphic layout plane, the main equipment single unit chart.

设计中采用生产浓氨水的煤气净化回收工艺流程,对煤气净化处理的主要构筑物及设备等进行了选型和计算,绘制了煤气净化回收工艺流程图、平面布置图、主要设备单件图等。

The design process is: to select the best process, drawing process maps, after the material of the process, heat is calculated to select the required specifications for production equipment models, a comprehensive natural conditions, transport, economic and other factors in selecting suitable areas The building addresses, format of the workshop construction, equipment to deal with layout, rendering plant layout, equipment flow chart, response equipment, such as design and graphics, the last of the water, electricity, gas and other public works to estimate the amount of ventilation, heating , environmental protection, fire prevention, safety and health content on to complete the preliminary design of the workshop.

本次设计的过程是:选择最佳工艺流程,绘制工艺流程图,之后对各工序物料、热量进行计算,选定所需生产设备规格型号,综合自然条件,交通,经济等个方面因素选择合适的建厂地址,对车间建筑形式,设备布置进行处理,绘制车间布置图、设备流程图,反应设备的设计与绘图等,最后对水、电、汽等公用工程用量进行估算,对通风、采暖、环保、防火、安全卫生等内容进行阐述,从而完成了车间的初步设计。

The design process is: to select the best process, drawing process maps, after the material of the process, heat is calculated to select the required specifications for production equipment models, a comprehensive natural conditions, transport, economic and other factors in selecting suitable areas The building addresses, format of the workshop construction, equipment to deal with layout, rendering plant layout, equipment flow chart, response equipment, such as design and graphics, the last of the water, electricity, gas and other public works to estimate the amount of ventilation, heating , environmental protection, fire prevention, safety and health content on to complete the preliminary design of the workshop.

本次设计の过程是:选择最佳工艺流程,绘制工艺流程图,之后对各工序物料、热量进行计算,选定所需生产设备规格型号,综合自然条件,交通,经济等个方面因素选择合适の建厂地址,对车间建筑形式,设备布置进行处理,绘制车间布置图、设备流程图,反应设备の设计与绘图等,最后对水、电、汽等公用工程用量进行估算,对通风、采暖、环保、防火、安全卫生等内容进行阐述,从而完成了车间の初步设计。

The progress of complex structure function chart is introduced too. We study the method which we can transform a complex structure to the simple sequence structures in this paper. In addition, several examples on how to design sequence chart are also described i...

分析了复杂结构功能表图的进展情况,提出了将复杂结构转变为单序列结构的方法,并通过举例说明复杂结构功能表图的顺序图设计。

第3/13页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

This one mode pays close attention to network credence foundation of the businessman very much.

这一模式非常关注商人的网络信用基础。

Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.

扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。

There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.

双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。