英语人>网络例句>deck block 相关的网络例句
deck block相关的网络例句

查询词典 deck block

与 deck block 相关的网络例句 [注:此内容来源于网络,仅供参考]

The results show that, with the same steel consumption, the longitudinal and transverse girder deck scheme is a little better in stiffness, dynamic characteristics and stability than those of the other scheme's. For the dense transverse girder deck scheme, because of no longitudinal beams, the axial forces of the tie beam and the deck slab are higher than those of the other scheme's. The improving rate of the axial force for the deck slab is about 50%. The inside and outside bending moments of the cross beams reduce to below half of the other scheme's. The longitudinal stress of the deck slab is higher on the whole and the traverse stress is less than that of the other scheme's. The maximum traverse stress of the deck slab is below 40% of the other scheme's.

研究结果表明:在材料用量相同时,纵横梁方案桥梁刚度较密布横梁方案的桥梁刚度稍大,桥梁动力特性比后者的优,其稳定性也比后者的强;对于密布横梁方案,由于不设纵梁,系梁和混凝土板承受的纵向力都较纵横梁方案的大,混凝土板增幅达50%左右,横梁面内和面外弯矩则明显减小,都低于纵横梁方案的一半,混凝土板顺桥向应力整体比纵横梁方案的高,而横桥向应力则较低,最大值低于纵横梁方案的40%。

The ratio of the vertical load distributed between the arch rib and the tie beam of the two schemes is the same. For the integral girder deck scheme, the longitudinal beams and the deck slab of endure more axial force compared to the ballast girder deck scheme, especially to the deck slab with a conspicuous increase of the axial force and higher stress, and the tie beam endure less. The force-bearing characteristics of the cross beams under the integral girder deck scheme is obviously better than that of the ballast girder deck scheme, especially at the two ends of each cross beam.

在受力上,与道碴板桥面方案相比,整体桥面方案竖向荷载在拱肋和系梁之间的分配基本相同,混凝土板和纵梁分担的纵向力则相对更大,尤其是混凝土板,增幅较明显,应力水平整体较高,系梁分担的纵向力则得到减小,横梁的受力状况整体桥面方案明显优于道碴板桥面方案,特别是在梁端处。

Basing on the statistic datum existed of bridge deck pavements, analyze the main failure modes and its main causes to damage on different styles of bridge, at the same time, through the big calculation software ,establish the space models to simulate the course of mechanics of bridge deck pavements, analyze the main factors which affect the bridge deck pavement"s mechanics and the relations between them; according to the atmospheric circulation circumstances of bridge deck pavements, take the statistic datum of using life of prefabricated T-beam、box girders and casting girder in region of HUA-NAN as examples to returning analysis ,establishing the life prediction model of this style bridges; associating "the Method of Estimating to Life Cycle Costing,bring forward this method to take a evaluation of economy on bridge deck pavements, insure the life cycle costing reasonable; giving some tactics on the design of bridge deck pavements.

以既有桥梁的桥面铺装层使用现状统计资料为基础,分析了各种类型桥面铺装层的主要破坏形式及其主要损伤原因,同时利用结构分析软件,对桥面铺装层建立空间模型模拟其受力作用过程,分析影响桥面铺装层受力大小的主要因素以及各因素与铺装层受力大小之间的关系;按照桥面铺装层所处环境的不同,以华南地区预制T、箱梁和现浇梁的桥面铺装层正常使用寿命统计数据为例,通过回归分析建立该类型桥面铺装层的正常使用寿命预测模型;利用寿命周期费用评价方法,对特定铺装层的设计方案某一参数的变化所带来的经济效益进行评价;给出桥面铺装层设计构造建议。

The strike of Huanghai block and Huaihai block in the east mainly tends towards north-east, while the strike of Shanxi block and the eastern edge of Ordos block in the west mainly tends towards north-west.(3) According to the feature of Moho, the crust of the research zone can be divided into six parts in the Shanxi block, Moho looks like a nearly north-south sunk belt, and the crust is thick; at the southern edge of the Inner Mongolia block and in the south of Yanshan block, Moho presents the structural features of fold belt, tending nearly towards east-west; at the eastern edge of Ordos block, the structure of Moho is relatively complex with nearly northwest folds.

3根据莫霍面的形态特征,研究区地壳可大致划分为6个区块;在山西地块范围内,莫霍面呈近南北向的凹陷带,地壳厚度大;内蒙古地块南缘和燕山地块南部,莫霍面表现出褶皱带的构造特征,其延展趋势为近东西方向;鄂尔多斯地块东缘,莫霍面构造相对复杂,呈近北西向凸、凹相伴的褶皱;黄淮海地块为莫霍面隆坳区,隆、坳相间排列,构造较复杂,但从整体上看,这是全区莫霍面最浅的隆起区段;鲁西台背斜主要为莫霍面断陷区,其断陷带沿枣庄-曲阜一线向北西方向延伸。

This shows three different deck levels, poop deck, quarter deck, and the lower deck which is the spar deck, it would be 42' wide.

照片显示了三个不同层面的甲板,船尾楼甲板,艉甲板和下甲板,它有42呎宽。

According to block the internal activity of the image block is divided into a flat block and texture block 2 categories, the use of airspace based on the variance detection methods to detect the flat block, and a flat block adjacent block edge adaptive smoothing.

根据块的内部活动性将图像块分成平坦块和纹理块2 类,利用基于方差的空域检测方法检测出平坦块,并对平坦块进行邻块边缘自适应平滑。

First, argumentation of plan. Second ,introduce hardware, theory of monitor, VGA standard and designing of every block, including synchronized signal generating block ,character rom block, moving block, shift block and comparison block .

首先进行了方案论证,其次介绍硬件,监视器的原理,VGA标准以及各个模块的设计,包括:产生同步信号的模块,字符存储器的模块,移动模块,移位模块,比较模块。

The measuring unit includes one heat block, one cooling block, and one sleeve. The facing end of the heat block and cooling block has one loaded plane which forms one loaded cavity with the sleeve in which the heat block and cooling block can be relative move.

所述量测部包括一加热块、一冷却块及一套筒,所述加热块及冷却块相面对的一端分别具有一承载平面,所述承载平面与所述套筒构成一承载腔,且所述加热块与冷却块可于所述套筒内相对移动。

Through similar simulation test of block top-coal drawing, the influence of coal block size and block position in top coal on the recovery ratio and drawing manner is studied. It is found that the drawing manner has the different adaptation to the top coal which has different block distribution. The caving capacity is mainly decided by the block size. The top-coal which has layer difference of block with the same size has different recovery ratio. It is shown, that, to the given top-coal blocks, the recovery ratio of uniformly mixed blocks is maximal in the manner of drawing at interval of one support.

研究表明,顶煤块体大小是影响顶煤回收效果的主要因素,在顶煤块径一定的条件下,块体层位分布不同是造成顶煤回收率差异的主要原因,研究表明各级块度均匀混合时顶煤回收效果最好,块度从下向上增大分布次之,大块为中位顶煤时回收效果最差;各种放煤方式的适应性不同,各级块度均匀混合的顶煤适合用间隔放煤;块度从下向上增大适合用顺序放煤;大块在顶煤中位分布时,中硬煤以下适合用间隔放煤,硬煤应采用顺序放煤方式。

The method includes establishing one reverse mapping list comprising list items; reading the mapping data recorded in the data block state list item area to the list items during system initialization; checking reverse mapping list and finding the data block in Flash memory during reading some logic block; and writing the updated data into the empty data area of one new data block, writing the mapping data between the new logic block and the new data block into the state list item area and updating the mapping data of the corresponding list item in the reverse mapping list during writing some logic blcok.

包括:建立一个由表项组成的反向映射表,一个表项对应一个逻辑块;在系统初始化过程中,将数据块状态表项区中记录的映射信息,按逻辑块号与表项间的对应关系读取到各表项中;读取某逻辑块时,以其逻辑块号作为表项索引查找反向映射表,定位到表项,根据表项中记录的映射信息,在Flash存储器件中查找到数据块;写入某逻辑块时,将更新数据写入一新数据块的空白数据区中和将该逻辑块与新数据块间的映射信息写入状态表项区中,同时更新反向映射表相应表项的映射信息。

第1/500页 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
On Deck
Boy From The Block
Stacks On Deck
Block Boi
Block Party (Remix)
King On Set
I'm A Gangsta
Block Party
A Night To Remember
Fitted Hat Low
推荐网络例句

A carrier gas such as nitrogen is directed through line 20 and valve 22 to connect with line 26 and mix with the gas sample.

如氮气之类的载体通过管线20和阀22引入,与管线26相通,与气体样品混合。

But for the most part, knaves and parasites had the command of his fortune

然而支配他的家产的大多是恶棍和寄生虫。

For he that is now called a prophet, in time past was called a seer.

他们就往天主的人所住的城里去了。