英语人>网络例句>cross banding 相关的网络例句
cross banding相关的网络例句

查询词典 cross banding

与 cross banding 相关的网络例句 [注:此内容来源于网络,仅供参考]

Steel banding before the foundation set in the center of the cushion, and cross through the center axis for vertical and horizontal, and then through the center ring for radiation tendons and tendon distance and ring the number.

钢筋绑扎前,先在垫层上定出基础中心点,并通过中心点定出纵横十字轴线,再通过中心点定出辐射筋和环筋的距离和环数。

One cycle of operation to take Silo body construction, the construction procedure as follows: steel banding to Silo body gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after Silo body pouring until the completion of cycle.

其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初滑三个行程(即75mm 高度)—→检查滑出混凝土合适度及滑模系统工作状况—→继续浇筑混凝土500mm 高—→再滑升三个行程—→浇筑混凝土至模板上口—→转入正常滑升,每次滑升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。

One cycle of operation to take construction, the construction procedure as follows: steel banding to gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after pouring until the completion of cycle.

其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初滑三个行程(即75mm 高度)—→检查滑出混凝土合适度及滑模系统工作状况—→继续浇筑混凝土500mm 高—→再滑升三个行程—→浇筑混凝土至模板上口—→转入正常滑升,每次滑升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。

In a market economy, enterprises must attach great importance to technological progress, and to take practical actions to achieve universal adoption of concrete admixtures; scored with ribbed steel bars of variable cross-section to replace the glossy steel as the production of prestressed Concrete products and reinforced concrete products, reinforced; concrete mixing system to the early realization of microcomputer control; by roll welding machine to replace the hand-made steel skeleton of banding; centrifugal molding, product testing, as well as a phase of water pressure of the pressurized pipe to achieve the conservation process of automatic control ; vigorously promote energy conservation, etc.

在市场经济条件下,企业必须高度重视技术进步,并采取可行的措施,尽快实现普遍采用混凝土外加剂;用带肋刻痕的变截面钢筋取代光面钢筋作为生产预应力混凝土制品和钢筋混凝土制品的配筋;混凝土搅拌系统要尽早实现微机控制;用滚焊机取代手工绑扎制作钢筋骨架;离心成型、产品水压检验以及一阶段制管的加压养护过程实现自动控制;大力推广节能养护窑等等。

推荐网络例句

I didn't watch TV last night, because it .

昨晚我没有看电视,因为电视机坏了。

Since this year, in a lot of villages of Beijing, TV of elevator liquid crystal was removed.

今年以来,在北京的很多小区里,电梯液晶电视被撤了下来。

I'm running my simile to an extreme.

我比喻得过头了。