英语人>网络例句>control of flood 相关的网络例句
control of flood相关的网络例句

查询词典 control of flood

与 control of flood 相关的网络例句 [注:此内容来源于网络,仅供参考]

Kashiba company's products and reasonable price, we supply fragrance bottles; perfume oil; incense crystal ball; bead-shaped incense crystal ball; porcelain flower fragrance bottles; pistil head; platinum catalytic core head; Whitening Mask; Beauty Essence; Rose Water ; lavender eye; shock fragrance machine; deodorant; pure plant essential oils; massage oil; composite oil; fragrant necklace; aromatic Charm; room fragrance products; emergency flood control sandbag; their feet detox machine; anion feet or energy meter; electrode plate; electrode ball; energy ball; feet or machine manufacturing and sales of other products, please consult.

香芝公司产品价位合理,我们供应香薰瓶;薰香精油;香晶球;圆珠形香晶球;瓷花芳香瓶;蕊头;白金催化蕊头;美白面膜;美容精华液;玫瑰水;薰衣草眼罩;震荡飘香机;除臭剂;纯植精油;按摩精油;复合精油;芳香项链;芳香吊饰;室内芳香产品;紧急防洪沙袋;泡脚排毒机;负离子泡脚能量仪;电极板;电极球;能量球;泡脚机等产品制造与销售,欢迎咨询。

The Fen 1 Reservoir, as the short term regulating reservoir of SM Connection Works, also has the sedimentation problem. With the increasing sedimentation and the useful storage decreasing, the reservoir is losing the ability of regulating and a new reservoir will be needed to build upstream the river. In this case, in order to determine the operation mode of the reservoir in flood season, the joint operation of Fen 1, Fen 2 and Haoshuigou reservoir, the density flow desilting rule and the control mode of the Fen 1 reservoir, we analyze the disilting for the regulating reservoir of Wanjiazhai Yellow River Diversion Project Connection Works.

汾河水库作为引黄工程南干联接段的近期调节水库,也存在泥沙淤积问题;随着汾河水库泥沙淤积的加剧,兴利库容将逐年减少并逐渐失去对引黄水的调节能力,需要在上游修建新的调节水库,在这种情况下,进行了万家寨引黄工程联接段调节水库泥沙冲淤分析研究,主要目的就是确定南干调节水库汛期运用方式、汾河水库、汾河二库、好水沟水库联合运用的淤积形态,以及汾河水库异重流排沙规律和汾河水库的运行调度方式。

This paper introduced the flood control,dam safety monitoring and maintenance of hydraulic structures,to promote safety management,ensure the safety of structures for greater benefit.

主要介绍了宝珠寺水电站在防汛、大坝安全监测、水工建筑物维护等方面的情况,以促进今后水工建筑物的安全管理工作,确保工程安全和发挥更大的效益。

The biomass of reed community in bank of yellow river was greater than that in flood control dam, while the later is greater than that in shoal.

不同生境中芦苇群落的生物量表现为:生长在黄河河道的大于生长在防洪坝以内大于生长在滩涂上的。

The Branch of Sediment Engineering and Flood Control occupies over 5000 m2 including flumes hall and physical model hall etc.

泥沙与防洪实验大厅建筑面积5000多平方米,包括河工模型实验大厅、水槽实验大厅等,分别具有完备的浑水、清水循环供水系统。

Li Yong'an, Three Gorges Project welcomed in three milestones in 2003, namely water filling of the reservoir, operation of the ship lock and power production of the generating unit; and further in September 2005, the 14 sets of hydro-turbine generating unit (700MW each) of the left-bank powerhouse were all connected on-line for power production; and in May 2006, approximate 10 months ahead of the preliminary design schedule and 2 years ahead of the expectation of the flood control performance, the Three Gorges Dam was completed and fully reached to its designed crest elevation of 185m, able to impound water with the whole structure of dam.

历任清江水电开发公司总经理兼湖北省人民政府副秘书长,中国三峡总公司副总经理。在李永安先生的领导下,长江三峡工程于2003年实现了蓄水、通航和发电三大目标,2005年9月左岸电站14台700MW水轮发电机组全部投产发电,2006年5月三峡主体工程大坝全线到达185米设计坝顶高程,具备全线挡水能力,工期比初步设计工期提前约10个月,提前两年发挥防洪能力。2006年10月,三峡水库蓄水至156米。

Fujian Flood Control and Drought Relief Headquarters on the 18th consultation pointed out that "Mola Fei" will affect the central and southern coastal areas of Fujian, we should focus on preventing high winds, torrential rains and resulting flash floods caused by geological disasters.

福建省防汛抗旱指挥部18日会商指出,&莫拉菲&将影响福建中南部沿海地区,要重点防范大风、暴雨和由此引起的山洪地质灾害。

The apparent success of this suers flood control effort doesnt alter the fact a massive effort will be required to complete the reconstruction program .

本年夏天的洪水控制博得了显然的,这并不能转折必要付出重大的勤恳来完重建使命这一究竟。

Due to the construction development and rebuilding of the old city in Linyi, though the city's flood-control and waterlog-drain system have been improved for several times, there are still many problems at present such as low standards, too many obstructive buildings in riverways and unmatched branch projects.

随着临沂城市建设的发展和旧城改造,城市防洪、排涝体系虽然经过几次治理,但临沂城现状防洪排涝体系仍普遍存在着标准低、河道阻水建筑物多、支流工程不配套等问题。

At present masonry or concrete revetments are used in river renovation. Although this meets the requirements of urban flood control, masonry and concrete colors cannot fit the surrounding landscape, the manmade separation of water and soil lacks the organic integration of security, eco-system and landscape.

目前河道整治采用浆砌石护岸或混凝土护岸的方式,虽能满足城市防洪的要求,但砌筑成型后颜色单调,不能与周边环境景观相适应,且人为地把河水与土体分开,缺乏安全性与生态系统及景观的有机结合。

第12/13页 首页 < ... 5 6 7 8 9 10 11 12 13 > 尾页
推荐网络例句

Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.

在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。

In fact,I've got him on the satellite mobile right now.

实际上 我们已接通卫星可视电话了

The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.

世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。