英语人>网络例句>cross girder 相关的网络例句
cross girder相关的网络例句

查询词典 cross girder

与 cross girder 相关的网络例句 [注:此内容来源于网络,仅供参考]

A curve coordinate system which is suitable for variable height curved box-girder were established. The flexure, torsion and distortional warping displacement functions were established, and the strain-deformation equations were obtained, a spatial finite element analysis method of trapeziform cross section variable-curvature box-girder with vertical symmetrical axis was also presented.

建立适合于变高度曲线箱梁的曲线坐标系,推导了变曲率、变高度箱梁弯曲、翘曲扭转和畸变的位移方程和应变-位移关系式,提出了具有一个竖直对称轴的变高度变曲率曲线箱梁的薄壁曲梁空间分析有限元方法。

For the steel truss girder with abroad \\\"bridge crane bar assembled Law,\\\" the level of technology and equipment as a result of the limited duration of its long, far from being able to meet China\\\s bridge construction project as requested in the analysis of large-span suspension bridge mountain girder erection difficulties under the premise that after the election raised more than Aizhai Bridge \\\"self-cross-cable crane swing shift\\\" program to set up the main truss, which is mountainous suspension bridge girder erecting another major innovation.

对于钢桁梁,用国外的"桥面吊机杆件拼装法",由于工艺和设备水平所限其工期长,远不能满足中国桥梁建设工期的要求,在分析山区大跨悬索桥主梁架设困难的前提下,经过多方案比选提出矮寨大桥"自行式跨缆吊机荡移"架设主桁方案,这是山区悬索桥主梁架设的又一个重大的创新。

The results show that, with the same steel consumption, the longitudinal and transverse girder deck scheme is a little better in stiffness, dynamic characteristics and stability than those of the other scheme's. For the dense transverse girder deck scheme, because of no longitudinal beams, the axial forces of the tie beam and the deck slab are higher than those of the other scheme's. The improving rate of the axial force for the deck slab is about 50%. The inside and outside bending moments of the cross beams reduce to below half of the other scheme's. The longitudinal stress of the deck slab is higher on the whole and the traverse stress is less than that of the other scheme's. The maximum traverse stress of the deck slab is below 40% of the other scheme's.

研究结果表明:在材料用量相同时,纵横梁方案桥梁刚度较密布横梁方案的桥梁刚度稍大,桥梁动力特性比后者的优,其稳定性也比后者的强;对于密布横梁方案,由于不设纵梁,系梁和混凝土板承受的纵向力都较纵横梁方案的大,混凝土板增幅达50%左右,横梁面内和面外弯矩则明显减小,都低于纵横梁方案的一半,混凝土板顺桥向应力整体比纵横梁方案的高,而横桥向应力则较低,最大值低于纵横梁方案的40%。

The ratio of the vertical load distributed between the arch rib and the tie beam of the two schemes is the same. For the integral girder deck scheme, the longitudinal beams and the deck slab of endure more axial force compared to the ballast girder deck scheme, especially to the deck slab with a conspicuous increase of the axial force and higher stress, and the tie beam endure less. The force-bearing characteristics of the cross beams under the integral girder deck scheme is obviously better than that of the ballast girder deck scheme, especially at the two ends of each cross beam.

在受力上,与道碴板桥面方案相比,整体桥面方案竖向荷载在拱肋和系梁之间的分配基本相同,混凝土板和纵梁分担的纵向力则相对更大,尤其是混凝土板,增幅较明显,应力水平整体较高,系梁分担的纵向力则得到减小,横梁的受力状况整体桥面方案明显优于道碴板桥面方案,特别是在梁端处。

In this dissertation, considering the influence of transverse shearing deflection and noncoincidence of torsion center and gravity center, the equilibrium formulas of variable-curvature box-girder with rectangular cross section were established. Based on deformation expression of arbitrary point on the girder and relationship between inner forces and displacement equations, considering noncoincidence of torsional center and gravity center, the governing differential equations for variable-curvature box-girders were generalized.

针对具有竖直对称轴的矩形断面变曲率箱梁,考虑了挠曲剪切应变和曲梁剪心和形心分离的影响,推导了变曲率箱梁的平衡方程;通过箱梁内任一点的位移方程和内力-位移关系,推导了考虑曲梁剪心和形心分离的变曲率箱梁的挠曲扭转控制微分方程。

For the steel truss girder with abroad \\\"bridge crane bar assembled Law,\\\" the level of technology and equipment as a result of the limited duration of its long, far from being able to meet China\\\s bridge construction project as requested in the analysis of large-span suspension bridge mountain girder erection difficulties under the premise that after the election raised more than Aizhai Bridge \\\"self-cross-cable crane swing shift\\\" program to set up the main truss, which is mountainous suspension bridge girder erecting another major innovation.

对于钢桁梁,用国外的&桥面吊机杆件拼装法&,由于工艺和设备水平所限其工期长,远不能满足中国桥梁建设工期的要求,在分析山区大跨悬索桥主梁架设困难的前提下,经过多方案比选提出矮寨大桥&自行式跨缆吊机荡移&架设主桁方案,这是山区悬索桥主梁架设的又一个重大的创新。

Presenting the calculating method of the space displacement model of skewed box girder, whit main ideas of: dispersing the skewed box girder into some skewed beam segments and further dividing those segments into some plate pieces according to their forms; describing the displacement functions in the plane of plate piece by assuming that the space displacements of any point in the joint line between the plate pieces are described by using Hermite interpolation functions and that two displacements in the plane of plate piece are linear in the cross direction; Using Hermite interpolation functions to describe the bending the displacement of the unit length transverse frame cutting longitudinal from the skew box girder segment; Finally, describing the space displacements of a point in the plate pieces by two displacements in the plane of the plate and one bending displacement of plate.

提出了斜交箱形梁空间位移场的计算方法:将斜交箱形梁沿纵向离散为若干斜梁段单元,依据箱梁的构成进一步将斜梁段划分为若干板段子单元;各板段联结线上任意点的位移按Hermite函数插值,假定各板段的面内位移沿其宽度方向线性变化,以描述各板段面内位移;沿斜交箱梁段的纵向截取单位长度横截面框架,框架各杆件空间位移按Hermite函数插值,以描述各板段面外位移;板段内任意点的空间位移最终以2个面内位移和1个面外位移描述。

The cross girder center segments of the bents were field bolted.

构架横梁的中间段在工地用螺栓连接。

The entire Superstructure cross-section, except for traffic barrier, shall be considered to be placed at one time for purposes of determining support requirements and designing falsework girders for their stresses and deflections, except as follows: For concrete box girder bridges, the girder stems, diaphrams, crossbeams, and connected bottom slabs, if the stem wall is placed more than 5 days prior to the top slab, may be considered to be self supporting between falsework bents at the time the top slab is placed, provided that the distance between falsework bents does not exceed 4 times the depth of the portion of the girder placed in the preceding concrete placements.

整个上部结构截面除交通障碍,应被视为在一个确定的要求和支持他们的设计应力和挠度除,脚手架时间放在梁的目的如下:对于混凝土箱形梁桥,主梁茎,diaphrams,横梁,和连接底板,如果干墙放置超过5天前向顶板,可能被认为是自我支持之间的脚手架本茨当时顶端板放置,只要脚手架茨之间的距离不超过4倍,在前面的混凝土主梁部分存款放在深度。

Two bars of belt chain fire grate; two flakes of small louver fire grate; one middle clamping sheet; one side clamping sheet; two flakes of large louver fire grate; one middle clamping sheet of large louver fire grate; one side damping sheet of large louver fire grate; one roller; two bars of cross girder fire grate; one adapter; two flanges; one valve body.

产品/Product:炉排付片二件;小鳞片炉条二件;中夹板一件;边夹板一件;大鳞片炉条二件;中夹板一件;边夹板一件;滚柱一件;横梁炉排中片二件;阀体一件;适配器一件;法兰二件。

第1/4页 1 2 3 4 > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?