英语人>网络例句>cost-plus 相关的网络例句
cost-plus相关的网络例句

查询词典 cost-plus

与 cost-plus 相关的网络例句 [注:此内容来源于网络,仅供参考]

The simple film only cost $813,000 to produce, half the cost of Snow White, less than a third of the cost of Pinocchio, and certainly less than the expensive Fantasia.

这个简短的电影只耗资813,000美元,相当于《白雪公主》一半的费用,还不到《皮诺曹》成本的三分之一、更少于昂贵的电影《幻想曲》。

In the meantime, the analysis result of health insurance utilization is same as foreign countries' study result, that is, teeth fluoridation may reduce dental treatment cost and utilization of dental care service. In addition, the assumption in this research model, cost-benefit effectiveness analysis shows that present fluoridation benefit cannot cover its own cost.

虽然成本效益分析并非卫生政策唯一考量因素,但鉴於政府财政有限,在目前公共支出逐年增加的情形下,如何有效防龋又符合成本效益,应为可讨论之议题,希望透过本研究,可以提供政府作为预算资源配置或卫生政策修订之参考。

While there are some problems in current cost management system that can not satisfy with the demands, hence there needs a new cost management system to grantee the economic profits of the construction companies——the responsibility cost management.

而当前的成本管理制度上存在一定的问题,不能满足要求,需要采用一种新的成本管理机制来保证施工企业的经济效益,这就是责任成本管理。

On the premise of carrying out responsible cost , it is an effective method for a business to bring about cost control of hierarchal multilevel to restrain the rapid of product cost.

在企业实行责任成本制进而实现成本分级递阶控制是遏制产品成本飙升的有效方法。

When the cost coefficients are fuzzy, the total assignment cost will be fuzzy as well. The Yager's ranking method is utilized to transform the fuzzy cost coefficients into crisp value, then the firm's optimal policy can be determined via the classical Hungarian method.

当指派人员执行各项工作的成本系数为模糊数值时,厂商的总指派成本亦为模糊数值,本研究的构想乃在於利用Yager 的模糊数值排序法,先将成本系数的模糊数值转换为明确数值,之后再利用传统的匈牙利法进行求解。

Works are expected to become a generation of software products, the volume of steel two-in-one software project to create a building of reinforced concrete hybrid computing model, BOQ software standards the first to adapt to national unity has become a model for the industry. In 2004, the industry can make the concept of data centers, engineering data to build professional web sites to provide data services. In 2005, the company launched Project Cost Management System, in the tools software, data services, cost management began three areas to provide customers with a comprehensive project cost computing services. In 2006, the company will focus on project management, systems management for industry to shape the revolutionary professional computing platforms for clients to build project management system.

工程预算软件成为一代精品,钢筋工程量二合一软件开创建筑钢筋、混凝土混合计算模式,工程量清单软件率先适应全国统一标准,成为行业典范。2004年,公司为行业提出数据中心概念,建立专业工程数据网站,提供数据服务。2005年,公司推出工程造价管理系统,在工具软件、数据服务、造价管理三个方面开始为客户提供全面的工程造价计算服务。2006年,公司将致力于工程管理领域,为行业走向系统管理塑造革命性的专业计算平台,为客户打造工程管理体系。

The second section finds the problems of costing and cost management in the commercial bank through analyzing the status quo. The problems are that the commercial bank of China only pays attention to command of explicit expense, but overlooks implicit cost and opportunity cost. And the commercial bank of China has not the conception of value chain.

第二部分本论文通过分析目前我国商业银行成本核算和成本管理的现状,找出其成本核算和管理中存在的问题,即注重显性费用的控制,忽略隐性成本、机会成本的支出,缺少系统的价值链观念。

The imputed treatment of the industrial pollution only considered the environmental cost under current treatment techniques rather than the treatment cost when the pollutant has been diffused, where the imputed cost would become much larger.

当年虚拟治理的工业污染只考虑了现行治理水平下的环境成本,而污染物实际扩散后的环境治理成本将远远大于计算的虚拟环境成本。

However, incarcerate the limitation of current enterprise organizational structure, value chain cost control has defects in enterprise's internal, including omission of cost control subject and cost control disjoint with external market.

然而,囿于企业现行组织形式的局限性,价值链成本控制存在企业内部成本控制主体缺位,成本控制与外部市场脱节的问题。

3The Employer shall repay to the Contractor any increased cost of or incidental to the execution of the Works, other than such as may be attributable to the cost of reconstructing work condemned under the provisions of 20 hereof, which is howsoever attributable to or consequent on or the result of or in any way whatsoever connected with the said special risks, subject however to the provisions in this hereinafter contained in regard to outbreak of war, but the Contractor shall as soon as any such increase of cost shall come to his knowledge forthwith notify the Employer thereof in writing.

3除了可归因于重建本合同第 26 条规定的被决定废弃的工程的费用之外,发包方应当向承包方偿付任何增加的费用或执行工程的杂费。这些费用可归于特殊风险或在某种意义上与所说的特殊风险相联系,且无论如何以本条下面包括的有关战争爆发的规定为条件,但承包方一知道任何这种费用的增加就应当立即以书面方式通知发包方。

第16/100页 首页 < ... 12 13 14 15 16 17 18 19 20 ... > 尾页
相关中文对照歌词
High Cost Of Low Living
Paying The Cost To Be The Boss
Payin' The Cost To Be The Boss
You Can't Measure The Cost
Cost Of Love
Love Cost
Game Gonna Cost A Fee
Cost Of Love
Find The Cost Of Freedom
Cost Of Livin'
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?