英语人>网络例句>curtain dam 相关的网络例句
curtain dam相关的网络例句

查询词典 curtain dam

与 curtain dam 相关的网络例句 [注:此内容来源于网络,仅供参考]

A brief discussion on seismic design of high arch dams is made through the following three aspects:interaction of arch dams-foundation-reservoir water,dynamic stability of high arch dam abutment ,effect of transverse slots on seismic design of high arch dam,and those aspects referred to above is not enough for seismic design of high arch dam.

对高拱坝的抗震设计进行了分析,包括拱坝坝体-地基-库水动力相互作用分析、高拱坝坝肩抗震稳定分析、横缝对高拱坝抗震设计的影响,仅对高拱坝抗震设计研究的几个方面进行了概括总结。

This article through a double-curvature arch dam gravity abutment project example, uses the "Gong Liang Fenzai" method to extract the stress of th e dam body, satisfies the standard request in the stress under the condition, uses two methods to the arch dam gravity abutment stably carries on the analysis computation.

本文通过一双曲拱坝重力墩工程实例,先用拱梁分载法求出坝体的应力,在应力满足规范要求的条件下,用两种方法对拱坝的重力墩抗滑稳定进行分析计算。

The deformation monitoring items of the dam for Shanxi Hydropower Station include the elevation control network close to the dam area, plane control network of triangulation and trilateral, dam collimation line and settlement monitoring.

珊溪水电站大坝变形监测项目包括近坝区高程控制网和平面边角控制网、坝视准线及沉陷观测。

Chapter 4 and chapter 5 are about simulation methodology. In chapter 4, the design idea and techniques of implementing intelligent simulation of dam concrete placement system are clarified and the simulation research method of separating experiments from models is introduced. On the basis of the research, the simulation function structure frame of dam concrete placement system is constructed, which makes the simulation software system of dam concrete placement become a general-used and intellectualized simulation study environment in which simulation modeling, experiments and analysis are integrated.

第四章和第五章是仿真方法论,第四章主要讨论实现大坝砼浇筑系统智能化仿真的设计思想与方法,并介绍了仿真实验与仿真模型相分离的仿真研究方法,在此基础上构造出大坝砼浇筑仿真系统的功能结构框架,使得大坝砼浇筑仿真系统成为集仿真建模、实验和分析于一体的通用型、智能化仿真研究环境。

It is concluded that because the mica schist is mixed with feeble weathered granite, the grain is broken up severely; the back-analysis parameters of explosion rockfill(3BⅠ)are lower than the results of laboratory triaxial test, and the Duncan E-B parameters obtained by back-analysis of her sandy gravel (3BⅡ)are higher than the triaxial test results of laboratory triaxial test which can not reflect the mechanical behaviors of the dam material objectively; the research should be strengthened in 300 m high rockfill dam construction. The fitting modes of the space displacement field of prototype observation are also explored and it turns out that the results of IGA analysis considering only vertical deformation meet the need of dam's technical accuracy.

结果表明,由于在微弱风化花岗岩掺加云母片岩,颗粒破碎严重,爆破堆石料(3BⅠ)的原级配粗粒料反演参数远低于室内三轴试验成果;与3BⅠ堆石料相反,砂砾料(3BⅡ)现场反演得到的邓肯E~B模型参数高于室内三轴试验值;室内三轴试验成果不能客观反映筑坝材料的力学特性,对于当今的300 m级高土石坝建设,宜加强对原级配粗粒料的力学特性研究;同时对原型实测的空间位移场不同拟合方式进行了探讨,认为仅考虑铅直向变形的IGA参数反演成果能基本满足土石坝工程的精度要求。

The Stewart Mountain Dam located 41 miles (66 km) east of Phoenix, Ariz., on the Salt River, was completed in March 1930. The structure contains an arch dam, two thrust blocks for simulating abutments for the arch dam, three gravity dams, and two spillways.

绪论:Stewart大坝位于亚利桑那州,凤凰岛东部66Km的盐河上,于1930年3月建成,主体结构包括一座拱坝,两座模拟拱坝拱端的推力墩,三座小重力坝和两个溢洪道。

In order to study local scouring field near the pier with sediment control dam, the 3-D velocity field of the pier in monomer model is subtly measured by ADV velocimeter of Sontek. This paper analyses the velocity distribution in the scouring pool of pier and takes turbulent strength distribution in different direction. Three new characters for the local scours of piers with the sediment control dam are analyzed and the dam's applicability is brought forward.

采用Sontek公司声学多普勒测速仪对有拦沙坝防护的模型桥墩附近流场进行了精细测量,对桥墩冲刷坑内三维流速分布进行了分析,给出了冲刷坑内三维紊动特征量的分布,分析研究了有拦沙防护坝时桥墩局部冲刷的三个新特点,提出了拦沙坝的适用条件。

The arch dam is a sort of space shell structure with complicated shapes. The stress level of dam body and the stability condition of abutment rock are the two key indexes to evaluate the safety of arch dam.

拱坝是一种外形复杂的空间壳体结构,坝体的应力水平和坝肩岩体稳定状况是评价拱坝安全性的两个重要指标。

The arch dam shoulders anti-slides stable and the distortion stable question initiates the arch dam safety incident\'s primary cause, is also one of dam area key project geology questions.

拱坝坝肩的抗滑稳定和变形稳定问题是引发拱坝安全事故的主要原因,也是坝区关键工程地质问题之一。

Thermal stress is important in whole dam stress distribution; especially the thermal stress in whole pouring block or long block is the main factor of inducing slit and even endangering dam safety. It is influence arch dam particularly.

温度应力在整个拱坝的应力分布中起重要作用,尤其是整体浇筑或长块浇筑的混凝土坝内的温度应力,是产生裂缝乃至危及坝体安全的主要因素,对拱坝的影响尤为严重。

第6/250页 首页 < ... 2 3 4 5 6 7 8 9 10 ... > 尾页
相关中文对照歌词
My Heart Beats Like A Drum (Dam Dam Dam)
Stupid Love
She Said Yeah
She Said Yeah
Missing
Ying Yang Vs. Lil Jon And The East Side Boyz
You Don't Know Me At All
Rock Bottom
Ring-A-Ling
I'm Just A Little Bit Shy
推荐网络例句

As of Tuesday, Google's results were still censored in China.

截至周二,谷歌的搜索结果仍受中国审查。

In order to make the positive action increase and negative one decrease, the sub-forces of the social factors must be adjusted to form a centripetal force.

在这一过程中,人的主体性发挥是社会有机体健康发展的灵魂。

Objective To investigate the relationship between the telomer ase activity and apoptosis in gastric cancer.

目的为了探讨胃癌组织中端粒酶与细胞凋亡的关系。