英语人>网络例句>critical path analysis 相关的网络例句
critical path analysis相关的网络例句

查询词典 critical path analysis

与 critical path analysis 相关的网络例句 [注:此内容来源于网络,仅供参考]

Critical path analysis is brought forward for parallel programs.

提出了对并行程序的运行过程进行关键路径分析。

Hardware architecture and critical path analysis are also introduced.

给出了硬件结构图及关键路径分析。

Much of the knowledge and many of the tools and techniques for managing projects are unique to project management, such as work breakdown structures, critical path analysis, and earned management.

管理项目所需的许多知识和许多工具和技术都是项目管理独有的,如工作分解结构、关键路径分析和实现价值管理。

A critical path analysis using computer techniques.

一种使用计算机技术的关键通路分析方法。

Thus, many construction projects have a planned project programme which has been developed using computerized critical path analysis software.

因此,很多承包商通过运用关键路径分析软件对其已制定的进度计划进行优化。

Performing Critical Path Analysis on this sequence allows you to work out possible parallel sequences (ie tasks that can be performed simultaneously).

表演关键路径分析就这一序列可让您的工作的可能并行序列。

4 Relationship to Other Management Disciplines -16- Documents www.pmway.com Much of the knowledge needed to manage projects is unique to project management (e.g., critical path analysis and work breakdown structures).

管理项目所需的许多知识是专用于项目管理的(如关键路线法和工作分解结构)。

CPA stands for Critical Path Analysis - its the critical dates that must be acheived in order to make the delivery date.

CPA 代表紧要关头的路径分析-它的紧要关头的日期必须为了要约订递送日期,是 acheived 。

Through analysis of system variables, system variables and the relationship between the operating system analysis and critical path analysis back links, a knowledge innovation project system operating model;on the four elements of technology assessment design analysis, research evaluation system built the basic framework.

本文对中国科学院开展知识创新工程在科技布局的调整和优化、组织机构调整以及运行机制改革与管理创新等方面取得的实际成效进行了实证分析,提出了相关的政策建议。

Develop project plans including work breakdown, project milestones, critical path analysis, risk management, cost/benefit analysis, staffing plans, project timelines, and project budgets.

职责:1。制定项目计划,包括工作分解,项目里程碑事件,关键路径分析,风险管理,成本/利润分析,人员配置计划,项目进度安排和项目预算。2。

第1/3页 1 2 3 > 尾页
推荐网络例句

The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.

此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。

To get the business done, I suggest we split the difference in price.

为了做成这笔生意,我建议我们在价格上大家各让一半。

After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.

一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。