查询词典 deck bridge
- 与 deck bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Secondly, in the dissertation, the theories and methods of calculation on bridge deck system were discussed, and bridge deck system simplified as a beam was analyzed with the theory of elastically supported continuous beam and the method of deformation compatibility; through the theory of orthotropic plate being applied to analyzing the bridge deck system which was assumed an elastically supported continuous plate, certain theoretical derivations were made and some calculation formulas were given.
其次,本文研究论述了桥道系的计算理论和方法,将桥道系简化为梁,利用弹性支承连续梁理论和变形协调法进行分析;把桥道系视为弹性支承连续板,利用正交异性板理论进行分析,作了一定的理论推导,并给出了相关计算公式。
-
This shows three different deck levels, poop deck, quarter deck, and the lower deck which is the spar deck, it would be 42' wide.
照片显示了三个不同层面的甲板,船尾楼甲板,艉甲板和下甲板,它有42呎宽。
-
Six Bridge": Lu Chan wearing street railway bridge and highway bridge, railway bridge Beihuan wear, road wear of a road bridge, never to wear Western street railway bridge and highway and bridge construction of six bridges."
六桥":露禅大街穿铁路桥和公路桥、北环路穿铁路桥、名园路穿公路桥、永洋大街穿铁路桥和公路桥等六座地道桥建设。"
-
Zhao Xian is the age-old cultural city, many historical sites, with the provincial cultural relics protection for more than 11 of which, Zhaozhou Bridge is the earliest existing, to preserve the integrity of the single shoulder open stone arch bridge, known as the "originator of a bridge in the world" and "Bridge the best in the world," American Society of Civil Engineers has been selected as the 12th Department,"the International Civil Engineering of historical monuments"; Yong-Zhaozhou Bridge and the bridge and said "sister bridge", there are similar; dharani Jingchuang Hailed as "the first Chinese Tower."
赵县是历史悠久的文化名城,名胜古迹众多,拥有省保以上文物11处,其中,赵州桥是现存最早、保存最完整的单孔敞肩石拱桥,被誉为&世界桥梁鼻祖&和&天下第一桥&,被美国土木工程师学会选定为第十二处&国际土木工程历史古迹&;永通桥与赵州桥并称&姊妹桥&,有异曲同工之妙;陀罗尼经幢被誉为&华夏第一塔&。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The invention includes a bridge, a bridge traveling mechanism, a crane trolley, a telescopic boom and a telescopic traveling mechanism; wherein the bridge traveling mechanism drives the bridge to travel longitudinally along the track on elevated beams on the two sides; the crane trolley travels laterally along the track on the bridge; the telescopic boom is arranged between the crane trolley and the bridge, the crane trolley travels laterally along the track on the telescopic boom; and the telescopic traveling mechanism drives the telescopic boom to travel laterally along the track on the bridge.
本发明包括桥架、桥架运行机构、起重小车、伸缩臂和伸缩运行机构;其中,所述桥架运行机构驱动所述桥架沿两侧的高架横梁上的轨道纵向运行;所述起重小车沿所述桥架上的轨道横向运行;所述伸缩臂设置在所述起重小车和所述桥架之间,所述起重小车沿所述伸缩臂上的轨道横向运行;所述伸缩运行机构驱动所述伸缩臂沿所述桥架上的轨道横向运行。
-
It is showed in wind-vehicle-bridge system vibration analysis that cross wind action can remarkably increase the response of bridge and vehicle. Generally, the response of bridge and vehicle are increased with wind speed and train speed, one case that vehicle is on leeward side of deck is more unsafe than another case that vehicle is on windward side of deck. Nonlinear factors can more influence bridge than vehicle.
风—车—桥系统耦合振动分析结果表明:考虑风的作用会显著增加车辆和桥梁的响应;车辆和桥梁的响应总体上随风速和车速的提高而变大;车辆位于桥道背风侧时较迎风侧时更为不利;非线性因素对桥梁的影响较车辆的要大。
-
The invention has the advantages that by means of single film growth craft, supporting structures of a pier, a bridge leg, and a deck are accomplished, thus greatly lowering the difficulty and complicity of the craft; the pier, the bridge leg, and the deck are formed into a trinity, thus assuring the mechanical support of the whole micro bridge to be firmer and to have higher stability; meanwhile, the pier manufactured by means of the single film growth craft has a hollow shape, thus ensuring that the manufacturing process of the electrical channel of the micro-bridge structure is more simple, without the need of tapping in the pier; only simple photoetching craft is needed to guarantee the connection between the electrode at the upper end and the electrode at the lower end.
本发明利用一次薄膜生长工艺完成桥墩、桥腿和桥面的支撑结构,大大降低了工艺难度和复杂性,且桥墩、桥腿和桥面三位一体,使得整个微桥的机械支撑更为牢固,稳定性更高;同时,本发明利用一次薄膜生长工艺制作出的桥墩成空心状,使得微桥结构的电学通道制作过程变得更为简单,无需另外在桥墩中开孔,只需简单的光刻工艺即可保证上端电极和下端电极相连。
-
Broken Bridge of Miaoli original completion in 1907, the bridge with red brick structure which was the arch construction, the bridge deck from the ground 50 meters, the highest mountain railway bridge, was Taiwan's biggest railway bridge, Which was known as the best railway in the art in that time.
苗栗断桥原来完工於1907年,桥身用红砖块搭建而成的拱形建筑,桥面距地面有50公尺,是山线铁路中最高的桥梁,为当时台湾铁路最大的拱桥,在当时还被称为台湾铁路中的艺术极品。
- 相关中文对照歌词
- On Deck
- Stacks On Deck
- King On Set
- London Bridge Is Falling Down
- Hammers On Deck
- Nope
- Bout That Life
- Man Overboard
- Deck The Halls
- Choppas On Deck
- 推荐网络例句
-
A carrier gas such as nitrogen is directed through line 20 and valve 22 to connect with line 26 and mix with the gas sample.
如氮气之类的载体通过管线20和阀22引入,与管线26相通,与气体样品混合。
-
But for the most part, knaves and parasites had the command of his fortune
然而支配他的家产的大多是恶棍和寄生虫。
-
For he that is now called a prophet, in time past was called a seer.
他们就往天主的人所住的城里去了。