英语人>网络例句>cooling system 相关的网络例句
cooling system相关的网络例句

查询词典 cooling system

与 cooling system 相关的网络例句 [注:此内容来源于网络,仅供参考]

There are generally two kinds of cooling systems: water cooling system and air cooling system.

一般有两种冷却系统:水冷系统和空气冷却系统。

According to the present situations of the two production lines and the temperature needed by the producing technics of the heat-exchanger , using the numerical simulation with the Airpark software to analyze the reason why the cooling system can not meet the technicals requirement; with the heat transfer theory computation based on the heat transfer principle, the technical parameters of the cooling sect refer to the system technic and configuration are obtained. That are made for reasonable organization of the airflow of the cooling system and the new cooling equipment achieving the technical requirement. At the same time, it will ease the thermal pollution of the circumjacent environment and improve IAQ of the workshop

根据某厂两条换热器生产流水线的现状和冷却降温的工艺要求,用Airpark 软件进行数值模拟,分析了冷却系统无法满足工艺要求的原因;运用传热学原理进行了设备与环境的传热理论分析和计算,分析了冷却系统无法满足工艺要求的原因,得出了改造所需要的技术与结构参数,并对冷却系统进行合理布局与气流组织,使新的冷却系统发挥了应有的作用,满足了生产工艺的要求,同时也减轻了生产环境的热污染,提高了环境的空气品质。

Through simulation in computer using the all-purpose computer simulation software secondary cooling in slab continuous casting and test results, the influence of the factor such as casting speed, casting temperature, shell thickness and secondary cooling system are analyzed. The secondary cooling system is evaluated, the reasons of crack are analyzed. And the solution scheme is obtained. Strand temperature is measured on site in Basteel.

应用仿真软件和实验数据对宝钢1930铸机进行了仿真计算,分析了拉速、配水制度、过热度对铸坯温度场和坯壳厚度的影响;对宝钢1930铸机的二冷制度进行了评估,分析了产生裂纹的原因;并对二冷制度进行优化,提出了改进建议。

Carlos CAROSS commonly used air-conditioning modules from the basic cooling capacity 18KW to 200KW, with a single module and dual cooling system cooling system module.

卡洛斯CAROSS空调的常用基本模块从18KW到200KW制冷量,有单制冷系统模块和双制冷系统模块。

The laser diode system is composed of three external cavity diode lasers and four injection diode lasers and a tapered amplifier. Four laser beams as 40K and 87Rb cooling and repump lights are obtained by using acoustic optic modulators to offset the frequencies from the three ECDL lasers. Four light beams with the different frequencies are injected into four slave lasers for injection locking, then Rb cooling light, K cooling light and K repump light are injected into a semiconductor tapered amplifier in a master oscillator-power configuration.

采用三台外腔光栅反馈半导体激光器、四台注入锁定激光器和一台半导体激光放大器组成激光系统,三台外腔光栅反馈半导体激光器通过声光调制器产生四束光,分别作为40K和87Rb原子的冷却光和再抽运光,四束不同频率成份的激光分别注入锁定四台从激光器,然后Rb cooling光、K cooling光和K repump光再同时注入半导体激光放大器进行放大。

They are generally two different types of cooling system:water-cooling system and air-cooling system.

他们通常是二个不同的类型冷却系统:水-冷却系统和空气-冷却系统。

They are generally two different types of cooling system: water-cooling and air-cooling system.Water-cooling syetem is more common.

它们一般是两种不同类型的冷却系统:水冷和风冷system.water冷却syetem更为常见。

Main contents of the thesis are as follows: Description of the present usage of liquid cooling system, presentation of a new type of liquid cooling system and description of its work principles; Design of the liquid cooling system, which mainly deals with the design and collating calculating of serpentine condenser and heat exchangers adopted in this system. Meanwhile, the model chosen calculating of compressor、thermal expansion valve、plate evaporator、water pump and the like equipment used in the system are also carried out.

本文的主要内容如下:对液冷源使用现状进行了描述,提出了一种新型液冷源系统并对其工作原理进行了阐述;对系统进行了设计,主要对系统中所采用的管带式冷凝器和水侧空/液换热器进行了设计和校核计算,同时对系统中所用到的压缩机、热力膨胀阀、板式蒸发器、水泵等配套设备进行了选型计算;分别对制冷系统和冷却液循环系统进行了数学建模。

The main cooling system of the wind driven generator provided by the invention comprises a hydraulic pressure station heat exchanger, an electric generator heat exchanger, a gearbox heat exchanger, a gearbox temperature controlling valve, a generator temperature controlling valve, a main cooler and a cooling pump, wherein, the dimensional length of the cooling plate of the main cooler is 1 to 2 percent larger than the length of the original cooling plate, the thickness is 2 to 3 percent larger than that of the original cooling plate, and the width is not changed.

本发明的风力发电机主冷却系统,包括液压站热交换器、发电机热交换器、齿轮箱热交换器、齿轮箱温控阀、发电机温控阀、主冷却器和冷却泵,其中,所述主冷却器的散热板尺寸长度比原来散热板的长度大1%-2%,厚度比原来散热板的厚度大2%-3%,宽度不变。

To this end, this paper new Horizontal Two-cylinder diesel engine cooling system and lubrication system design requirements. reference to the existing diesel engine cooling system and lubrication system structure, Diesel right T2100 cooling and lubrication system for the design and analysis.

为此,本文针对新型双缸卧式柴油机冷却系统和润滑系统的设计要求,参考现有柴油机冷却系统和润滑系统结构,对T2100柴油机冷却及润滑系统进行了设计计算与分析。

第1/50页 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。