查询词典 cross girder
- 与 cross girder 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The ratio of the vertical load distributed between the arch rib and the tie beam of the two schemes is the same. For the integral girder deck scheme, the longitudinal beams and the deck slab of endure more axial force compared to the ballast girder deck scheme, especially to the deck slab with a conspicuous increase of the axial force and higher stress, and the tie beam endure less. The force-bearing characteristics of the cross beams under the integral girder deck scheme is obviously better than that of the ballast girder deck scheme, especially at the two ends of each cross beam.
在受力上,与道碴板桥面方案相比,整体桥面方案竖向荷载在拱肋和系梁之间的分配基本相同,混凝土板和纵梁分担的纵向力则相对更大,尤其是混凝土板,增幅较明显,应力水平整体较高,系梁分担的纵向力则得到减小,横梁的受力状况整体桥面方案明显优于道碴板桥面方案,特别是在梁端处。
-
V.使交叉,横过,勾划,错过,反对,杂交 be cross get cross be cross with get cross with bear one's cross come home by the weeping cross return by the weeping cross double cross drive the cross make one's cross on a contract No cross , no crown.
使人毛骨悚然先学爬后学走;按部就班;循序渐进。偷偷离开悄悄混进悄悄地过去偷偷溜出爬上;偷偷逼近爬上;偷偷逼近 215-cross n。
-
Look at this girder again, the ornament of the line was Exquisite, it was different from the girder which was in the Cosco.(maybe I didn't see much of the girder in the Cosco. Who think that belongs to the Cosco can show the picture to us.) on seeing this style of this girder, I recognized the saddle iron in Sichuan. Consequently, I don't think it is from the Tibet
再看这个提炼,龙头纹饰刻画得相当精美,纹饰和和常见的中原明清刀提梁相似却并不相同(当然,也许我中原地区提梁也见得不多,哪位觉得这是中原的,不妨贴个纹饰相同的出来看看),看这个提梁的纹饰风格,我不禁想起了这回入川看见的藏族用雕龙头的铁马镫,个人以往风格非常接近,因此,我认为这还是藏区的。
-
For the steel truss girder with abroad \\\"bridge crane bar assembled Law,\\\" the level of technology and equipment as a result of the limited duration of its long, far from being able to meet China\\\s bridge construction project as requested in the analysis of large-span suspension bridge mountain girder erection difficulties under the premise that after the election raised more than Aizhai Bridge \\\"self-cross-cable crane swing shift\\\" program to set up the main truss, which is mountainous suspension bridge girder erecting another major innovation.
对于钢桁梁,用国外的"桥面吊机杆件拼装法",由于工艺和设备水平所限其工期长,远不能满足中国桥梁建设工期的要求,在分析山区大跨悬索桥主梁架设困难的前提下,经过多方案比选提出矮寨大桥"自行式跨缆吊机荡移"架设主桁方案,这是山区悬索桥主梁架设的又一个重大的创新。
-
For the steel truss girder with abroad \\\"bridge crane bar assembled Law,\\\" the level of technology and equipment as a result of the limited duration of its long, far from being able to meet China\\\s bridge construction project as requested in the analysis of large-span suspension bridge mountain girder erection difficulties under the premise that after the election raised more than Aizhai Bridge \\\"self-cross-cable crane swing shift\\\" program to set up the main truss, which is mountainous suspension bridge girder erecting another major innovation.
对于钢桁梁,用国外的&桥面吊机杆件拼装法&,由于工艺和设备水平所限其工期长,远不能满足中国桥梁建设工期的要求,在分析山区大跨悬索桥主梁架设困难的前提下,经过多方案比选提出矮寨大桥&自行式跨缆吊机荡移&架设主桁方案,这是山区悬索桥主梁架设的又一个重大的创新。
-
Presenting the calculating method of the space displacement model of skewed box girder, whit main ideas of: dispersing the skewed box girder into some skewed beam segments and further dividing those segments into some plate pieces according to their forms; describing the displacement functions in the plane of plate piece by assuming that the space displacements of any point in the joint line between the plate pieces are described by using Hermite interpolation functions and that two displacements in the plane of plate piece are linear in the cross direction; Using Hermite interpolation functions to describe the bending the displacement of the unit length transverse frame cutting longitudinal from the skew box girder segment; Finally, describing the space displacements of a point in the plate pieces by two displacements in the plane of the plate and one bending displacement of plate.
提出了斜交箱形梁空间位移场的计算方法:将斜交箱形梁沿纵向离散为若干斜梁段单元,依据箱梁的构成进一步将斜梁段划分为若干板段子单元;各板段联结线上任意点的位移按Hermite函数插值,假定各板段的面内位移沿其宽度方向线性变化,以描述各板段面内位移;沿斜交箱梁段的纵向截取单位长度横截面框架,框架各杆件空间位移按Hermite函数插值,以描述各板段面外位移;板段内任意点的空间位移最终以2个面内位移和1个面外位移描述。
-
The entire Superstructure cross-section, except for traffic barrier, shall be considered to be placed at one time for purposes of determining support requirements and designing falsework girders for their stresses and deflections, except as follows: For concrete box girder bridges, the girder stems, diaphrams, crossbeams, and connected bottom slabs, if the stem wall is placed more than 5 days prior to the top slab, may be considered to be self supporting between falsework bents at the time the top slab is placed, provided that the distance between falsework bents does not exceed 4 times the depth of the portion of the girder placed in the preceding concrete placements.
整个上部结构截面除交通障碍,应被视为在一个确定的要求和支持他们的设计应力和挠度除,脚手架时间放在梁的目的如下:对于混凝土箱形梁桥,主梁茎,diaphrams,横梁,和连接底板,如果干墙放置超过5天前向顶板,可能被认为是自我支持之间的脚手架本茨当时顶端板放置,只要脚手架茨之间的距离不超过4倍,在前面的混凝土主梁部分存款放在深度。
-
Combined with the project general situation,it introduces the whole setting of portal jib crane ,represents the construction process and methods of using portal jib crane batch by batch,consolidation large-tonnage steel box girder,steel girder spanning by using drag put up girder,so to increase the construction progress and construction quality.
结合工程概况,对龙门桁吊的总体布置情况进行了介绍,阐述了利用龙门吊分节段吊装、拼装大吨位钢箱梁,用拖拉架梁进行钢梁架设的施工步骤与方法,从而提高了施工进度和施工质量。
-
A silicon based piezo-electricity socle girder miniature electric generating apparatus is provided with a silica fixing frame, an oxidizing layer, a platinum/titanium lower metallic layer, a piezo-electricity PZT layer, a platinum/titanium upper metallic layer, an electrode insulation protection layer, and a vibrating base; the structure of the silica fixing frame combines the monocrystal silicon wet method etching and dry-etching to process, whose structure is integrated as a whole, and the center part of the structure is in a socle girder shape, which includes a silicium socle girder and a free end mass block; the piezo-electricity power supply device uses a micro-machining technique to integrally machine, and can realize the integration of the power supply and the microelectronic devices.
一种硅基压电悬臂梁微型发电装置,有硅质固定框架1、氧化层2、铂/钛下金属层3、压电PZT层4、铂/钛上金属层5、电极绝缘保护层6、振动底座7构成;硅质固定框架1的结构是利用单晶硅湿法腐蚀和干法腐蚀相结合完成加工,其结构连为一体,其中心部分的结构为悬臂梁形状,包括硅悬臂梁a和自由端质量块b;压电电源装置利用微加工工艺集成加工,能够很好的实现电源、微电子器件集成。
-
Fault condition includes the descent of cable force, sinkage of bridge tower and structure change of the main girder. Data recorded are cable force, girder stress, girder linetype, frequency response function, mode shape and etc.
其中损伤的形式有索力下降、主梁局部刚度变化以及桥塔不均匀沉降等,监测的参数主要有拉索索力、桥面线型、主梁应变等静态参数以及主梁固有频率、频响函数和振型等动态参数。
- 相关中文对照歌词
- Crossfire
- Many Rivers To Cross
- Adorno
- Another Wide River To Cross
- Cross That Line
- The Old Rugged Cross
- Cross My Heart
- Old Rugged Cross
- Did It Ever Cross Your Mind
- Old Rugged Cross
- 推荐网络例句
-
In contrast to the ubiquitous rising-sun-with-rays military flag of the Japanese, Chinese banners and ensigns feature a range of designs.
与遍地都是的太阳军旗不同,中国人的旗帜和徽章设计得各式各样。
-
From their small corner of Feng's Guangzhou headquarters -- a jumble of pink leashes, squeezable rubber steaks, and plastic doggy Santas for Fido's stocking -- Soleil's designers come up with at least five new products a month.
从Feng 设在广州总部的产品展示柜台上可以看到,Soleil的设计师每月至少设计出5件新产品。
-
FFT is important for additive synthesis because it helps us to estimate the values for the oscillators that produce the partials of the synthesised sounds.
FFT对加法合成是很重要的,因为它有助于我们评估产生合成音分音的振荡器的价值。