查询词典 contractor
- 与 contractor 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In case a contractor deceases during the term of a contract, the successor of the deceased contractor may continue the contract.
承包人在承包期内死亡的,该承包人的继承人可以继续承包。
-
If the overall contractor jobbed out to subcontractors, the overall contractor should assume responsibility with subcontractors for the quality of projects under subcontracts.
第五十五条建筑工程实行总承包的,工程质量由工程总承包单位负责,总承包单位将建筑工程分包给其他单位的,应当对分包工程的质量与分包单位承担连带责任。
-
Entrusts with the construction project contractor first to receive recompenses the power, besides safeguards contractor project funds the creditor's rights the realization, safeguards construction worker's wages more importantly.
赋予建设工程承包人优先受偿权,除了保障承包人工程款这一债权的实现外,更重要的是保障建筑工人的工资收入。
-
The contractor first receives recompenses the power and the general mortgage occurs competes fashionably, should by establish the time to determine successively the precedence, our country will have the necessity in the future legislation explicitly to stipulate the contractor first will receive recompenses the power to be supposed to pass through the registration only then to live the potency.
承包人优先受偿权与一般抵押权发生竞合时,应以成立时间的先后来确定优先次序,我国有必要在将来的立法中明确规定承包人的优先受偿权应经登记才生效力。
-
An even more serious problem would be if the contractor or sub-contractor sues you, for whatever reason.
一个更严重的问题是如果承包或分包商要控告你,不论原因。
-
Should it be found necessary for the Contractor to move one or more loads of Constructional Plant,machinery or pre一constructed units or parts of units of work over part of a highway or bridge,the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out,then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineers Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengtheningis carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
Should-it be found necessary for the Contractor to move one or more loads of Constructional Plant , machinery or pre-constructed units or parts of units of work over part of a highway or bridge , the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out , then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge .
如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
2Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
A few people took note when the U.S. Internal Revenue Service ruled earlier this month that a former contractor whom we had worked with as part of our Second Life "greeters" program should be classified as an employee rather than an independent contractor.
很少人注意到月初出台新规定,先前在我们生活中一直以数字人生&引领者&形象出现的美国国内税务承包商如今应被划入企业雇员的范畴,而不再是一位独立的承包商了。
- 相关中文对照歌词
- Contractor
- 推荐网络例句
-
The absorption and distribution of chromium were studied in ryeusing nutrient culture technique and pot experiment.
采用不同浓度K2CrO4(0,0.4,0.8和1.2 mmol/L)的Hoagland营养液处理黑麦幼苗,测定铬在黑麦体内的亚细胞分布、铬化学形态及不同部位的积累。
-
By analyzing theory foundation of mathematical morphology in the digital image processing, researching morphology arithmetic of the binary Image, discussing two basic forms for the least structure element: dilation and erosion.
通过分析数学形态学在图像中的理论基础,研究二值图像的形态分析算法,探讨最小结构元素的两种基本形态:膨胀和腐蚀;分析了数学形态学复杂算法的基本原理,把数学形态学的部分并行处理理念引入到家实际应用中。
-
Have a good policy environment, real estate, secondary and tertiary markets can develop more rapidly and improved.
有一个良好的政策环境,房地产,二级和三级市场的发展更加迅速改善。