英语人>网络例句>cost-effectiveness analysis 相关的网络例句
cost-effectiveness analysis相关的网络例句

查询词典 cost-effectiveness analysis

与 cost-effectiveness analysis 相关的网络例句 [注:此内容来源于网络,仅供参考]

Through the establishment of the mathematical model of retail merchant's ordering strategy and supplier's ordering decision-making in whether there is in information sharing situation or not, this has carried on the key analysis and the elaboration to the information sharing value, and comes to the conclusion that the value of information sharing is based on the reduction of the cost in stock of the supplier and finds the corresponding calculational method.

通过建立零售商的订货策略和供应商在有无信息共享的情况下的订货决策的数学模型,本文对信息共享价值进行了重点分析与阐述,并得出信息共享的价值来源于供应商库存成本的减少的结论以及相应的计算方法。

The plan design with many kinds of material to be selected, cost analysis and economic profits comparison have been made by application of plasterboard and rock wool used as partitions between households、r.

本文以纸面石膏板、岩棉进入商业、民用建筑的分户、分室、卫生间、厨房间内隔墙或吊顶以及外墙内保温中的应用,作出了多种选材方案设计、造价分析和经济效益比较。

All-in costs.LIFE-CYCLE COSTING - A cost-analysis tool that incorporates the purchase price of a piece of equipment and all operating and related costs over the life of the item; including, but not limited to maintenance, downtime, energy costs, as well as salvage value.

产品生命周期成本法–一个成本分析的工具,不但分析公司设备的采购价格,也分析其使用年限间的运作及相关成本,包括维修、停机时间、能源成本等、以及废物利用的价值。

After graduating from self-loving gradually VB programming, has automated the preparation of the Maori blessing calculator so that the company calculated the cost of a lot of convenience, to the AU after a computer automatically calculate coordinates substitute comparison t able to improve efficiency and analysis Repair yields, in the end of August from the beginning of the use of Excel VBA turn carried by the use of Visual Basic programming, simply by the beginning of the coordinates of the aircraft in fixed and gradually perfect its functions, after numerous functions perfect, update d version , until now automatically value, take a few screens to install and keep other aircraft types, Cell coordinates and coordinate simultaneous COF, simultaneously hard and soft keyboard input, question is valueTo prevent failure, point and thread type of undesirable precise positioning the cursor, 4 Operational functions to four 40-inch production line, the company can save costs 6333822.717 RMB.

自毕业后逐渐爱好VB编程,曾为福大自动化编写毛利计算器,使公司的成本计算方便了许多,入友达光电后便有了使用电脑自动计算代替坐标对照表来提高分析效率及Repair良率,于8月底由刚开始的使用Excel所带的VBA转而使用VB编程,由刚开始单纯的坐标计算及机种固定逐步地完善其功能,经过无数次的功能完善、版本更新,直到现在的可自动取值、屏幕取数、设置其它机种并保存、Cell坐标及COF坐标同步计算、软硬键盘同步输入、待算值防呆、点及线类不良精确定位光标、四则运算等功能,以4条40寸生产线计算,可为公司年节省成本6333822.717RMB。

After graduating from self-loving gradually VB programming, has automated the preparation of the Maori blessing calculator so that the company calculated the cost of a lot of convenience, to the AU after a computer automatically calculate coordinates substitute comparison table to improve efficiency and analysis Repair yields, in the end of August from the beginning of the use of Excel VBA turn carried by the use of Visual Basic programming, simply by the beginning of the coordinates of the aircraft in fixed and gradually perfect its functions, after numerous functions perfect, updated version , until now automatically value, take a few screens to install and keep other aircraft types, Cell coordinates and coordinate simultaneous COF, simultaneously hard and soft keyboard input, question is valueTo prevent failure, point and thread type of undesirable precise positioning the cursor, 4 Operational functions to four 40-inch production line, the company can save costs 6333822.717 RMB.

自毕业后逐渐爱好VB编程,曾为福大自动化编写毛利计算器,使公司的成本计算方便了许多,入友达光电后便有了使用电脑自动计算代替坐标对照表来提高分析效率及Repair良率,于8月底由刚开始的使用Excel所带的VBA转而使用VB编程,由刚开始单纯的坐标计算及机种固定逐步地完善其功能,经过无数次的功能完善、版本更新,直到现在的可自动取值、屏幕取数、设置其它机种并保存、Cell坐标及COF坐标同步计算、软硬键盘同步输入、待算值防呆、点及线类不良精确定位光标、四则运算等功能,以4条40寸生产线计算,可为公司年节省成本6333822.717RMB。

After graduating from self-loving gradually VB programming, has automated the preparation of the Maori blessing calculator so that the company calculated the cost of a lot of convenience, to the AU after a computer automatically calculate coordinates substitute comparison table to improve efficiency and analysis Repair yields, in the end of August from the beginning of the use of Excel VBA turn carried by the use of Visual Basic programming, simply by the beginning of the coordinates of the aircraft in fixed and gradually perfect its functions, after numerous functions perfect, updated version , until now automatically value, take a few screens to install and keep other aircraft types, Cell coordinates and coordinate simultaneous COF, simultaneously hard and soft keyboard input, question is valueTo prevent failure, point and thread type of undesirable precise positioning the cursor, 4 Operational functions to four 40-inch production line, the company can save costs 6333822.717 RMB, Amateur using VB programming staff prepared the examination system has been applied to AUO Xiamen plant, and is the level of expand to other plant.

自毕业后逐渐爱好VB编程,曾为福大自动化编写毛利计算器,使公司的成本计算方便了许多,入友达光电后便有了使用电脑自动计算代替坐标对照表来提高分析效率及Repair良率,于8月底由刚开始的使用Excel所带的VBA转而使用VB编程,由刚开始单纯的坐标计算及机种固定逐步地完善其功能,经过无数次的功能完善、版本更新,直到现在的可自动取值、屏幕取数、设置其它机种并保存、Cell坐标及COF坐标同步计算、软硬键盘同步输入、待算值防呆、点及线类不良精确定位光标、四则运算等功能,以4条40寸生产线计算,可为公司年节省成本6333822.717RMB,业余利用VB编程编写了员工考试系统,现已应用于友达光电厦门厂,并正水平展开到其它厂区。

It is shown through the living example analysis that, with the Complex Sequential Sampling Decision Technique, the sampling cost may be cut down by a big margin for the same bio-population under the conditions of given degrees of accuracy and confidence.

实例分析表明:对于同一种生物种群,在一定的精度和置信水平要求下,复序贯抽样决策方法可以大幅度地节约抽样成本。

From saves the cost, raises the office efficiency angle embarking, passes to the enterprise present situation and the computer layout condition analysis, chooses a set of appropriate topology to form the confined network construction plan.

从节约成本,提高办公效率的角度出发,通对企业现状及计算机布局状况的分析,选择一套合适的拓扑结构形成局域网络建设方案。

According to an analysis of real estate research institutions who, because of the premium and related taxes and fees to pay at 70 years, which means housing costs accounted for 50% more than the premium and related taxes and fees in the sales when you just need to pay the seventieth, and the rest in the remaining 69 years to pay, respectively, a decrease of (70-1)/ 70 = 98.57%, and in house prices, the cost of a decrease of 50%× 98.57%= 49.29%.

据分析,房地产研究机构谁,因为保险费和相关税费支付70年,这意味着住房费用占50 %以上的溢价和相关税费在销售时,你只需要第七十支付,其余在剩余的69年支付,分别下降了( 70-1 )/ 70 = 98.57 %,并在房价的成本减少了50 %× 98.57 %= 49.29 %。

The ratio of direct cost is the top one input variable which is needed to be reduced to certain level for efficiency improvement through our slack variable analysis.

而由差额变数分析得知,投入变数部份皆有须减少投入的情况,其中须灭少比例较多之投入变数为直接成本率。

第30/44页 首页 < ... 26 27 28 29 30 31 32 33 34 ... > 尾页
推荐网络例句

The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.

此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。

To get the business done, I suggest we split the difference in price.

为了做成这笔生意,我建议我们在价格上大家各让一半。

After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.

一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。