查询词典 cost-effectiveness analysis
- 与 cost-effectiveness analysis 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
On the base of economic marginal analysis, and in the combination with the dialectical relation between cost and productiveness , this paper points out the ways of improvement and optimization so as to the largest profit can be achieved by enterprises.
在经济边际分析的基础上,再结合成本与效率的辩证关系,提出了改进成本与效率的途径,使之最优,以实现企业利润最大化。
-
In the information era, there are many multimedia equipments in market, people can not use most of them freely. As a cost-effective system, SVS comes to undertake this role by providing professional large-screen display system and intelligent control system in overall. SVS insist to designing and producing large screen system, covering the products that based on projection technology, such as projector, projection TV, plasma, LCD TV, projection screen, video booth, Whiteboard, writing screen, big-screen mosaic system, matrix interface, video conferencing, central control system and other related accessories.Relying on a high level ideal of "creation and practical", with high-quality technology, market development and service team, SVS is in a fast lane of development. Since was built in 2003, has SVS achieved widespread attention and recognition in field, and established a good relationship with IT media, supporting manufacturers and industry research institutions, always thinking customers' demand and provide specific programs by Symposium, three-dimensional-type promotion, performance monitoring and analysis.
信息化时代,多媒体设备层出不穷,让人措手不及,无法真正去灵活运用,搭配出最佳适合用户需求的高性价比系统,SVS勇于承担这个角色,专业成就大屏幕显示系统与智能化控制系统整体方案设计及制造,SVS自始至终以大屏幕为主线,涵盖了以投影技术为基础或依托所开发、搭配或衍生的产品,包括投影机、背投电视、等离子、液晶电视、投影屏幕、视频展台、电子白板、书写屏、大屏幕拼接系统、矩阵接口、视频会议、中央控制系统及其他相关配件或零组件,公司依托一支具备"作风严禁、勇于创新、讲求实效"的高层次、高素质的技术开发、市场开拓及服务人才队伍,SVS正在惊人地快速发展,自创建以来,已经在业内取得了广泛的关注与认同,与IT媒体、配套生产商以及行业研究机构建立了良好的合作关系,始终以客户的需求为中心,帮助客户提供专项设计方案,专题讨论,立体式推广,效果监测和用户分析等各种服务,最大限度地方便客户,为客户提供解决方案,不断满足客户多样化、个性化、复合化的需要,帮助客户以最少的成本获取最大的收益。
-
This paper mainly used the quantitative and qualitative analysis to study the cost of education service.
本论文主要采用定量分析与定性分析相结合的方法对教育服务产品的成本进行探讨。
-
Based on the information-scheduling models and time-delay models of networked control system, state-estimate-based and parity-relation-based fault diagnosis approaches and passive fault-tolerant control such as integrity control for networked control systems are presented; 2 we presented new models, Quasi T-S models, for linear and nonlinear networked control systems with random time delays, and the corresponding fault diagnosis and fault-tolerant control approaches; 3 With all these fault diagnosis theory presented, active fault tolerant control approaches are developed directly for networked control systems; 4 Some analysis, design and optimization theory for networked control systems are presented., such as robust control, LQ guaranteed cost control, modeling and control for stochastic networked control and integrated optimization etc.
给出了诸如网络化控制系统的鲁棒控制、LQ保成本控制、联合优化设计、随机网络化控制系统的建模与控制等方面的结果。
-
The veracity and rapidness of manufacturing cost estimation can not only be propitious to the control and management of enterprise's activities but also influence the enterprise to execute market analysis and the consistency of product data.
准确、快速估算制造成本,不仅便于企业的生产活动的控制和管理,而且直接影响企业对市场的分析和产品数据的一致性。
-
Iii "Cost of restoration and repair" includes all actual and projected costs of curation, disposition, and appropriate reburial of, and consultation with respect to, the cultural heritage resource; and any other actual and projected costs to complete restoration and repair of the cultural heritage resource, including its reconstruction and stabilization; reconstruction and stabilization of ground contour and surface; research necessary to conduct reconstruction and stabilization; the construction of physical barriers and other protective devices; examination and analysis of the cultural heritage resource as part of efforts to salvage remaining information about the resource; and preparation of reports.
"复原和修复成本"包括所有实际的和将发生的修补、安置和适当的埋藏文化遗产资源,并与有关方进行协商成本;所有实际的和将发生的完成复原、修复文化遗产资源的成本,其包括重建或加固成本;重建或加固围路曲面和表面成本;进行重建或加固所必须的研究成本;建设栅栏或其他保护设施的成本;作为抢救文化遗产资源残余部分努力之一的检查和分析文化遗产资源成本;撰写报告的成本。
-
Customer Relationship Management concepts which are examined as Imperatives for 21st century e-Business are: 1 Customer Lifetime Value; 2Customer Acquisition Cost; 3 Split-Run Testing; and 4 Recency, Frequency, and Monetary Value Analysis.
客户关系管理概念在21世纪电子商务的发展是必需的:1顾客终身价值分析;2)客户获得成本;3)分离-运行测试;4)近因,频率和货币价值分析。
-
Because of lack of abstraction at the stage of requirement analysis, the traditional Management Information systems of Engineering Designing Project are not suitable to dynamic recomposition of business management process. This paper will combine Workflow Technologies with Management Workflow System of Engineering Designing Project. By decomposing work into good-definitioned tasks and roles and executing and monitoring them according to rules and processes, we can boost efficiency, reduce cost, enhance level of business management of engineering design department.
传统的工程设计项目管理信息系统在需求分析阶段缺乏高度的抽象性,使得最终的需求模型无法适应管理业务流程的动态重组,本文将结合正在研发的工程设计项目管理信息系统集成工作流技术,将业务处理工作分解成定义良好的任务和角色,并按照一定的规则和过程予以执行和监控,达到提高办事效率,降低生产成本,改善工程设计单位生产经营管理水平和竞争力的目标。
-
There also needs to be deep analysis of the impact of reconfiguration on the design's cost and power consumption.
还需要深入分析的影响,重新设计的成本和电力消耗。
-
In this paper, we study static off-line and dynamic on-line algorithms of data repartition to improve the disk load balance. Then we described a lab to analysis the CPU cost of these algorithms.
本文提出了SN结构下并行数据库的静态和动态重划分算法,以及针对轮转重划分的静态算法,理论分析和实践表明算法是正确可行性的。
- 推荐网络例句
-
The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.
此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。
-
To get the business done, I suggest we split the difference in price.
为了做成这笔生意,我建议我们在价格上大家各让一半。
-
After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.
一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。